If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22159 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.491167,"lon":-79.713472,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: CORENO 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-01-05 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.491167 | |
Longitude: -79.713472 |
Date | Event |
---|---|
2011-01-05 | New Permit Application |
2011-06-07 | Performed Spud Operation |
2011-06-15 | Drilling Completion |
2011-06-22 | Perforation |
2012-01-23 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 799.00 | 92 | 27.80 | 92 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 2,430.00 | 366 | 48.70 | 366 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 558.00 | 365 | 20.68 | 365 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 1,838.00 | 335 | 141.36 | 335 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 2,951.57 | 365 | 208.63 | 60 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 2,380.99 | 366 | 99.52 | 31 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 2,555.00 | 365 | 132.59 | 365 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 1,458.70 | 334 | 76.28 | 30 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 2,042.13 | 365 | 28.75 | 31 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PENNECO OIL CO INC | Fracing Fluid Waste | 1,230.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | PENNECO OIL CO INC | Drilling Fluid Waste | 160.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | PENNECO OIL CO INC | Drilling Fluid Waste | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2012 | PENNECO OIL CO INC | Produced Fluid | 45.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2014 | PENNECO OIL CO INC | Produced Fluid | 35 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 35.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 19 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 19.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2017 | PENNECO OIL CO INC | Produced Fluid | 52.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1981592 | Primary Facility | 2011-05-18 | Drilling/Alteration | No Violations Noted | ACCESS AND PAD UNDER CONSTRUCTION. |
1981612 | Primary Facility | 2011-06-01 | Drilling/Alteration | No Violations Noted | SITE BUILT. PITS ARE EXCAVATED. |
1983200 | Primary Facility | 2011-06-13 | Drilling/Alteration | No Violations Noted | RIG DOWN FOR 7" CEMENT TIME. |
1983207 | Primary Facility | 2011-06-08 | Drilling/Alteration | No Violations Noted | US ENERGY RUNNING 13 3/8" CASING THROUGH MINE VOID. |
1983774 | Primary Facility | 2011-05-15 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. SITE IS CLEAN. |
1984641 | Primary Facility | 2011-06-01 | Routine/Complete Inspection | No Violations Noted | On June 1st , 2010 I conducted a routine inspection of the above site. The site was under construction. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. Pit construction had started. |
1985311 | Primary Facility | 2011-06-08 | Routine/Complete Inspection | No Violations Noted | On June 8th , 2011 I conducted a routine inspection of the above site. Drilling was started; the conductor was in place. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit appeared to be in good condition. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1986480 | Primary Facility | 2011-06-14 | Routine/Complete Inspection | No Violations Noted | On June 14th , 2011 I conducted a routine inspection of the above site. Drilling was ongoing. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit appeared to be in good condition but was approaching the freeboard limit. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1991803 | Primary Facility | 2011-07-11 | Drilling/Alteration | No Violations Noted | THIS WELL IS COMPLETE. THERE IS NO JACK. |
1991804 | Primary Facility | 2011-07-06 | Drilling/Alteration | No Violations Noted | WELL FRACED. RODS AND TUBING ARE IN. |
1993484 | Primary Facility | 2011-07-26 | Routine/Complete Inspection | No Violations Noted | On July 26th , 2011 I conducted a routine inspection of the above site. Drilling was complete. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was closed and the site was graded, seeded, and mulched. Some growth was starting. No spills, leaks, or accelerated erosion were observed at the time of inspection |
2054292 | Primary Facility | 2012-03-06 | Routine/Complete Inspection | No Violations Noted | THIS IS A PRODUCING GAS WELL. |
2116692 | Primary Facility | 2012-10-25 | Routine/Complete Inspection | No Violations Noted | A WELL MAINTAINED OIL AND GAS WELL. THE SITE IS RESTORED. |
For data sources see[7]