X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-003-22074

Well Details

Well ID: 37-003-22074
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Penn Hills Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: KICKLER 1
License Status:
Spud Date:
Permit Date: 2009-08-21
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.486770
Longitude: -79.823704

For data sources see[1][2][3]

Well History

Date Event
2009-08-21 New Permit Application
2010-05-19 Performed Spud Operation
2010-06-01 Drilling Completion
2010-06-09 Perforation
2013-04-22 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 2,397.00 153 299.51 153 0.00 0
2011 PENNECO OIL CO INC 8,423.00 365 480.36 365 0.00 0
2012 PENNECO OIL CO INC 11,578.00 366 304.64 366 0.00 0
2013 PENNECO OIL CO INC 9,249.00 365 311.42 365 0.00 0
2014 PENNECO OIL CO INC 7,851.00 365 203.11 365 0.00 0
2015 PENNECO OIL CO INC 7,103.34 365 164.14 61 0.00 0
2016 PENNECO OIL CO INC 8,058.70 366 220.87 62 0.00 0
2017 PENNECO OIL CO INC 7,524.00 365 223.97 365 0.00 0
2018 PENNECO OIL CO INC 12,958.77 365 257.15 92 0.00 0
2019 PENNECO OIL CO INC 13,910.53 365 168.75 61 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PENNECO OIL CO INC Fracing Fluid Waste 930.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PENNECO OIL CO INC Drilling Fluid Waste 1,140.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PENNECO OIL CO INC Produced Fluid 365.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2018 PENNECO OIL CO INC Produced Fluid 33.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2019 PENNECO OIL CO INC Produced Fluid 38.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1890256 Primary Facility 2010-05-27 Routine/Complete Inspection No Violations Noted On May 27 2010, I conducted a routine inspection of the above site. Drilling was taking place at the time of inspection. Site ID and E&S plan were posted. Access road was in good condition. Pits appeared to be in good condition. The operator should continue to inspect and maintain E&S controls routinely and after each significant rainfall event.
1893074 Primary Facility 2010-06-10 Routine/Complete Inspection No Violations Noted On June 10th, 2010 I conducted a routine inspection of the above site. Drilling was completed at the time of the inspection. A swabbing rig was on site. The frac pit had been constructed. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The pits appeared to be in good condition. All E&S controls were in place and constructed according to the plan at site. The operator should continue to inspect and maintain the E&S controls routinely and after each significant runoff event.
1894549 Primary Facility 2010-06-28 Routine/Complete Inspection No Violations Noted On June 28th, 2010, I visited this site as a routine inspection. Drilling was completed. The access road was in good condition. Site ID and E&S plan were posted on site. The drilling pits had begun to be filled. No spills, leaks, or accelerated erosion was observed at the time of inspection. The operator should continue to inspect and maintain the E&S controls until the site is fully restored and 70% uniform vegetative cover is established.
1894767 Primary Facility 2010-05-18 Drilling/Alteration No Violations Noted e&s ok no rig yet
1895083 Primary Facility 2010-06-15 Drilling/Alteration No Violations Noted DRILLING COMPLETE. PIT LEVEL OK.CITE IS CLEAN AND DOZED.THE ACCESS ROAD IS STONED. WELL IS SHUT IN.
1895121 Primary Facility 2010-05-25 Drilling/Alteration No Violations Noted HILL DRILLING@1862 FT. SITE,E&S,AND ACCESS,OK.
1895126 Primary Facility 2010-05-28 Drilling/Alteration No Violations Noted HILL DRILLING AT 3811 FT. SITE,PIT,E&S,AND ACCESS,OK.
1912804 Primary Facility 2010-08-18 Routine/Complete Inspection No Violations Noted On August 18th, 2010 I conducted a routine inspection of the above site. Drilling was completed at the time of the inspection. The well was in production. The site was seeded and mulched and growth was coming in well. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Some sediment was beginning to lay against the silt fence. The operator should continue to inspect and maintain the E&S controls routinely and after each significant runoff event.
1957914 Primary Facility 2011-02-08 Routine/Complete Inspection No Violations Noted On February 8th, 2011 I conducted a routine inspection of the above site. Drilling was completed and the well was in production. A wel tag was present. The access road was in good condition. Two tanks were onsite surrounded by an earthen dike. No spills/leaks or accelerated erosion were observed at the time of inspection.

For data sources see[7]

References