If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22064 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.230564,"lon":-79.964083,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Forward Township | |
Operator Name: K PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: WILLIAMS UNIT 1-P406 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-07-09 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.230564 | |
Longitude: -79.964083 |
Date | Event |
---|---|
2009-07-09 | New Permit Application |
2009-12-02 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | MTN V OIL & GAS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | MTN V OIL & GAS INC | 2,449.00 | 219 | 0.00 | 0 | 0.00 | 0 |
2011 | HAYDEN HARPER ENERGY KA LLC | 2,432.17 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | HAYDEN HARPER ENERGY KA LLC | 2,529.00 | 323 | 0.00 | 0 | 0.00 | 0 |
2013 | HAYDEN HARPER ENERGY KA LLC | 3,348.50 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | HAYDEN HARPER ENERGY KA LLC | 4,014.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | K PETROLEUM INC | 2,981.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | K PETROLEUM INC | 2,398.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | K PETROLEUM INC | 1,883.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | K PETROLEUM INC | 1,758.22 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | K PETROLEUM INC | 1,296.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | HAYDEN HARPER ENERGY KA LLC | Produced Fluid | 15.00 Bbl | INJECTION DISPOSAL WELL | 34-167-29395 |
2014 | HAYDEN HARPER ENERGY KA LLC | Produced Fluid | 41.00 Bbl | INJECTION DISPOSAL WELL | 2D0732540 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1838334 | Primary Facility | 2009-10-02 | Drilling/Alteration | No Violations Noted | SPUD CALL 9/30/09. CONTRACTIR HAD JUST STARTED ACCESS ROAD. |
1851536 | Primary Facility | 2009-12-16 | Drilling/Alteration | No Violations Noted | RIG IS GONE. ALLANS HAULING PIT WATER. |
1851539 | Primary Facility | 2009-12-08 | Drilling/Alteration | No Violations Noted | SETTING CONDUCTOR @ 99'. |
1851704 | Primary Facility | 2009-12-22 | Drilling/Alteration | No Violations Noted | KEY ENERGY RUNNING WIRELINE LOG. |
1865343 | Primary Facility | 2010-02-24 | Routine/Complete Inspection | Violation(s) Noted | Drilling was completed. |
1873733 | Primary Facility | 2010-03-31 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | Drilling was completed. |
1893198 | Primary Facility | 2010-06-08 | Compliance Evaluation | No Violations Noted | On June, 8th 2010 I conducted a CEI inspection of the above site in response to violations noted on 2/24/2010. The well was in production at this time. The well site appeared to be in compliance at this time. It appears that E&S controls were never installed as indicated on the E&S plan. E&S controls installed on the stream crossings were constructed improperly. However, the site is restored now, the access road is rocked and in good condition. The site was seeded and mulched and has achieved the minimum 70% vegetative cover |
1915788 | Primary Facility | 2010-08-23 | Routine/Complete Inspection | No Violations Noted | WELL COMPLETE. SITE RESTORED AND VEGETATED. WELL HAS A DUMP SYSTEM ANDBRINE TANK. ACCESS IS STONED. |
1931278 | Primary Facility | 2010-11-17 | Routine/Complete Inspection | No Violations Noted | On November 17th 2010 I conducted a routine inspection of the above site. The well was in production. The access road was in good condition and gated. A well tag was present. The tank had a dike constructed around it. There was no accelerated erosion and no spills or leaks observed at the time of inspection. |
2774134 | Primary Facility | 2018-09-12 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1865343 | 581998 | 02/24/2010 | 2010-02-24 | 105.46 - Permittee has failed to implement Erosion and Sedimentation control plan. | Environmental Health & Safety | |
1865343 | 581999 | 02/24/2010 | 2010-02-24 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1865343 | 582000 | 02/24/2010 | 2010-02-24 | 401CAUSEPOLL - Polluting substance(s) allowed to discharge into Waters of the Commonwealth. | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
581998 | 255413 | NOV - Notice of Violation | Comply/Closed | 2010-06-08 | |||
581998 | 264423 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-12 | 2010-11-12 | $15,975.00 | $15,975.00 |
581999 | 255413 | NOV - Notice of Violation | Comply/Closed | 2010-06-08 | |||
581999 | 264423 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-12 | 2010-11-12 | $15,975.00 | $15,975.00 |
582000 | 255413 | NOV - Notice of Violation | Comply/Closed | 2010-06-08 | |||
582000 | 264423 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-12 | 2010-11-12 | $15,975.00 | $15,975.00 |
For data sources see[7]