If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-21722 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.75,"lon":-81.69,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Sugar Creek Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: YODER DAN E | |
License Status: Producing | |
License Date: 1972-09-28 | |
Spud Date: 1972-10-19 | |
Spud Drilling Contractor: | |
Final Drill Date: 1972-12-06 | |
Well Total Depth: 4173.00 ft | |
Configuration: Vertical | |
Latitude: 40.750000 | |
Longitude: -81.690000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1972-09-28 | 3368 WEISER WILLIAM D GeoDate 9/28/72 |
Original Spud | 1972-10-19 | |
Completed | 1972-12-06 | |
Reached Total Depth | 1972-12-06 | |
Change of Owner | 2002-05-03 | Operator changed from 3368, WEISER WILLIAM D to 337, HARLEY DRILLING & PRODUCI |
Record Last Modified | 2019-06-04 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1000 Bbl | 22000 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | MASON JOHN C | 5435.00 | 381.00 | 0 |
1985 | MASON JOHN C | 4404.00 | 299.00 | 365 |
1986 | MASON DRILLING INC | 3385.00 | 230.00 | 365 |
1987 | MASON DRILLING INC | 3948.00 | 226.00 | 365 |
1988 | MASON DRILLING INC | 3712.00 | 225.00 | 365 |
1989 | MASON DRILLING INC | 2659.00 | 75.00 | 152 |
1990 | WEISER WILLIAM D | 0.00 | 148.00 | 365 |
1991 | MASON DRILLING INC | 2087.00 | 0.00 | 365 |
1992 | WEISER WILLIAM D | 0.00 | 77.00 | 365 |
1993 | WEISER WILLIAM D | 0.00 | 149.00 | 365 |
1994 | WEISER WILLIAM D | 0.00 | 159.00 | 365 |
1995 | WEISER WILLIAM D | 0.00 | 76.00 | 365 |
1996 | WEISER WILLIAM D | 0.00 | 78.00 | 365 |
1997 | WEISER WILLIAM D | 1365.00 | 73.00 | 365 |
1998 | WEISER WILLIAM D | 1417.00 | 77.00 | 350 |
1999 | WEISER WILLIAM D | 1241.00 | 80.00 | 365 |
2000 | WEISER WILLIAM D | 1478.00 | 82.00 | 365 |
2001 | WEISER WILLIAM D | 1006.00 | 84.00 | 365 |
2002 | HARLEY DRILLING & PRODUCING LT | 432.00 | 97.00 | 259 |
2003 | HARLEY DRILLING & PRODUCING LT | 122.00 | 0.00 | 365 |
2004 | HARLEY DRILLING & PRODUCING LT | 59.00 | 76.00 | 365 |
2005 | HARLEY DRILLING & PRODUCING LT | 8.00 | 80.00 | 365 |
2008 | HARLEY DRILLING & PRODUCING LT | 117.00 | 0.00 | 365 |
2009 | HARLEY DRILLING & PRODUCING LT | 375.00 | 157.00 | 365 |
2010 | HARLEY DRILLING & PRODUCING LT | 385.00 | 70.00 | 365 |
2011 | HARLEY DRILLING & PRODUCING LT | 489.00 | 62.00 | 365 |
2012 | HARLEY DRILLING & PRODUCING LT | 423.00 | 154.00 | 366 |
2013 | HARLEY DRILLING & PRODUCING LT | 450.00 | 73.00 | 365 |
2014 | HARLEY DRILLING & PRODUCING LT | 538.00 | 0.00 | 365 |
2015 | HARLEY DRILLING & PRODUCING LT | 165.00 | 0.00 | 365 |
2016 | HARLEY DRILLING & PRODUCING LT | 597.00 | 150.00 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | 494.00 | 77.00 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | 437.00 | 73.00 | 365 |