34-167-29742

Well Details

Well ID: 34-167-29742
Loading map...
Country: United States
State: Ohio
County: Washington
Municipality: Barlow Township
Operator Name: ANDERSON BOBBY B
Well Pad ID:
Farm/Lease Name: NELSON UNIT
License Status: Producing
License Date: 2014-05-13
Spud Date: 2014-06-09
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 2014-06-18
Well Total Depth: 869.00 ft
Configuration: Vertical
Latitude: 39.430000
Longitude: -81.640000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-05-13 Proposed Formations:COW RUN, Issued Date:5/13/2014, Expired Date:5/12/2016 12:00:00 PM, Drilling unit acres:8.7, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-06-18
Completion Report Received 2015-01-14
Construction Permit Expires 2016-05-12
Record Last Modified 2017-10-23

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-08-04 GEL 0 45 Lbs 0 OTHER This well is open hole completion and was shot with 45 lbs of Dyno Nobel Gelled Shot to stimulate oil and gas production. The shots were placed from 867' to 845'. 15' of wire line was left in the hole and will be fished out.
2014-10-02 GEL 0 45 Lbs 0 OTHER Well was shot with 36 sticks of SPO900 gelled expolosives from 812-827'. Jet Wireline Services was the contractor who shot this well for Mr. Bobby Anderson.

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ANDERSON BOBBY B 0.00 0.00 85
2015 ANDERSON BOBBY B 0.00 8.00 85
2016 ANDERSON BOBBY B 0.00 8.00 85
2017 ANDERSON BOBBY B 0.00 0.00 85
2018 ANDERSON BOBBY B 0.00 0.00 85

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ANDERSON BOBBY B Brine 0 85
2015 ANDERSON BOBBY B Brine 0 85
2016 ANDERSON BOBBY B Brine 0 85
2017 ANDERSON BOBBY B Brine 0 85
2018 ANDERSON BOBBY B Brine 0 85

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1516090382 2014-6-18 0:00: CS No Violations 3.00
-1844062473 2014-6-13 0:00: DD No Violations 7.00
-1896479921 2014-8-4 0:00:0 DD No Violations 6.00
-1943150484 2014-10-1 0:00: AM No Violations 0.10
0143022138 2016-01-19 Production Wells No Violations Upon inspection, it was observed that the drilling rig has been removed from the location and a 100 bbl production tank has been set within an earthen dike. The well is in production and consists of 7 surface casing, 4.5 production casing, and 2 production tubing. Due to snowy conditions, I was unable to determine whether the preliminary restoration for the location is satisfactory. I will return to the location this spring to evaluate the preliminary restoration. I was accompanied on this inspection by DOGRM Geologist Jake Glascock.
1217922092 2014-06-10 Drill / Deepen / Reopen No Violations Drive pipe has been set in hole. 21 ft. of 9.875 in. hole was drilled and suitable bedrock was found. A 25 ft. joint of 9.625 in pipe was driven in the hole. 4 ft is sticking above ground. Spoke with Mr. Bobby Anderson on site. Accompanied by Inspector LJ Parkins.
136044169 2020-6-19 0:00: PL No Violations 0.30
1401832112 2014-06-03 Drill / Deepen / Reopen No Violations The location has been built and the drilling rig is in place. I spoke with Mr. Ben Anderson on site. We discussed the placement of the pit with the contractors. We also discussed the casing program and cement.
143022138 2016-1-19 0:00: PW No Violations 1.00
1471251103 2014-06-09 Drill / Deepen / Reopen No Violations Drilling rig is stood up and there is one piece of drill pipe with the drill bit on it. The pit was dug, but had no liner in it. Drilling had not been started due to their air compressor being down. I spoke with Mr. Bobby Anderson over the phone.
1516090382 2014-06-18 Casing String Witnessed No Violations Witnessed the cementing of the production string on this well. 769 ft. of 4.5 in. casing was ran in 868 ft. of 6.25 in. hole. Good circulation was achieved and kept throughout the job. After the plug landed the pipe was tested at 750 psi. and it passed.
1844062473 2014-06-13 Drill / Deepen / Reopen No Violations Witnessed the running and cementing of 300 of 7 surface casing. Good circulation was witnessed and the hole was conditioned with cottonseed hulls as LCM. Cement was run with a 2% mixture of calcium chloride. Good cement returnns were witnessed at the surface. The cement dropped approximately 1 in the first 10 minutes after cementing. Formation Cementing topped off the cement back to surface and it stayed. A pressure test will be performed on Monday, 6/16/2014.
1896479921 2014-08-04 Drill / Deepen / Reopen No Violations Visited this well location to witness well logging and stimulation activities. Timco Well Services was on location to run a gamma/neutron log to find which zones to perforate. A cement bond log was also run to verify the top of cement (TOC). TOC was found to be at 345 below surface. The well was shot from 867 to 845 with 45 lbs of Dyno Nobel RDX/PETN gelled wireline explosives. 15 of wire was left in the well and will be fished out by Mr. Bobby Andersons service rig.
1943150484 2014-10-01 Administrative Inspection No Violations Mr. Bobby Anderson contacted me via phone call at 2:00 pm and informed me that he has scheduled JT Well Surveys to log this well and shoot it at 10:30 am on 10/2/2014. This will be the second attempt at shooting this well to stimulate production.
2008593260 2014-06-16 Drill / Deepen / Reopen No Violations Witnessed pressure testing of the 7 surface casing that was ran and cemented on 6/13/2014. The pressure test commenced at 9:42 a.m. at 350 p.s.i. and ended at 10:12 a.m. at 310 p.s.i. There was a slight leak on the 2 valve on the cement head, which accounted for most of the drop in pressure. The pressure test was considered satisfactory and the O.K. was given to continue deepening.

For data sources see[8]

References