X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-157-25487

Well Details

Well ID: 34-157-25487
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Clay Township
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: GENERAL CLAY PRODUCTS
License Status: Producing
License Date: 2011-10-20
Spud Date: 2011-10-28
Spud Drilling Contractor: WARREN DRLG
Final Drill Date: 2011-11-08
Well Total Depth: 7505.00 ft
Configuration: Vertical
Latitude: 40.310000
Longitude: -81.480000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-10-20 Proposed Formations:OHIO SHALE THRU KNOX, Issued Date:10/20/2011, Expired Date:10/19/2013 12:00:00 PM, Drilling unit acres:116.68, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2011-10-28 CORRECTION TO FOOTAGE
Reached Total Depth 2011-11-08
Completion Report Received 2012-01-06
Construction Permit Expires 2013-10-19
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-01-25 7375 7406 41
7375 7406 41
7375 7406 41

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-11-15 ACID 15 13064 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 ARTEX OIL COMPANY 33598.00 0.00 366
2013 ARTEX OIL COMPANY 23408.00 0.00 365
2014 ARTEX OIL COMPANY 16515.00 0.00 365
2015 ARTEX OIL COMPANY 13890.00 30.00 365
2016 ARTEX OIL COMPANY 11242.00 0.00 365
2017 ARTEX OIL COMPANY 6687.00 0.00 365
2018 ARTEX OIL COMPANY 7757.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 ARTEX OIL COMPANY Brine 3724 366
2013 ARTEX OIL COMPANY Brine 0 365
2014 ARTEX OIL COMPANY Brine 48 365
2015 ARTEX OIL COMPANY Brine 0 365
2016 ARTEX OIL COMPANY Brine 0 365
2017 ARTEX OIL COMPANY Brine 0 365
2018 ARTEX OIL COMPANY Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0598997076 2019-04-25 Production Wells No Violations Upon arrival on location, I witnessed the well was equipped 8.625 inch diameter casing, 4.5 inch diameter casing, 2.375 inch diameter tubing, and a plunger lift system. The well was shut in at the time of the inspection. Production equipment included a steel 210 barrel tank, a horizonal separator, and a chart recorder with a 2 by 1.250 inch orifice plate. The tank was inside an earthen dike. The production report was up to date and proper identification was present.
1329154957 2011-11-12 Drill / Deepen / Reopen No Violations On location for surface job. Ran and cemented 1,239 of 8 5/8.
1387550077 2013-12-20 Preliminary Restoration No Violations On the day of my inspection I witnessed that there was a 210bbl tank, a horizontal separator and a sales meter with a 1 inch orifice. The well was equipped with an 8.625 inch wellhead, 4.5 inch wellhead, 2.375 inch tubing with a rabbit catcher and valves were open. Identification is present and production records are up to date. The site passed preliminary restoration according to 1509.072A.
598997076 2019-4-25 0:00: PW No Violations 0.50

For data sources see[9]

References