If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-25484 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.32,"lon":-81.32,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Rush Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: TATMAN | |
License Status: Producing | |
License Date: 2011-08-12 | |
Spud Date: 2011-12-08 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2011-12-13 | |
Well Total Depth: 3850.00 ft | |
Configuration: Vertical | |
Latitude: 40.320000 | |
Longitude: -81.320000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-08-12 | Proposed Formations:ORISKANY, Issued Date:8/12/2011, Expired Date:8/11/2013 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-12-13 | |
Correction to Well | 2012-04-06 | CORRECTION TO PROPOSED GEOLOGICAL FORMATION. |
Construction Permit Expires | 2013-08-11 | |
Completion Report Received | 2013-09-17 | |
Change of Owner | 2017-10-17 | Operator changed from 6866, ATLAS NOBLE LLC to 8685, M & R INVESTMENTS OHIO LLC |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-09-17 | 3410 | 3478 | 30 |
2013-09-17 | 3762 | 3772 | 60 |
3410 | 3478 | 30 | |
3762 | 3772 | 60 | |
3410 | 3478 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-03-15 | H2O | 8 | 1200 Gal | 67400 | Producers Service Corporation | STAGE 2 |
2012-03-14 | H2O | 8 | 72723 Gal | 20000 | Producers Service Corporation | STAGE 1 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | ATLAS NOBLE LLC | 1852.00 | 1219.00 | 266 |
2013 | ATLAS NOBLE LLC | 2161.00 | 665.00 | 365 |
2014 | ATLAS NOBLE LLC | 1352.00 | 254.00 | 365 |
2015 | ATLAS NOBLE LLC | 1251.00 | 342.00 | 365 |
2016 | ATLAS NOBLE LLC | 1507.00 | 459.00 | 366 |
2017 | ATLAS NOBLE LLC | 845.00 | 493.00 | 182 |
2018 | M & R INVESTMENTS OHIO LLC | 1440.00 | 455.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | ATLAS NOBLE LLC | Brine | 4260 | 266 |
2013 | ATLAS NOBLE LLC | Brine | 1054 | 365 |
2014 | ATLAS NOBLE LLC | Brine | 1127 | 365 |
2015 | ATLAS NOBLE LLC | Brine | 727 | 365 |
2016 | ATLAS NOBLE LLC | Brine | 1402 | 366 |
2017 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 182 |
2018 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1390723141 | 2016-4-15 0:00: | PW | No Violations | 1.00 |
0084907848 | 2016-04-14 | Production Wells | No Violations | I received a phone call from Chris Belch with Atlas Energy requesting a inspect of the tank battery where the oil spill accrued. There is no indication of any free oil on the water in the dike. The gravel still needs some bio-sorb or lime used to complete the cleanup on the stone. The cleanup has come along very nicely. |
0494580975 | 2014-09-22 | Production Wells | No Violations | I received a call at 11:00am from Lisa Raffle with Atlas Energy stating that a spill had occurred at he Tatman # 6 well. The amount of the spill was approximately 3 bbls of crude oil and brine. The well pump jack controller was left on manual, causing the tank to overflow. All fluids were contained in the dike system. When I arrived on location I found that a crew of Atlas employees was already cleaning up the spill. A vacuum truck was used to clean up all free fluids. There was no off site exposure to the fluids. Remediation in place shall be done. |
1390723141 | 2016-04-15 | Production Wells | No Violations | Upon arrival on location I found that the cleanup has been completed. There are no signs of free oil in the dike. A coating of Bio-sorb is in place in the dike. |
1411487551 | 2014-09-23 | Production Wells | No Violations | On the day of my inspection I found the employees of Atlas Energy completing the clean up and the remediation of the spill that had occurred. Will re-inspect in 3 to 4 days. |
1414083371 | 2014-10-23 | Production Wells | No Violations | On the day of my inspection, this is a follow up to the reported spill. The dike is still in need of some remediation. Most of the clean up has been effective. The dike has rain water in the dike at this time and there is a small amount of oil scum on the northwest Connor of the dike. I placed a phone call to Chuck with Atlas and discussed the need to use a vacuum truck to remove the water and the oil scum. Chuck agreed to get it done. |
1460485139 | 2016-04-12 | Production Wells | No Violations | I received a phone call from Lisa Raffle with Atlas Energy, at 12:30 pm reporting that they had an oil release in the tank battery. The dump valve on the separator failed in the open position allowing oil to flow out the top of the tank. The release amount is about 10 to 15 gallon of oil. The oil is contained within the dike area. A crew with Atlas Energy is on site and is doing the cleanup. A vacuum truck is removing the fluid in the dike and they are using a power washer to wash down the tanks and the gravel in the dike area. Chris Belch with Atlas Energy is in charge of the cleanup. I placed a phone call to Scott King as he was the Emergency Response Duty Office of the day. |
1460635853 | 2016-04-13 | Production Wells | No Violations | Upon arriving on location I found The Atlas Energy crew continuing cleanup. Absorbent pads are being used and they are still using the power washer. Most of the oil has been recovered and will need to continue monitoring. |
1976421429 | 2011-12-10 | Production Wells | No Violations | On location for surface job. Pits ok. |
2080799710 | 2013-08-06 | Preliminary Restoration | No Violations | Everything passed according to 1509.072A. |
494580975 | 2014-9-22 0:00: | PW | No Violations | |
84907848 | 2016-4-14 0:00: | PW | No Violations |
For data sources see[9]