X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-157-24593

Well Details

Well ID: 34-157-24593
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Rush Township
Operator Name: S & S ENERGY CORP
Well Pad ID:
Farm/Lease Name: JONES
License Status: Final Restoration
License Date: 2015-06-18
Spud Date: 1987-12-11
Spud Drilling Contractor: ADVENT DRLG
Final Drill Date: 1987-12-17
Well Total Depth: 5912.00 ft
Configuration: Vertical
Latitude: 40.320000
Longitude: -81.280000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1987-10-09 1218 LANGASCO ENERGY CORP GeoDate 10/9/87
Oil and Gas 1987-10-09 Issued Date 10/9/87 Expired Date 10/8/88 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
CO 1987-11-23 182 BELDEN & BLAKE CO GeoDate 11/23/87
Oil and Gas 1987-11-23 Issued Date 10/9/87 Expired Date 10/8/88 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05912 Proposed Drill Depth 05912
Original Spud 1987-12-11 RL. 11-28-87
Completed 1987-12-17 RL. 11-28-87
Reached Total Depth 1987-12-17 RL. 11-28-87
Completion Report Received 1988-03-07 RL. 11-28-87
Change of Owner 2002-08-12 Operator changed from 182, BELDEN & BLAKE CORPORATION to 1966, PETROX INC
Change of Owner 2005-07-08 Operator changed from 1966, PETROX, INC to 5660, S & S ENERGY CORPORATION
APP 2015-06-18 Proposed Formations:CLINTON, Issued Date:6/18/2015, Expired Date:6/17/2017 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2015-11-25 RL. 11-28-87
Construction Permit Expires 2017-06-17 RL. 11-28-87
Record Last Modified 2018-06-23 RL. 11-28-87

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 5710 5797 32
5710 5797 32
5710 5797 32

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 90000 Gal 80000 FRAC: H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 RESOURCE AMERICA INC 0.00 0.00 365
1990 BELDEN & BLAKE CORPORATION 3756.00 0.00 181
1991 BELDEN & BLAKE CORPORATION 10.00 0.00 365
1992 BELDEN & BLAKE CORPORATION 5202.00 56.00 333
1993 BELDEN & BLAKE CORPORATION 5835.00 0.00 361
1994 BELDEN & BLAKE CORPORATION 4343.00 0.00 355
1995 BELDEN & BLAKE CORPORATION 3803.00 0.00 361
1996 BELDEN & BLAKE CORPORATION 3231.00 0.00 359
1997 BELDEN & BLAKE CORPORATION 3049.00 0.00 357
1998 BELDEN & BLAKE CORPORATION 2416.00 91.00 331
1999 BELDEN & BLAKE CORPORATION 2649.00 0.00 323
2000 BELDEN & BLAKE CORPORATION 2124.00 0.00 351
2001 BELDEN & BLAKE CORPORATION 1910.00 25.00 351
2002 BELDEN & BLAKE CORPORATION 1074.00 8.00 155
2003 PETROX, INC 1900.00 7.00 365
2004 PETROX, INC 1609.00 0.00 365
2005 PETROX, INC 1211.00 0.00 180
2006 S & S ENERGY CORP 1059.00 0.00 365
2007 S & S ENERGY CORP 1392.00 0.00 365
2008 S & S ENERGY CORP 1273.00 48.00 365
2009 S & S ENERGY CORP 1522.00 65.00 365
2010 S & S ENERGY CORP 1263.00 17.00 365
2011 S & S ENERGY CORP 1120.00 0.00 365
2012 S & S ENERGY CORP 1339.00 28.00 366
2013 S & S ENERGY CORP 997.00 0.00 365
2014 S & S ENERGY CORP 177.00 0.00 365
2015 S & S ENERGY CORP 19.00 0.00 30

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 RESOURCE AMERICA INC Brine 0 365
1990 BELDEN & BLAKE CORPORATION Brine 0 181
1991 BELDEN & BLAKE CORPORATION Brine 127 365
1992 BELDEN & BLAKE CORPORATION Brine 58 333
1993 BELDEN & BLAKE CORPORATION Brine 72 361
1994 BELDEN & BLAKE CORPORATION Brine 81 355
1995 BELDEN & BLAKE CORPORATION Brine 34 361
1996 BELDEN & BLAKE CORPORATION Brine 43 359
1997 BELDEN & BLAKE CORPORATION Brine 18 357
1998 BELDEN & BLAKE CORPORATION Brine 43 331
1999 BELDEN & BLAKE CORPORATION Brine 0 323
2000 BELDEN & BLAKE CORPORATION Brine 33 351
2001 BELDEN & BLAKE CORPORATION Brine 28 351
2002 PETROX, INC Brine 18 56
2003 PETROX, INC Brine 0 365
2004 PETROX, INC Brine 0 365
2005 PETROX, INC Brine 0 180
2006 S & S ENERGY CORP Brine 0 365
2007 S & S ENERGY CORP Brine 23 365
2008 S & S ENERGY CORP Brine 157 365
2009 S & S ENERGY CORP Brine 22 365
2010 S & S ENERGY CORP Brine 66 365
2011 S & S ENERGY CORP Brine 0 365
2012 S & S ENERGY CORP Brine 78 366
2013 S & S ENERGY CORP Brine 0 365
2014 S & S ENERGY CORP Brine 0 365
2015 S & S ENERGY CORP Brine 0 30

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-100228330 2015-11-20 0:00 PB No Violations 6.00
-1709603060 2015-11-20 0:00 PB No Violations 6.00
0000PL2430 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0100228330 2015-11-20 Plug / Plug Back No Violations I was accompanied to the location by inspector Joe Zollars, please refer to his inspection report for details.
0751885591 2015-11-19 Plug / Plug Back No Violations I am on site accompanied by inspector Randy Akins to witness the plugging of this well. The bottom plug was set on 11/18/2015 from a depth of 4000-4300 feet. Today Ditty Well Service planed on having Formation Cementing setting the remainder of the plugs through the 4 1/2 inch diameter production casing. Ditty Well Service encountered problems when attempting to rip the 4 1/2 inch diameter casing. Ditty ripped at a depth of 4706. After the rip, Ditty pulled the pipe approximately 2 feet and the pipe started gaining weight. Shortly after gaining the weight the rig could not pull the string up hole any further. Ditty tried ripping the casing multiple times after this, however the casing remained seized in the hole. S&S decided to contact a wireline truck and scheduled to run a Bond log the following day to access the down hole complications. Plugging operations where then put on standby until the complications where resolved.
1447859459 2015-11-18 Plug / Plug Back No Violations On arrival on location I was accompanied by Inspector Joe Zollars. The plugging is being done by Ditty Well Service. The rig crew has ran the 1 1/2 inch tubing back into the wellbore. We will be setting the bottom plug at 5680 feet.
1448044937 2015-11-19 Plug / Plug Back No Violations I was accompanied to the location by inspector Joe Zollars, please refer to his inspection report for details.
1448386204 2015-11-24 Plug / Plug Back No Violations Upon arrival on location I found the rig crew running 1 1/2 tubing into the wellbore to set the big lime plug at a depth of 4050 feet. Established circulation and pumped cement. Pulled tubing out of wellbore
1448468526 2015-11-25 Plug / Plug Back No Violations Upon arrival on location I found the rig crew had perforated the 4 1/2 casing at 1450 to 1460 feet with 10 shots. Established circulation and set a 200 foot plug from 1470 feet to 1270 feet. Shot off the 4 1/2 inch casing at 1348 feet. Set a 100 foot rip plug. Pulled the 4 1/2 inch casing up to 252 feet and cemented to surface.
1448625103 2015-11-25 Plug / Plug Back No Violations Timco Wire Line Services perforated 10 shots (1 spf) from 1460 - 1450. The rig ran 1-1/2 tubing to 1480. Formation Cementing was on location to spot a plug over the perforations. The inspector that I was covering for arrived and I departed.
1709603060 2015-11-20 Plug / Plug Back No Violations Due to previous complications (explained in previous report), Timco Energy is on site to conduct a Bond log on the well bore. The Bond log indicated that the hole was collapsed at approximately 1460 feet. I contacted Inspector Todd Miller, to gather a plan of what should be done to properly plug this well. Todd insisted that Ditty Well Service try to rip the 4 1/2 inch diameter casing at different depths in hope of gaining the ability to pull the casing out of the hole. Then if casing could not be pulled tubing would be ran in to a depth of 4700 to set the lime plug, after that plug was set Ditty would then rip the casing at approximately 1450 enabling them to set the Berea and surface plug.
2145485994 2018-04-24 Final Restoration No Violations On the day of inspection, I found that the final restoration inspection has been completed. The site passed final restoration according to ORC 1509.072 (B).
751885591 2015-11-19 0:00 PB No Violations 9.00
PL2430 PL No Violations

For data sources see[9]

References