If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-23760 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.41,"lon":-81.34,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Mill Township | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: DEMIS-WHEELER UNIT | |
License Status: Producing | |
License Date: 1982-07-30 | |
Spud Date: 1982-09-01 | |
Spud Drilling Contractor: ARMSTRONG DRLG | |
Final Drill Date: 1982-09-06 | |
Well Total Depth: 5380.00 ft | |
Configuration: Vertical | |
Latitude: 40.410000 | |
Longitude: -81.340000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1982-07-30 | 28 CGAS EXPLORATION,INC GeoDate 7/30/82 |
Oil and Gas | 1982-07-30 | Issued Date 7/30/82 Expired Date 1/15/83 Acres 0043032 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05380 Proposed Drill Depth 05380 |
Original Spud | 1982-09-01 | |
Completed | 1982-09-06 | |
Reached Total Depth | 1982-09-06 | |
Completion Report Received | 1982-09-20 | |
Construction Permit Expires | 1983-01-15 | |
Change of Owner | 1999-03-15 | Operator changed from 28, CGAS EXPLORATION to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5158 | 5294 | 0 |
5158 | 5294 | 0 | |
2006-09-11 | 5190 | 5249 | 7 |
5190 | 5249 | 7 | |
5158 | 5294 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1450 Bbl | 55000 | FRAC: 1450 BBL FLUID, 55M |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | YEI INC | 1636.00 | 89.00 | 0 |
1985 | YEI INC | 2747.00 | 98.00 | 336 |
1986 | YEI INC | 3049.00 | 0.00 | 365 |
1987 | YEI INC | 2963.00 | 0.00 | 365 |
1988 | YEI INC | 2715.00 | 0.00 | 365 |
1989 | CGAS EXPLORATION | 2716.00 | 72.00 | 365 |
1990 | CGAS EXPLORATION | 2285.00 | 0.00 | 365 |
1991 | CGAS EXPLORATION | 1763.00 | 0.00 | 365 |
1992 | CGAS EXPLORATION | 2126.00 | 53.00 | 366 |
1993 | CGAS EXPLORATION | 1642.00 | 0.00 | 366 |
1994 | CGAS EXPLORATION | 2296.00 | 0.00 | 365 |
1995 | CGAS EXPLORATION | 2613.00 | 0.00 | 365 |
1996 | CGAS EXPLORATION | 1899.00 | 0.00 | 365 |
1997 | CGAS EXPLORATION | 1208.00 | 0.00 | 365 |
1998 | CGAS EXPLORATION | 1290.00 | 0.00 | 365 |
1999 | CGAS EXPLORATION | 537.00 | 0.00 | 365 |
2000 | SOUND ENERGY CO INC | 2548.00 | 0.00 | 365 |
2001 | SOUND ENERGY CO INC | 3293.00 | 0.00 | 365 |
2002 | SOUND ENERGY CO INC | 2455.00 | 0.00 | 365 |
2003 | SOUND ENERGY CO INC | 3027.00 | 0.00 | 365 |
2004 | SOUND ENERGY CO INC | 2667.00 | 52.00 | 365 |
2005 | SOUND ENERGY CO INC | 2567.00 | 0.00 | 365 |
2006 | SOUND ENERGY CO INC | 2476.00 | 0.00 | 365 |
2007 | SOUND ENERGY CO INC | 2519.00 | 0.00 | 365 |
2008 | SOUND ENERGY CO INC | 2216.00 | 0.00 | 365 |
2009 | SOUND ENERGY CO INC | 2350.00 | 0.00 | 365 |
2010 | SOUND ENERGY CO INC | 1939.00 | 0.00 | 365 |
2011 | SOUND ENERGY CO INC | 1375.00 | 0.00 | 365 |
2012 | SOUND ENERGY CO INC | 1382.00 | 0.00 | 366 |
2013 | SOUND ENERGY CO INC | 998.00 | 0.00 | 365 |
2014 | SOUND ENERGY CO INC | 901.00 | 0.00 | 365 |
2015 | SOUND ENERGY CO INC | 1040.00 | 63.00 | 365 |
2016 | SOUND ENERGY CO INC | 1170.00 | 0.00 | 365 |
2017 | SOUND ENERGY CO INC | 866.00 | 0.00 | 365 |
2018 | SOUND ENERGY CO INC | 862.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | YEI INC | Brine | 0 | 0 |
1985 | YEI INC | Brine | 0 | 336 |
1986 | YEI INC | Brine | 60 | 365 |
1987 | YEI INC | Brine | 30 | 365 |
1988 | YEI INC | Brine | 0 | 365 |
1989 | CGAS EXPLORATION | Brine | 0 | 365 |
1990 | CGAS EXPLORATION | Brine | 0 | 365 |
1991 | CGAS EXPLORATION | Brine | 30 | 365 |
1992 | CGAS EXPLORATION | Brine | 0 | 366 |
1993 | CGAS EXPLORATION | Brine | 0 | 366 |
1994 | CGAS EXPLORATION | Brine | 30 | 365 |
1995 | CGAS EXPLORATION | Brine | 0 | 365 |
1996 | CGAS EXPLORATION | Brine | 0 | 365 |
1997 | CGAS EXPLORATION | Brine | 0 | 365 |
1998 | SOUND ENERGY CO INC | Brine | 0 | 365 |
1999 | CGAS EXPLORATION | Brine | 0 | 365 |
2000 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2001 | SOUND ENERGY CO INC | Brine | 80 | 365 |
2002 | SOUND ENERGY CO INC | Brine | 76 | 365 |
2003 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2004 | SOUND ENERGY CO INC | Brine | 73 | 365 |
2005 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2006 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2007 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2008 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2009 | SOUND ENERGY CO INC | Brine | 80 | 365 |
2010 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2011 | SOUND ENERGY CO INC | Brine | 50 | 365 |
2012 | SOUND ENERGY CO INC | Brine | 40 | 366 |
2013 | SOUND ENERGY CO INC | Brine | 45 | 365 |
2014 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2015 | SOUND ENERGY CO INC | Brine | 47 | 365 |
2016 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2017 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2018 | SOUND ENERGY CO INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1180230957 | 2004-7-20 0:00: | PW | No Violations | |
-65946949 | 2004-1-5 0:00:0 | PW | No Violations | |
0000PL3074 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0065946949 | 2004-01-05 | Production Wells | No Violations | no violations |
1180230957 | 2004-07-20 | Production Wells | No Violations | no violation |
1557154447 | 2019-05-06 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing and on the casing were open. Domestic gas was being supplied off the casing. Production equipment included a steel 210 barrel tank, a concrete vault, a horizonal separator, and a chart recorder with a 2 by 1 inch orifice plate within an earthen dike. The production report was up to date and proper identification was present. |
PL3074 | PL | No Violations |
For data sources see[9]