X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-157-23669

Well Details

Well ID: 34-157-23669
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Warwick Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: ZIMMERMAN-ALCO
License Status: Producing
License Date: 1981-12-03
Spud Date: 1982-04-20
Spud Drilling Contractor:
Final Drill Date: 1982-04-25
Well Total Depth: 5088.00 ft
Configuration: Vertical
Latitude: 40.370000
Longitude: -81.410000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1981-12-03 84 EVERFLOW EASTERN PTNS L P GeoDate 12/3/81
Original Spud 1982-04-20
Completed 1982-04-25
Reached Total Depth 1982-04-25
Record Last Modified 2019-06-04

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4911 4986 13
4911 4986 13
4911 4986 13

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 88000 Gal 60000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 EVERFLOW EASTERN PARTNERS LP 3987.00 156.00 0
1985 EVERFLOW EASTERN PARTNERS LP 3310.00 168.00 365
1986 EVERFLOW EASTERN PARTNERS LP 2376.00 0.00 365
1987 EVERFLOW EASTERN PARTNERS LP 2080.00 83.00 365
1988 EVERFLOW EASTERN PARTNERS LP 1259.00 86.00 365
1989 EVERFLOW EASTERN PARTNERS LP 1359.00 88.00 365
1990 EVERFLOW EASTERN PARTNERS LP 1255.00 170.00 365
1991 EVERFLOW EASTERN PARTNERS LP 973.00 0.00 365
1992 EVERFLOW EASTERN PARTNERS LP 0.00 96.00 365
1993 EVERFLOW EASTERN PARTNERS LP 858.00 89.00 365
1994 EVERFLOW EASTERN PARTNERS LP 814.00 0.00 365
1995 EVERFLOW EASTERN PARTNERS LP 846.00 92.00 365
1996 EVERFLOW EASTERN PARTNERS LP 696.00 0.00 365
1997 EVERFLOW EASTERN PARTNERS LP 698.00 88.00 365
1998 EVERFLOW EASTERN PARTNERS LP 619.00 0.00 365
1999 EVERFLOW EASTERN PARTNERS LP 687.00 0.00 365
2000 EVERFLOW EASTERN PARTNERS LP 939.00 126.00 365
2001 EVERFLOW EASTERN PARTNERS LP 672.00 0.00 365
2002 EVERFLOW EASTERN PARTNERS LP 751.00 0.00 365
2003 EVERFLOW EASTERN PARTNERS LP 604.00 0.00 365
2004 EVERFLOW EASTERN PARTNERS LP 761.00 124.00 365
2005 EVERFLOW EASTERN PARTNERS LP 663.00 0.00 365
2006 EVERFLOW EASTERN PARTNERS LP 427.00 0.00 365
2007 EVERFLOW EASTERN PARTNERS LP 418.00 0.00 365
2008 EVERFLOW EASTERN PARTNERS LP 472.00 0.00 365
2009 EVERFLOW EASTERN PARTNERS LP 540.00 0.00 365
2010 EVERFLOW EASTERN PARTNERS LP 631.00 0.00 365
2011 EVERFLOW EASTERN PARTNERS LP 582.00 81.00 365
2012 EVERFLOW EASTERN PARTNERS LP 717.00 0.00 306
2013 EVERFLOW EASTERN PARTNERS LP 244.00 0.00 155
2014 EVERFLOW EASTERN PARTNERS LP 459.00 57.00 200
2015 EVERFLOW EASTERN PARTNERS LP 1106.00 0.00 365
2016 EVERFLOW EASTERN PARTNERS LP 1648.00 65.00 365
2017 EVERFLOW EASTERN PARTNERS LP 1619.00 50.00 365
2018 EVERFLOW EASTERN PARTNERS LP 1253.00 35.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 EVERFLOW EASTERN PARTNERS LP Brine 0 0
1985 EVERFLOW EASTERN PARTNERS LP Brine 120 365
1986 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1987 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1988 EVERFLOW EASTERN PARTNERS LP Brine 70 365
1989 EVERFLOW EASTERN PARTNERS LP Brine 80 365
1990 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1991 EVERFLOW EASTERN PARTNERS LP Brine 80 365
1992 EVERFLOW EASTERN PARTNERS LP Brine 671 365
1993 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1994 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 80 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 80 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 15 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 4 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 0 306
2013 EVERFLOW EASTERN PARTNERS LP Brine 25 155
2014 EVERFLOW EASTERN PARTNERS LP Brine 2 200
2015 EVERFLOW EASTERN PARTNERS LP Brine 13 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 21 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 19 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 36 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0618245061 2018-08-20 Production Wells No Violations Upon arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves were open on the tubing and on the casing. Production equipment included a steel 210 barrel tank, two horizonal separator, and chart recorder with a 2 by 1.250 inch orifice plate within an earthen dike. Domestic gas was being supplied off the separator. The production report was up to date and proper identification was present.
1457416200 2015-02-05 Production Wells No Violations On the date of inspection I found the production equipment consists of a 100bbl steel tank, two horizontal separators, and a flange within a partial earthen dike. The well is equipped with a gas plunger lift system, 1.5 inch tubing, 4.5 inch casing, and 8.625 inch casing.
1460396581 2016-04-11 Production Wells No Violations On the day of my inspection I found a 4 x 1 1/2 wellhead operated by a plunger lift system. The valves are in the open position. The tank battery is made up of one 100 bbl. tank, a horizontal separator, and a recording gauge all in an earthen dike. The tank is properly identified and production reporting is up to date. There are no violations at this time.
618245061 2018-8-20 0:00: PW No Violations 0.30

For data sources see[9]

References