If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-21975 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.45,"lon":-81.52,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: York Township | |
Operator Name: ERIC PETROLEUM CORP | |
Well Pad ID: | |
Farm/Lease Name: WENGER DALE | |
License Status: Producing | |
License Date: 1973-06-20 | |
Spud Date: 1973-09-12 | |
Spud Drilling Contractor: | |
Final Drill Date: 1973-10-23 | |
Well Total Depth: 4977.00 ft | |
Configuration: Vertical | |
Latitude: 40.450000 | |
Longitude: -81.520000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1973-06-20 | 773 FORTUNE GAS & OIL GeoDate 6/20/73 |
Original Spud | 1973-09-12 | |
Completed | 1973-10-23 | |
Reached Total Depth | 1973-10-23 | |
CO | 1996-01-30 | 5054 ERIC PETROLEUM CORP GeoDate 6/20/73 |
Record Last Modified | 2019-06-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4558 | 4640 | 0 |
4558 | 4640 | 0 | |
4558 | 4640 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 74000 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | FORTUNE GAS & OIL | 2494.00 | 205.00 | 0 |
1985 | FORTUNE GAS & OIL | 5732.00 | 205.00 | 365 |
1986 | FORTUNE GAS & OIL | 4284.00 | 131.00 | 365 |
1987 | FORTUNE GAS & OIL | 4367.00 | 129.00 | 365 |
1988 | FORTUNE GAS & OIL | 3040.00 | 0.00 | 365 |
1989 | FORTUNE GAS & OIL | 1647.00 | 0.00 | 365 |
1990 | FORTUNE GAS & OIL | 1044.00 | 0.00 | 365 |
1991 | FORTUNE GAS & OIL | 966.00 | 0.00 | 365 |
1992 | FORTUNE GAS & OIL | 1628.00 | 115.00 | 365 |
1993 | FORTUNE GAS & OIL | 1303.00 | 0.00 | 365 |
1994 | FORTUNE GAS & OIL | 1103.00 | 0.00 | 365 |
1995 | FORTUNE GAS & OIL | 950.00 | 0.00 | 365 |
1996 | ERIC PETROLEUM CORP | 1894.00 | 147.00 | 365 |
1997 | ERIC PETROLEUM CORP | 3155.00 | 33.00 | 365 |
1998 | ERIC PETROLEUM CORP | 2501.00 | 34.00 | 365 |
1999 | ERIC PETROLEUM CORP | 2311.00 | 31.00 | 365 |
2000 | ERIC PETROLEUM CORP | 1495.00 | 27.00 | 365 |
2001 | ERIC PETROLEUM CORP | 1214.00 | 30.00 | 365 |
2002 | ERIC PETROLEUM CORP | 1116.00 | 13.00 | 365 |
2003 | ERIC PETROLEUM CORP | 1107.00 | 36.00 | 365 |
2004 | ERIC PETROLEUM CORP | 991.00 | 52.00 | 365 |
2005 | ERIC PETROLEUM CORP | 779.00 | 0.00 | 365 |
2006 | ERIC PETROLEUM CORP | 694.00 | 0.00 | 365 |
2007 | ERIC PETROLEUM CORP | 580.00 | 36.00 | 365 |
2008 | ERIC PETROLEUM CORP | 752.00 | 0.00 | 365 |
2009 | ERIC PETROLEUM CORP | 729.00 | 45.00 | 365 |
2010 | ERIC PETROLEUM CORP | 517.00 | 0.00 | 365 |
2011 | ERIC PETROLEUM CORP | 632.00 | 0.00 | 365 |
2012 | ERIC PETROLEUM CORP | 479.00 | 0.00 | 366 |
2013 | ERIC PETROLEUM CORP | 315.00 | 51.00 | 365 |
2014 | ERIC PETROLEUM CORP | 327.00 | 0.00 | 365 |
2015 | ERIC PETROLEUM CORP | 199.00 | 0.00 | 365 |
2016 | ERIC PETROLEUM CORP | 112.00 | 44.00 | 365 |
2017 | ERIC PETROLEUM CORP | 118.00 | 0.00 | 365 |
2018 | ERIC PETROLEUM CORP | 273.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | FORTUNE GAS & OIL | Brine | 0 | 0 |
1985 | FORTUNE GAS & OIL | Brine | 0 | 365 |
1986 | FORTUNE GAS & OIL | Brine | 0 | 365 |
1987 | FORTUNE GAS & OIL | Brine | 0 | 365 |
1988 | FORTUNE GAS & OIL | Brine | 0 | 365 |
1989 | FORTUNE GAS & OIL | Brine | 0 | 365 |
1990 | FORTUNE GAS & OIL | Brine | 0 | 365 |
1991 | FORTUNE GAS & OIL | Brine | 0 | 365 |
1992 | FORTUNE GAS & OIL | Brine | 0 | 365 |
1993 | FORTUNE GAS & OIL | Brine | 0 | 365 |
1994 | FORTUNE GAS & OIL | Brine | 0 | 365 |
1995 | FORTUNE GAS & OIL | Brine | 0 | 365 |
1996 | ERIC PETROLEUM CORP | Brine | 22 | 365 |
1997 | ERIC PETROLEUM CORP | Brine | 33 | 365 |
1998 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
1999 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2000 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2001 | ERIC PETROLEUM CORP | Brine | 10 | 365 |
2002 | ERIC PETROLEUM CORP | Brine | 15 | 365 |
2003 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2004 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2005 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2006 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2007 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2008 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2009 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2010 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2011 | ERIC PETROLEUM CORP | Brine | 72 | 365 |
2012 | ERIC PETROLEUM CORP | Brine | 0 | 366 |
2013 | ERIC PETROLEUM CORP | Brine | 13 | 365 |
2014 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2015 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2016 | ERIC PETROLEUM CORP | Brine | 8 | 365 |
2017 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2018 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-960872353 | 2019-4-11 0:00: | PW | No Violations | 0.30 |
0960872353 | 2019-04-11 | Production Wells | No Violations | Upon my arrival on location, I witnessed the well was equipped with 4.5 diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing and on the casing were open. Domestic gas was being supplied off the casing. The production equipment included a steel 100 barrel tank, a horizonal separator, and a chart recorder with a 2 by .750 inch orifice plate within an earthen dike. The production report was up to date and proper identification was present. |
For data sources see[9]