Well Details

Well ID: 34-155-24073
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Mecca Township
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID: US-OH-000828
Farm/Lease Name: ZEROVICH
License Status: Producing
License Date: 2014-08-28
Spud Date: 2013-07-11
Spud Drilling Contractor:
Final Drill Date: 2013-08-05
Well Total Depth: 11500.00 ft
Configuration: Horizontal
Latitude: 41.410000
Longitude: -80.730000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-06-28 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/28/2013, Expired Date:6/28/2015 12:00:00 PM, Drilling unit acres:155.675, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-08-05 Baker Hughes
Correction to Well 2013-11-08 CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2014-01-07 Baker Hughes
APP 2014-08-28 Proposed Formations:POINT PLEASANT, Issued Date:8/28/2014, Expired Date:8/27/2016 12:00:00 PM, Drilling unit acres:155.675, Proposed Well Type:OG, Proposed Well Class:
Change of Owner 2014-10-06 Operator changed from 9008, BP AMERICA PRODUCTION COMPANY to 8966, HALCON OPERATING COMPANY INC
Construction Permit Expires 2016-08-27 Baker Hughes
Change of Owner 2017-09-12 Operator changed from 8966, HALCON OPERATING COMPANY INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2017-09-12 Baker Hughes

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-01-08 6266 10274 928
6266 10274 928
6266 10274 928

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/14/2013 09/19/2013 6140 5,094,720.0 11644

Fluid Composition Data

-65 Scale Inhibitor
Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 OPTIFLO-HTE Halliburton Breaker Walnut hulls Mixture 100 0 1012
Crystalline silica, quartz 14808-60-7 30 0.00061 304
BC-140 X2 Halliburton Crosslinker Ethylene glycol 107-21-1 30 0.00563 2781
Monoethanolamine borate 26038-87-9 100 0.01876 9269
OptiKleen- Halliburton Concentrate Sodium perborate tetrahydrate 10486-00-7 100 0.0039 1925
WG-36 GELLING AGENT Halliburton Gelling Agent Guar gum 9000-30-0 100 0.03706 18308
FR-66 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 30 0.01054 5205
SAND - PREMIUM WHITE Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 2.49447 1,232,400.0
100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 0.69486 343300
Halliburton Scale Inhibitor Ammonium chloride 12125-02-9 10 0.00256 1265
LCA-1 Halliburton Solvent Paraffinic solvent Proprietary 100 0.00219 1084
BE-9 Halliburton Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00403 1993
Fresh Water BP America Carrier/Base Fluid No MSDS Ingredient 7732-18-5 100 85.8997 42,439,000.0
GBW - 30 Halliburton Breaker Hemicellulase enzyme 9012-54-8 30 0.00024 120
40/70 White Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 5.87467 2,902,400.0
LoSurf-300D Halliburton Non-ionic Surfactant Heavy aromatic petroleum naphtha 64742-94-5 30 0.02244 11087
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00374 1848
Ethanol 64-17-5 60 0.04488 22174
Naphthalene 91-20-3 5 0.00374 1848
1,2,4 Trimethylbenzene 95-63-6 1 0.00075 370
SAND - PREMIUM - 20/40, BULK, SK (101272933) Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 4.79564 2,369,300.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-09-17 H2O 8 251834 Gal 392765 Halliburton STAGE 11
60 SHOTS
2013-09-16 H2O 8 318844 Gal 406519 Halliburton STAGE 8

40 SHOTS

2013-09-15 H2O 8 262200 Gal 395959 Halliburton STAGE 5

SHOTS

2013-09-17 H2O 8 251971 Gal 398821 Halliburton STAGE 13

60 SHOTS

2013-09-17 H2O 8 374301 Gal 406243 Halliburton STAGE 12

60 SHOTS

2013-09-12 H2O 8 265824 Gal 400994 Halliburton STAGE 1

84 SHOTS

2013-09-18 H2O 8 239562 Gal 390153 Halliburton STAGE 14

SHOTS

2013-09-14 H2O 8 288304 Gal 396314 Halliburton STAGE 2

40 SHOTS

2013-09-17 H2O 8 245117 Gal 385376 Halliburton STAGE 9

60 SHOTS

2013-09-17 H2O 8 312922 Gal 403774 Halliburton STAGE 10

40 SHOTS

2013-09-16 H2O 8 315193 Gal 406138 Halliburton STAGE 7

SHOTS

2013-07-11 H2O 8 13245 Gal 0 Halliburton INJECTION TEST

24 SHOTS

2013-09-19 H2O 8 346395 Gal 422251 Halliburton STAGE 17

60 SHOTS

2013-09-18 H2O 8 342494 Gal 425063 Halliburton STAGE 15

60 SHOTS

2013-09-18 H2O 8 342952 Gal 419106 Halliburton STAGE 16

40 SHOTS

2013-09-15 H2O 8 342712 Gal 405344 Halliburton STAGE 4

40 SHOTS

2013-09-16 H2O 8 239121 Gal 390703 Halliburton STAGE 6

SHOTS

H2O 8 0 Gal 0 Halliburton STAGE 3

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 BP AMERICA PRODUCTION COMPANY 2884 746 30
2014 HALCON OPERATING COMPANY INC 74144 3801 223
2015 HALCON OPERATING COMPANY INC 47266 685 269
2017 PIN OAK ENERGY PARTNERS LLC 42759 408 193
2018 PIN OAK ENERGY PARTNERS LLC 29712 313 286
2019 PIN OAK ENERGY PARTNERS LLC 16952 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 BP AMERICA PRODUCTION COMPANY Brine 536 30
2014 HALCON OPERATING COMPANY INC Brine 9421 223
2015 HALCON OPERATING COMPANY INC Brine 3028 269
2017 PIN OAK ENERGY PARTNERS LLC Brine 162 193
2018 PIN OAK ENERGY PARTNERS LLC Brine 137 286
2019 PIN OAK ENERGY PARTNERS LLC Brine 210 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1311195361 2017-10-19 0:00 PW No Violations 0.50
-1469001780 2013-7-8 0:00:0 ND No Violations 1.00
-1550846383 2013-8-1 0:00:0 DD No Violations 1.50
-1772191171 2013-7-12 0:00: DD No Violations 2.00
-2083810928 2013-7-25 0:00: DD No Violations 1.00
-392051224 2013-11-26 0:00 PL No Violations 0.70
-844691345 2013-7-20 0:00: DD No Violations
-908203494 2016-8-12 0:00: PW No Violations 0.70
0007808571 2014-06-18 Production Wells No Violations I was on location for a status check inspection. I found during my inspection the well in production. The tank battery consisted of five, 400 barrel tanks and a 500 barrel tank. A lined steel dike surrounded the tanks. The load lines had plugs and locks. The entire well pad was fenced with a locked gate. An identification sign was posted on the fence at the entrance to the pad. The lease road was in excellent condition. Drainage and erosions controls were in place and working properly. Vegetation was established on the berms.
0340387707 2013-07-11 Drill / Deepen / Reopen No Violations My inspection found an Auger Rig on location drilling the hole for the cellar. BP engineers were on location making improvements to the drainage control surrounding the well pad and along the lease road by adding additional rip-rap rock to the ditches. Grass was well established on the topsoil stockpiles surrounding the pad.
0392051224 2013-11-26 Preliminary Restoration No Violations My inspection found all of the production equipment installed. A steel dike with a liner and gravel surrounded the production tanks. The tank battery consisted of five, 410 barrel tanks and a 500 barrel tank. The water and oil load lines were locked. There was a locked gate at the entrance to the well pad. Drainage and erosion controls were in place and working properly. Vegetation was established. The lease road was in good, stable condition. The proper identification was posted.
0844691345 2013-07-20 Drill / Deepen / Reopen No Violations I was on location for the cementing of the 9 5/8 casing. The drill depth was 2527 ft, with a 12.25 inch hole and 9 5/8 inch intermediate casing placed at a depth of 2527 ft. The proper circulation was established and cementing was started by Halliburton. There was 190 BBLs of class A cement with 2% calcium run for the job. The beginning mudscale of cement was a density of 15.6 pounds per gallon (ppg). The amount of returns were determined to be 38 BBLs. The final mudscale of the returns was 15.1 ppg. The plug was landed and 500 psi was held for five minutes, then reduced to 250 psi and held for another five minutes. After releasing pressure we had 3 BBLs of flow back. The well site was in good repair with the proper containment in place. The lease road and well pad were in stable condition. The permit was in the company mans trailer. Fire extinguishers were readily available during the job.
0908203494 2016-08-12 Production Wells No Violations At the time of my inspection, I found the well not in production. The gate valves on the well are closed. The well is equipped with a christmas tree valve assembly. The access road is in good repair. The main gate was secure with a lock. The well pad is surrounded by a wooden post and wire fence with a secure gate in the northeast corner. Identification signs are posted at the access road entrance and tank battery. There is a steel dike around the storage tanks.

The equipment on the pad consists of the following: 6 Storage tanks Five 400 bbl One 500 bbl 1 Gas processing unit (GPU) 1 Vapor recovery unit (VRU) 1 Production well on the pad Site fenced and man doors locked

1209432791 2014-11-04 Production Wells No Violations I was on location to check for the proper identification sign. During my inspection, I found the BP identification sign had been removed and replaced with Halcon Operating.
1311195361 2017-10-19 Production Wells No Violations I found the well in production. The production equipment are in good repair. There is a steel dike around the storage tanks. Identification signs are posted at the tank battery and access road entrance. The well pad is secure with a locked gate. There are no violations at this time.
1373999041 2013-07-13 Drill / Deepen / Reopen No Violations I witnessed Express Energy Service cement the conductor casing for BP. Express Energy Services operator drilled a 26 Hole #1 to 82 and set 20 casing to 80. The casing had a weight of 94 lb./ft. and a grading of H40. Express Energy established circulation with 11 bbls of fresh water. The operator pumped 160 sacks of Class A cement with 2% CaCl and 1/2 lb. Celflake. The cement was displaced with 24.8 bbls of fresh water to 70. I witnessed approximately 6 bbls of good cement returned to surface. The fresh water for mixing had a pH of 7 and 76 degrees.
1374589196 2013-07-22 Drill / Deepen / Reopen No Violations I witnessed Halliburton cemented the surface casing for BP. Nabors M07 drilled a 17.5 Hole #2 to 344 RKB (Kelly) and set 13.375 casing to 329 RKB. Nabors M07s Kelly was 22 above ground level. The surface casing had a grading of J-55, 61 lbs, and an average length of 42. Halliburton establish circulation with 5 bbls of fresh water. The operator pumped 50 bbls of fresh water spacing followed by 170 sacks of Bondcem System cement. Halliburton dropped the plug on the fly and displaced the cement to 286. I witnessed approximately 17 bbls of good cement returned to surface. Halliburton bumped the plug at 500 psi over operating pressure. After 5 minutes, pressure was released to 150 psi and plug held static. Three cement samples were taken during the mixing cycle at the beginning, middle, and end; all three met the density requirements.
1375799006 2013-07-29 Drill / Deepen / Reopen No Violations My inspection found Nabors M07 drilling at a current depth of 3,270. Identification was posted in the company mans trailer; no violations at this time.
1426800238 2013-09-09 Drill / Deepen / Reopen No Violations I received a call from Koreen Burrows, BP Field Environmental Advisor. Koreen stated that all of the grass on the berms surrounding the well pad was killed by a company contracted to kill weeds at all of BPs well locations. Koreen stated the weed killer lasts up to 6 to 8 months. BP plans to reseed the berms by the Spring of 2014. My inspection found all of the grass on the berms dead. The soil in the berms appeared stable. I noticed new stone lined in the drainage ditches. I took photos of the berms.
1456323803 2016-02-24 Production Wells No Violations I was on location for a status check. My inspection found the access road is in good repair. Identification signs are posted at the access road entrance. The pad is fenced and all man doors are unlocked. The #1H is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the storage tanks.

The equipment on the pad consists of the following: 6 Storage tanks Five 400 bbl One 500 bbl 1 Gas processing unit (GPU) 1 Vapor recovery unit (VRU) 1 Production well on the pad Site fenced and man doors unlocked

I called and spoke with Zane Oshurac from Halcon. I instructed Mr. Oshurac to secure all man doors with locks and post an identification sign at the well.

1462949865 2013-08-09 Drill / Deepen / Reopen No Violations My inspection found BP and Nabors M07 rigging down to move to the next drilling location; no violations at this time.
1469001780 2013-07-08 Not Drilled No Violations My inspection found the well pad construction complete. Drainage controls were in place with two sediment ponds located in the northwest and southwest corners. Vegetation was established on the topsoil berms surrounding the pad. Soil stabilization was used on the well pad.
1516131613 2018-01-04 Production Wells No Violations I conducted an inspection on this well with DOGRM inspector, John Fleming. The well valves were open and production records for this well were current. The production equipment was in good repair. There is a steel dike around the storage tanks. Identification signs are posted at the tank battery and access road entrance. The well pad is secure with a locked gate. No violations observed.
1550846383 2013-08-01 Drill / Deepen / Reopen No Violations My inspection found sediment had left the drilling site and deposited in the ditch along the entrance of the lease road. The area of concern was the first 30 to 40. I contacted Koreen Burrows, BP Environmentalist. I instructed her to place rip-rap rock to help prevent further sedimentation and erosion.
1772191171 2013-07-12 Drill / Deepen / Reopen No Violations My inspection found the auger rig drilling a 24 Hole #1. The current depth was 30. Trumbull Construction was adding crushed limestone to the well pad and rip-rap to the drainage ditches; no violations at this time.
2083810928 2013-07-25 Drill / Deepen / Reopen No Violations My inspection found Nabors M07 drilling at a current depth of 1,907. The drilling permit was posted in BPs company trailer; no violations at this time.
340387707 2013-7-11 0:00: DD No Violations 2.00
7808571 2014-6-18 0:00: PW No Violations 0.50

For data sources see[10]