X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-24072

Well Details

Well ID: 34-155-24072
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Warren Township
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID: US-OH-000750
Farm/Lease Name: LUTZ
License Status: Drilling
License Date: 2015-06-10
Spud Date: 2013-07-16
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Horizontal
Latitude: 41.210000
Longitude: -80.890000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-06-10 Proposed Formations:POINT PLEASANT, Issued Date:6/10/2013, Expired Date:6/10/2015 12:00:00 PM, Drilling unit acres:159.99, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-06-14 CORRECTION TO FOOTAGES (TARGET & SURFACE)
APP 2014-06-20 Proposed Formations:POINT PLEASANT, Issued Date:6/20/2014, Expired Date:6/19/2016 12:00:00 PM, Drilling unit acres:159.99, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2015-06-10 Proposed Formations:POINT PLEASANT, Issued Date:6/10/2015, Expired Date:6/9/2017 12:00:00 PM, Drilling unit acres:159.99, Proposed Well Type:OG, Proposed Well Class:EDPW
Construction Permit Expires 2016-06-09
Change of Owner 2017-09-12 Operator changed from 8966, HALCON OPERATING COMPANY INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2017-10-23

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1923689513 2013-7-16 0:00: DD No Violations 1.00
1374678766 2013-07-17 Drill / Deepen / Reopen No Violations I witnessed Halliburton cement the conductor casing for Halcon. Lightning Energy Auger Rig SR30 drilled a 36 Hole #1 to 82 GL (ground level) and set 30 casing to 82 GL. The weight of the casing was 157.5 lbs/ft. Halliburton established circulation with 2 bbls of fresh water. The operator pumped 20 bbls of 6% Gel Spacer followed by 5 bbls of fresh water spacer. Halliburton pumped 370 sacks of Halcem System cement, then displaced the cement to 52 with 46 bbls of fresh water. I witnessed approximately 26 bbls of good cement returned to surface. A cement sample was taken at the middle of the operations; cement met density requirements.
1549592595 2016-02-24 Drill / Deepen / Reopen No Violations I was on location for a status check. My inspection found the access road is in good repair. An identification sign at the access road entrance has fallen over. The pad is fenced and all man doors are locked. The conductor for the #1H well has been drilled.

The equipment on the pad consists of the following: 1 Conductor Site fenced and man doors locked

I called and spoke with Zane Oshurac from Halcon. I instructed Mr. Oshurac to repair the identification sign at the entrance.

1741495506 2018-04-25 Drill / Deepen / Reopen No Violations I was on location with Northeast Regional Supervisor Steve Ochs. I found the well pad secure with fencing around the entire location and a locked gate. An identification sign is posted at the access road entrance. There is no evidence of recent activity. The conductor was set and cemented on July 17, 2013. The RBDMS database shows Pin Oak Energy took ownership of the well on September 12, 2017.
1906048046 2016-08-11 UrbanProduction Wells No Violations


The equipment on the pad consists of the following: 1 Conductor Fenced pad and man doors unsecure.

1923689513 2013-07-16 Drill / Deepen / Reopen No Violations My inspection found Lightning Energy Auger Rig SR30 drilling the conductor hole for Halcon. Their current depth was 43 GL (ground level); no violations at this time.

For data sources see[3]

References