If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23486 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.26,"lon":-80.83,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: JAMESTOWN VILLAGE | |
License Status: Producing | |
License Date: 1992-09-21 | |
Spud Date: 1992-12-12 | |
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
Final Drill Date: 1992-12-23 | |
Well Total Depth: 5288.00 ft | |
Configuration: Directional | |
Latitude: 41.260000 | |
Longitude: -80.830000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1992-09-21 | 2816 P & S ENERGY INC GeoDate 9/21/92 |
Oil and Gas | 1992-09-21 | Issued Date 9/21/92 Expired Date Acres 0054005 Tool Type RTAF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth |
Original Spud | 1992-12-12 | |
Completed | 1992-12-23 | |
Reached Total Depth | 1992-12-23 | |
Completion Report Received | 1993-04-28 | |
Construction Permit Expires | 1993-09-21 | |
Change of Owner | 2019-02-26 | Operator changed from 2816, P & S ENERGY INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-02-26 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4928 | 5046 | 0 |
4928 | 5046 | 0 | |
2006-09-11 | 4942 | 5042 | 121 |
4942 | 5042 | 121 | |
4928 | 5046 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 179 Mscf | 0 | |||
H2O | 0 | 122000 Gal | 100000 | FRAC W/122M GAL H20,100M# SAND AND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1992 | P & S ENERGY INC | 0.00 | 0.00 | 365 |
1993 | P & S ENERGY INC | 41545.00 | 356.00 | 250 |
1994 | P & S ENERGY INC | 46238.00 | 213.00 | 365 |
1995 | P & S ENERGY INC | 37299.00 | 110.00 | 365 |
1996 | P & S ENERGY INC | 33823.00 | 0.00 | 365 |
1997 | P & S ENERGY INC | 26840.00 | 141.00 | 365 |
1998 | P & S ENERGY INC | 24506.00 | 0.00 | 365 |
1999 | P & S ENERGY INC | 21863.00 | 90.00 | 365 |
2000 | P & S ENERGY INC | 18003.00 | 0.00 | 365 |
2001 | P & S ENERGY INC | 15621.00 | 0.00 | 365 |
2002 | P & S ENERGY INC | 15309.00 | 81.00 | 365 |
2003 | P & S ENERGY INC | 15194.00 | 0.00 | 365 |
2004 | P & S ENERGY INC | 12390.00 | 0.00 | 365 |
2005 | P & S ENERGY INC | 11328.00 | 29.00 | 365 |
2006 | P & S ENERGY INC | 10441.00 | 0.00 | 365 |
2007 | P & S ENERGY INC | 10801.00 | 0.00 | 365 |
2008 | P & S ENERGY INC | 10288.00 | 0.00 | 365 |
2009 | P & S ENERGY INC | 9343.00 | 64.00 | 365 |
2010 | P & S ENERGY INC | 9977.00 | 0.00 | 365 |
2011 | P & S ENERGY INC | 9218.00 | 0.00 | 365 |
2012 | P & S ENERGY INC | 9701.00 | 0.00 | 366 |
2013 | P & S ENERGY INC | 7982.00 | 0.00 | 365 |
2014 | P & S ENERGY INC | 8725.00 | 0.00 | 365 |
2015 | P & S ENERGY INC | 7780.00 | 0.00 | 365 |
2016 | P & S ENERGY INC | 6845.00 | 57.00 | 365 |
2017 | P & S ENERGY INC | 7020.00 | 0.00 | 365 |
2018 | P & S ENERGY INC | 6528.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1992 | P & S ENERGY INC | Brine | 580 | 365 |
1993 | P & S ENERGY INC | Brine | 210 | 250 |
1994 | P & S ENERGY INC | Brine | 0 | 365 |
1995 | P & S ENERGY INC | Brine | 0 | 365 |
1996 | P & S ENERGY INC | Brine | 0 | 365 |
1997 | P & S ENERGY INC | Brine | 0 | 365 |
1998 | P & S ENERGY INC | Brine | 0 | 365 |
1999 | P & S ENERGY INC | Brine | 0 | 365 |
2000 | P & S ENERGY INC | Brine | 0 | 365 |
2001 | P & S ENERGY INC | Brine | 0 | 365 |
2002 | P & S ENERGY INC | Brine | 0 | 365 |
2003 | P & S ENERGY INC | Brine | 0 | 365 |
2004 | P & S ENERGY INC | Brine | 0 | 365 |
2005 | P & S ENERGY INC | Brine | 0 | 365 |
2006 | P & S ENERGY INC | Brine | 0 | 365 |
2007 | P & S ENERGY INC | Brine | 0 | 365 |
2008 | P & S ENERGY INC | Brine | 0 | 365 |
2009 | P & S ENERGY INC | Brine | 0 | 365 |
2010 | P & S ENERGY INC | Brine | 0 | 365 |
2011 | P & S ENERGY INC | Brine | 0 | 365 |
2012 | P & S ENERGY INC | Brine | 63 | 366 |
2013 | P & S ENERGY INC | Brine | 0 | 365 |
2014 | P & S ENERGY INC | Brine | 0 | 365 |
2015 | P & S ENERGY INC | Brine | 0 | 365 |
2016 | P & S ENERGY INC | Brine | 0 | 365 |
2017 | P & S ENERGY INC | Brine | 0 | 365 |
2018 | P & S ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-695348583 | 2019-11-12 0:00 | UP | No Violations | |
0322833580 | 2017-01-23 | UrbanProduction Wells | No Violations
-3110 and 2-3592. The equipment on site consists of:
| |
0661881524 | 2015-02-24 | UrbanProduction Wells | No Violations | I was on location for a status check inspection. During my inspection, I found the well in production. The well was equipped with a plunger lift unit. The tank battery consisted of two, 210 barrel production tanks and two, mechanical brine tanks. There was a dike around the tank battery. An identification sign was posted. There was a plug in the load line. The lease road was in stable condition. The well was placed into production prior to House Bill 278. |
0680428771 | 2004-02-25 | Preliminary Restoration | No Violations | Restoration approved . |
0744402198 | 2012-10-24 | UrbanProduction Wells | No Violations | I completed a follow-up NOV inspection. My inspection found the proper identification posted at the well. |
1351080841 | 2012-10-04 | UrbanProduction Wells | No Violations | I conducted an urban production well inspection status check. My inspection found the well equipped with a plunger lift unit surrounded by a chain link fence with no identification and shares a tank battery with permit number 2-3110. The tank battery was surrounded by a chain link fence and contained two, 210 barrel oil/brine storage tanks, two separators, and the proper identification. This P & S Energy Inc., well site shares the tank battery location with Everflow Eastern. I noticed no visible spills or leaks. I called P & S Energy Inc., and asked for an identification sign to be posted as the well. I will conduct a follow-up inspection. |
322833580 | 2017-1-23 0:00: | UP | No Violations | 0.20 |
661881524 | 2015-2-24 0:00: | UP | No Violations | 0.50 |
680428771 | 2004-2-25 0:00: | PL | No Violations | |
744402198 | 2012-10-24 0:00 | UP | No Violations | 0.50 |
For data sources see[9]