X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-21494

Well Details

Well ID: 34-155-21494
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Vienna Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: YOUNGSTOWN AIRPORT
License Status: Producing
License Date: 1980-12-03
Spud Date: 1981-03-21
Spud Drilling Contractor:
Final Drill Date: 1981-03-30
Well Total Depth: 5061.00 ft
Configuration: Vertical
Latitude: 41.260000
Longitude: -80.660000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1980-12-03 79 OXFORD OIL CO GeoDate 12/3/80
Oil and Gas 1980-12-03 Issued Date 12/3/80 Expired Date Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
Original Spud 1981-03-21 R.I. 11-28-80, CH. OWN/OP/WELL # 11-28-80
Completed 1981-03-30 R.I. 11-28-80, CH. OWN/OP/WELL # 11-28-80
Reached Total Depth 1981-03-30 R.I. 11-28-80, CH. OWN/OP/WELL # 11-28-80
Change of Owner 2014-02-06 Operator changed from 79, OXFORD OIL to 9216, ECLIPSE RESOURCES-OHIO LLC
Change of Owner 2016-07-25 Operator changed from 9216, ECLIPSE RESOURCES-OHIO LLC to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2016-07-25 R.I. 11-28-80, CH. OWN/OP/WELL # 11-28-80

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4860 4920 12
4860 4920 12
4860 4920 12

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 300 Bbl 40000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1990 OXFORD OIL 1218.00 72.00 286
1991 OXFORD OIL 1922.00 197.00 365
1992 OXFORD OIL 2232.00 161.00 365
1993 OXFORD OIL 2292.00 152.00 365
1994 OXFORD OIL 1857.00 150.00 365
1995 OXFORD OIL 2118.00 114.00 365
1996 OXFORD OIL 1825.00 118.00 366
1997 OXFORD OIL 2400.00 128.00 365
1998 OXFORD OIL 1339.00 115.00 365
1999 OXFORD OIL 1358.00 100.00 365
2000 OXFORD OIL 1514.00 66.00 0
2001 OXFORD OIL 1294.00 63.00 365
2002 OXFORD OIL 1224.00 126.00 365
2003 OXFORD OIL 854.00 0.00 365
2004 OXFORD OIL 4106.00 66.00 365
2005 OXFORD OIL 946.00 0.00 365
2006 OXFORD OIL 622.00 51.00 365
2007 OXFORD OIL 918.00 0.00 365
2008 OXFORD OIL 799.00 60.00 0
2009 OXFORD OIL 804.00 65.00 0
2010 OXFORD OIL 1017.00 73.00 365
2011 OXFORD OIL 933.00 50.00 0
2012 OXFORD OIL 866.00 0.00 0
2013 ECLIPSE RESOURCES-OHIO LLC 903.00 91.00 365
2014 ECLIPSE RESOURCES-OHIO LLC 368.00 36.00 365
2015 ECLIPSE RESOURCES-OHIO LLC 674.00 20.00 365
2016 M & R INVESTMENTS OHIO LLC 122.00 0.00 365
2017 M & R INVESTMENTS OHIO LLC 28.00 0.00 365
2018 M & R INVESTMENTS OHIO LLC 4.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1990 OXFORD OIL Brine 288 286
1991 OXFORD OIL Brine 269 365
1992 OXFORD OIL Brine 175 365
1993 OXFORD OIL Brine 0 365
1994 OXFORD OIL Brine 162 365
1995 OXFORD OIL Brine 196 365
1996 OXFORD OIL Brine 202 366
1997 OXFORD OIL Brine 0 365
1998 OXFORD OIL Brine 104 365
1999 OXFORD OIL Brine 76 365
2000 OXFORD OIL Brine 237
2001 OXFORD OIL Brine 147 365
2002 OXFORD OIL Brine 114 365
2003 OXFORD OIL Brine 86 365
2004 OXFORD OIL Brine 80 365
2005 OXFORD OIL Brine 120 365
2006 OXFORD OIL Brine 80 365
2007 OXFORD OIL Brine 0 365
2008 OXFORD OIL Brine 128
2009 OXFORD OIL Brine 126
2010 OXFORD OIL Brine 242 365
2011 OXFORD OIL Brine 212
2012 OXFORD OIL Brine 209
2013 ECLIPSE RESOURCES-OHIO LLC Brine 166 365
2014 ECLIPSE RESOURCES-OHIO LLC Brine 231 365
2015 ECLIPSE RESOURCES-OHIO LLC Brine 78 365
2016 ECLIPSE RESOURCES-OHIO LLC Brine 0 365
2017 M & R INVESTMENTS OHIO LLC Brine 0 365
2018 M & R INVESTMENTS OHIO LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1803787143 2014-9-2 0:00:0 PW No Violations 0.50
-1965160937 2006-11-21 0:00 PW No Violations
0228621043 2016-12-07 Production Wells No Violations

-up inspection will be conducted by 7/19/2016.

The equipment on the site consists of the following:



1409855087 2014-09-04 Production Wells No Violations I was on location for a follow-up inspection. I found during my inspection the dike repaired per my request. Eclispse placed a 2 drain with a valve and plug through the dike.
1803787143 2014-09-02 Production Wells No Violations I was on location for a status check. I found during my inspection the well in production with a pumping unit. The tank battery consisted of two 100 barrel production tanks and two separators. I noticed a dike surrounding the production tanks with a trench dug through it. There was a plug on the load lines. Identification signs was properly posted at the tank battery and well. The lease road was in stable condition. I called Eclipse Resources and instructed the field supervisor to repair the dike immediately. A follow-up inspection would be performed by 9/4/14.
1965160937 2006-11-21 Production Wells No Violations no violations .
228621043 2016-12-7 0:00: PW No Violations 0.70
993363657 2020-9-15 0:00: PW No Violations

For data sources see[9]

References