34-155-20481

Well Details

Well ID: 34-155-20481
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Champion Township
Operator Name: STEPHEN J SVETLAK LLC
Well Pad ID:
Farm/Lease Name: NATALE JS & MA
License Status: Producing
License Date: 1981-06-30
Spud Date: 1977-08-31
Spud Drilling Contractor: ARMSTRONG DRLG
Final Drill Date: 1977-09-10
Well Total Depth: 4390.00 ft
Configuration: Vertical
Latitude: 41.330000
Longitude: -80.830000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1977-08-31 R.I. 8-17-77, LOG TYPE=HI
Completed 1977-09-10 R.I. 8-17-77, LOG TYPE=HI
Reached Total Depth 1977-09-10 R.I. 8-17-77, LOG TYPE=HI
CO 1981-06-30 271 TGX CORP GeoDate 6/30/81
CO 1994-03-29 182 BELDEN & BLAKE CO GeoDate 6/30/81
Change of Owner 2002-09-25 Operator changed from 457, ALSID OIL & GAS to 6791, NORMAN D INVESTMENTS
Change of Owner 2005-03-14 Operator changed from 6791, NORMAN D INVESTMENTS to 7773, SVETLAK STEPHEN J LLC
Record Last Modified 2017-02-15 R.I. 8-17-77, LOG TYPE=HI

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4168 4231 14
4168 4231 14
4168 4231 14

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 66000 Gal 34000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 TGX CORP 0.00 0.00 0
1987 TGX CORP 636.00 62.00 67
1988 TGX CORP 889.00 0.00 75
1989 TGX CORP 0.00 0.00 0
1990 TGX CORP 0.00 0.00 0
1991 TGX CORP 0.00 0.00 365
1992 TGX CORP 0.00 0.00 365
1993 ATLAS ENERGY GROUP INC 0.00 0.00 0
1997 ALSID OIL & GAS 0.00 0.00 0
1998 ALSID OIL & GAS 0.00 0.00 365
1999 ALSID OIL & GAS 0.00 0.00 365
2000 VANGUARD OIL & GAS LLC 0.00 0.00 365
2001 VANGUARD OIL & GAS LLC 0.00 0.00 365
2002 CONSORTIUM ENERGY LLC 0.00 0.00 0
2003 CONSORTIUM ENERGY LLC 0.00 0.00 0
2014 STEPHEN J SVETLAK LLC 0.00 0.00 365
2015 STEPHEN J SVETLAK LLC 0.00 0.00 365
2016 STEPHEN J SVETLAK LLC 0.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 TGX CORP Brine 0 0
1987 TGX CORP Brine 35 67
1988 TGX CORP Brine 0 75
1989 TGX CORP Brine 0 0
1990 TGX CORP Brine 0 0
1991 TGX CORP Brine 0 365
1992 TGX CORP Brine 0 365
1993 ATLAS ENERGY GROUP INC Brine 0 0
1997 ALSID OIL & GAS Brine 0 0
1998 ALSID OIL & GAS Brine 0 365
1999 ALSID OIL & GAS Brine 0 365
2000 VANGUARD OIL & GAS LLC Brine 0 365
2001 VANGUARD OIL & GAS LLC Brine 0 365
2002 CONSORTIUM ENERGY LLC Brine 0 0
2003 CONSORTIUM ENERGY LLC Brine 0 0
2014 STEPHEN J SVETLAK LLC Brine 0 365
2015 STEPHEN J SVETLAK LLC Brine 0 365
2016 STEPHEN J SVETLAK LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1005337726 2014-11-26 0:00 UP No Violations 2.00
-1047154238 2014-11-6 0:00: UP No Violations 1.00
-1059347449 2014-10-17 0:00 UP No Violations 7.00
-1425224692 2017-9-27 0:00: UP No Violations 0.80
-337867321 2015-2-25 0:00: UP No Violations 1.00
-475847793 2014-12-2 0:00: PW No Violations 0.50
-693659407 2014-10-28 0:00 UP No Violations 1.00
-744649042 2017-6-16 0:00: PW No Violations 2.00
-860460444 2014-10-22 0:00 UP No Violations 1.50
0337867321 2015-02-25 UrbanProduction Wells No Violations I was on location for a follow-up inspection in reference to compliance notice #1059347449. During my inspection, I found a trailer positioned near the rental house containing impacted material. The trailer was lined with plastic. A snow, covered path had been plowed leading to the tank battery and the remaining impacted material. The 100 barrel production tank was still full of oil and water. The hatch on the 50 barrel brine tank was frozen shut. The well was shut-in with the flow line ball valve in the closed position. All of the small, plastic containers except one had been shut-in. According to Kurt Kollar, Ohio EPA, Mr. Svetlak has until 2/28/2015 to remove the rest of the impacted material. A follow-up inspection will be conducted by 3/2/2015.
0343324011 2015-03-02 UrbanProduction Wells No Violations I was on location for a follow-up inspection in reference to compliance notice no. 1059347449. During my inspection, I found Mr. Svetlak on location removing the remaining impacted material. Mr. Svetlak was using a bobcat to load the material into a lined trailer. Mr. Svetlak stated the material was going to the Carbon Limestone Landfill in Mahoning County. Mr. Svetlak estimated three (3) trailer loads of material were left on site. I reminded Mr. Svetlak to file annual production records for the well. A follow-up inspection will be conducted by 3/16/2015.
0475847793 2014-12-02 Production Wells No Violations I was on location for a follow-up inspection in reference to Compliance Notice No. -1059347449. During my inspection, I found no additional removal of the impacted soil and weeds. The production tank and brine tank were completely full of water. The two containers with impacted soil and weeds were still on location. I called and left a message with Mr. Svetlak to return my call for an update on the oil spill clean-up operations. Follow-up inspections will continue.
0514185335 2017-06-08 UrbanProduction Wells No Violations I conducted a compliance notice follow-up inspection for inspection report 1496943118. At the time of this inspection, Circle M the cleanup contractor for the site was on site with a vac truck to start the process of fluid removal from the impacted well site. Removal of fluid was ongoing throughout the day. I spoke with Mr. Svetlak regarding the continuation of the cleanup efforts until all free fluid was removed from the site. He indicated that the service rig would be on site by either June 9th or June 12th to begin the repair process on the well tubing.
0693659407 2014-10-28 UrbanProduction Wells No Violations I was on location for a follow-up inspection in reference to Compliance Notice No. --up operations. Mr. Svetlak stated clean-up of the site will continue and that the gas leak should be repaired by Thursday, 10/30/2014. Also, he state a sample of the impacted soil was taken to Cardinal Environmental Lab in Youngstown, Ohio to test for Benzene. Once testing is complete, Mr. Svetlak plans to dispose of the impacted soil and weeds at the Carbon Limestone Landfill in Lowellville, Ohio. Mr. Svetlak asked for addition time to cleaning up the location. An extension for the site clean-up was given to 11/14/2014. Follow-up inspection will continue.
0744649042 2017-06-16 Production Wells No Violations I was on location to assess compliance notice #1494865874 and compliance notice #792042042. I found the two (2) storage tanks removed from the site. The separator has been moved into position to be removed. Jon Davis of Circle M is on location grading the well site. All of the oil has been cleaned up. The oil impacted soil and debris has been placed in a pile and will be removed from the location once the disposal containers arrive.
0792042042 2017-06-06 UrbanProduction Wells Violations Noted At the time of this inspection, the well was observed to be equipped with a plunger lift assembly and the had an active gas and oil leak from the tubing and 8 5/8 inch casing. The company was working on the 8 5/8 inch casing to repair the leak when the 1.5 inch tubing split open and started leaking. On site was well owner, Steven Svetlak had applied oil absorbant booms and rags around the well and adjacent area where surface water had been impacted. Mr. Svetlak had plumbed the well directly to the 100 BBL production tank within the tank battery. The tank battery location had a 100 BBL production tank, a 50 BBL steel brine tank and a mechanical separator. The separator was outside of the diked battery. Oil was observed within the dike and outside of the diked tank battery approximately covering a thousand square feet. The 100 BBL production tank had approximately 80 BBLs of fluid in it, so Mr. Svetlak had another 150 BBL tank brought to the site to remove the fluid from the 100 BBL tank. I advised Mr. Svetlak to repair the well and remove all the oil and water from the site along with any impacted vegetation.
0860460444 2014-10-22 UrbanProduction Wells No Violations I was on location for a follow-up inspection in reference to Compliance Notice No. --up operations. Follow-up inspections will continue.
0966837214 2017-08-01 Production Wells No Violations I was on location with Trumbull County Inspector Rick Skidmore to follow-up on Compliance Notice #s 1494865874 and #792042042 related to pollution and contamination issues. This inspection found a wellhead equipped with 1.5 tubing and a 4.5 casing head bowl. The valves on the port lines from the bowl are closed and the tubing flowline has been removed. The top of the tubing is equipped with a gate valve and the valve is closed. It was previously discovered that there was a hole in the 8.625 surface casing, which is not currently visible, and was allowing natural gas and oil from the Berea Sandstone to flow outside of the surface casing and contaminate the area around the wellhead. The area around the wellhead has been covered with absorbent pads and the pads are visibly stained. A one (1) inch line has been plumbed from the surface casing port (not visible) to the flow tee, and a line has been run from the flow tee to a 50 barrel steel tank that is spotted west of the wellhead. There is low pressure, natural gas visibly venting from the stack on the 50 barrel tank. Remedial plans are currently being reviewed to repair the leak. The location has been scraped and areas of visible impact still remain along with numerous bent sticks of two (2) inch screw pipe. The contaminated material has been stockpiled northeast of the wellhead and needs to be removed. This violation continues.
1005337726 2014-11-26 UrbanProduction Wells No Violations I was on location for a follow-up inspection in reference to Compliance Notice No. -1059347449. During my inspection, I found no change from my inspection on Friday, 11/21/2014. I called and spoke with Steve Svetlak. Mr. Svetlak stated 8 loads of impacted soil and weeds mixed with mulch were removed from the site. I instructed Mr. Svetlak that:



-up operations. Mr. Kollar stated that additional impacted material needed to be removed. Also, he stated Mr. Svetlak had not returned any emails or phone calls. A completed clean-up due date was set by Mr. Kollar for December 6, 2014. Additional photos were taken. Follow-up inspections will continue.

1047154238 2014-11-06 UrbanProduction Wells No Violations I was on location for a follow-up inspection in reference to Compliance Notice No. -1059347449. During my inspection, I found the gas leak at the wellhead repaired and no longer bubbling. The rest of the clean-up appeared in the same condition as my inspection on 11/3/2014. Additional photos were taken. Follow-up inspections will continue.
1059347449 2014-10-17 UrbanProduction Wells Violations Noted






Also, Mr. Svetlak contacted the Ohio EPA with the details of the oil spill. Kurt Kollar, Ohio EPA, arrived on location at 1:30pm. Mr. Kollar assessed the oil spill and instructed Mr. Svetlak to:


1414069455 2014-10-18 UrbanProduction Wells No Violations I was on location for a follow-up inspection in reference to Compliance Notice No. -1059347449. During my inspection, I found Mr. Svetlak and Steve Stewart on location cleaning up the oil spill. Mr. Stewart was working a clearing phragmite weeds in and around the tank battery using a Bobcat Track Hoe. Upon further inspection, I found the 100 barrel production tank and 50 barrel brine tank in good condition. Both tanks had bull plugs on the load lines. There was a dike surrounding the tank battery. I noticed a sump pit had been dug near the well and Mr. Svetlak stated the oil and water would be pumped into the 100 barrel production tank. Also, Mr. Svetlak stated he was working on obtaining sawdust and peat moss to bio remediates the soil. Follow-up inspections will continue.
1414154495 2014-10-23 UrbanProduction Wells No Violations I was on location for a follow-up inspection in reference to Compliance Notice No. --37 ppm Chlorides. Mr. Svetlak was shown the Quantab readings. Mr. Svetlak stated saw dust and peat moss will be delivered by October 25, 2014 for bioremediation of the impacted soil and weeds. Additional photos were taken of the site and the Quantabs. Follow-up inspections will continue.
1415018814 2014-10-31 UrbanProduction Wells No Violations was on location for a follow-up inspection in reference to Compliance Notice No. --up inspections will continue.
1418906906 2014-12-08 UrbanProduction Wells No Violations I was on location for a follow-up inspection in reference to Compliance Notice No. -1059347449. During my inspection, I found the well site in the same condition as my previous inspection on Dec. 2, 2014. Additional photos were taken. I called and left a message with Mr. Svetlak requesting a return phone call. Follow-up inspections will continue.
1425224692 2017-09-27 UrbanProduction Wells No Violations I was on location to assess compliance notices #1494865874 and #792042042. I found the well shut-
1494865874 2017-05-15 UrbanProduction Wells Violations Noted I inspected this well location as a follow-up to a previous inspection and associated Chiefs Order #2016-171. At the time of this inspection, I observed the following: a wellhead with plunger-lift production system and associated supply-line appurtenances, and associated storage tank battery. The battery was comprised of a 100-barrel steel, stock tank, and 50-barrel steel brine tank. The areas surrounding the well and battery were comprised of a dense overgrowth of phragmites and other mature, wetlands-type vegetation with large areas of standing water. The existing flow-line valve connections were closed, with the following exception: there was a 1-inch domestic supply connection, with open valve connection displaying 150 psi on an existing gauge. I observed a release of oil surrounding the vicinity of the wellhead, and impacting surrounding surface and floating on the adjacent ponded waters. The oil impacted area was estimated to be 1,000 square feet of surficial oil impact and floating free-phase oil. I walked areas in the apparent down-gradient direction of the wellhead and did not observe visual evidence that oil or oil-impacted surface water had migrated beyond the immediate area of the well and the limits of impact previously described.. I notified ODNR Emergency Response as well as the well owner and advised the well owner regarding the duty to report the release to local state and local authorities. The well owner must begin implementation of remedial measures as soon as possible and complete all remedial and restoration measures by 06/02/17. Contact Inspector Stephen Tompkins with questions regarding this Compliance Notice at 330-907-4647.
1496856509 2017-06-06 UrbanProduction Wells No Violations I conducted a compliance notice follow-up inspection for inspection report 1494865874. At the time of this inspection, the area of impact from released oil surrounding the vicinity of the wellhead and adjacent ponded water within the well location, has not been cleaned up. I contacted the owner Steven Svetlak about cleaning up the area and removing any impacted vegetation and soil for disposal.
1496943118 2017-06-07 UrbanProduction Wells No Violations I conducted a compliance notice follow-up inspection for inspection report 792042042. Oil was observed within the dike and outside of the diked tank battery approximately covering a thousand square feet. No cleanup efforts had been started at the time of this inspection, and the production tanks on site had still not been emptied. I contacted Mr. Svetlak regarding when the cleanup efforts were going to commence and he stated that the company would be starting today.
1497526409 2017-06-14 UrbanProduction Wells No Violations

-up would resume after they removed the rig and mud boat. I spoke with Steve Svetlak by phone with Mr. Morrow. Mr. Svetlak confirmed clean-up on the well site and tank battery resume once Circle M had completed repairs on the well.

1586389604 2017-06-12 Production Wells No Violations
1708835960 2015-02-04 UrbanProduction Wells No Violations I was on location for a follow-up in reference to compliance notice no. 1059347449. During my inspection, I found the fluid level in the 100 barrel production tank approximately two (2) feet from the top. The 50 barrel brine tank hatch was frozen shut. All of the impacted material was still on location and covered with snow. According to Kurt Kollar of the Ohio EPA, Mr. Svetlak was given until 2/28/2015 to completely remove the impacted material from location.
1984277093 2014-11-03 UrbanProduction Wells No Violations I was on location for a follow-up inspection in reference to Compliance Notice No. -1059347449. During my inspection, I found the condition of the oil spill clean-up the same as my inspection on 10/31/2014. The gas leak at the well still had not been repaired. I called Mr. Svetlak. Mr. Svetlak stated the clean-up would continue and that he was waiting on the soil sample results in order to dispose of the material properly. I instructed Mr. Svetlak to repair the gas leak immediately. Additional photos were taken. Follow-up inspections would continue.
2097305110 2014-11-21 UrbanProduction Wells No Violations I was on location for a follow-up inspection in reference to Compliance Notice No. --up inspections will continue.
2135559065 2014-11-06 UrbanProduction Wells No Violations I was on location for a status check. During my inspection, I found the well in production. The well was equipped with a plunger lift unit. A domestic gas line came off of the 4.5 casing. The tank battery consisted of a 100 barrel production tank and a separator. There was a dike around the tank. An identification sign was posted. The lease road was in stable condition with a locked gate. The well was placed into production prior to House Bill 278.
343324011 2015-3-2 0:00:0 UP No Violations 1.00
514185335 2017-6-8 0:00:0 UP No Violations
792042042 2017-6-6 0:00:0 UP No Violations
966837214 2017-8-1 0:00:0 PW No Violations 0.60

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0792042042 US-OH-129017 2017-07-05 Well insufficiently equipped to prevent escape of oil and gas
0792042042 US-OH-129018 2017-07-05 Defective casing, leaking well
1059347449 US-OH-101142 2014-11-17 ID (a-i)
1059347449 US-OH-101143 2014-11-17 OPERATIONMAINTANCE (a-c)
1059347449 US-OH-101144 2014-11-17 Well operation causing pollution and contamination
1059347449 US-OH-101145 2014-11-17 Statement of annual production not filed
1494865874 US-OH-113979 2017-07-12 Well operation causing pollution and contamination

For data sources see[9]

References