X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-23179

Well Details

Well ID: 34-153-23179
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Coventry Township
Operator Name: CARGILL INC
Well Pad ID:
Farm/Lease Name: CITY OF AKRON (SMP #4)
License Status: Well Drilled
License Date: 2018-03-16
Spud Date: 2018-05-17
Spud Drilling Contractor: H A D INC
Final Drill Date: 2018-06-20
Well Total Depth: 4355.00 ft
Configuration: Directional
Latitude: 41.010000
Longitude: -81.550000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-03-16 Proposed Formations:SALINA, Issued Date:3/16/2018, Expired Date:3/16/2019, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
Reached Total Depth 2018-06-20
Record Last Modified 2018-08-15
Construction Permit Expires 2019-03-16

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1045582777 2018-5-16 0:00: ND No Violations 1.30
-1844779553 2018-5-18 0:00: DD No Violations
-1869945964 2018-6-27 0:00: DD No Violations 1.00
-2030953567 2020-3-9 0:00:0 SM No Violations 1.50
-2138755817 2018-5-22 0:00: SM No Violations
-422203246 2019-1-4 0:00:0 SM No Violations 0.20
-78913397 2020-2-24 0:00: SM No Violations 0.30
0422203246 2019-01-04 Solution Mining Project No Violations
0586649358 2018-04-24 Not Drilled No Violations I found Cargill has begun clearing the site for the well pad. Trees have been cut down and stockpiled.
0861550703 2018-05-01 Not Drilled No Violations I found HAD Drilling constructing the well pad for Cargill, Inc. A steel cellar has been installed. I instructed HAD to dig a trench along the entire south side of the well pad and install a filter sock between the well pad and wetland area. There are no violations at this time.
1045582777 2018-05-16 Not Drilled No Violations I found HAD Drilling moving the rig and equipment from City of Akron #80 to this location. There are no violations at this time.
1525873083 2018-05-09 Not Drilled No Violations I found the well pad completed and the steel cellar in place. A filter sock still needs to be put in place between the well pad and wetlands.
1528141147 2018-06-04 Solution Mining Project No Violations H A D Drilling Rig # 247 was standing by waiting for three (3) inch drill pipe. The lateral section was to be drilled with 2.875 tubing, after the rate of penetration slowed the Operator decided additional weight was required to drill the lateral.
1528469772 2018-05-30 Drill / Deepen / Reopen No Violations HADD Rig 249 drilled a 9-7/8 well bore to a total depth of 3060 and ran a total of 78 joints 3051.12 of 7 23lb/ft of K-55 LTC casing with float shoe and a float collar and ten (10) centralizers. Schlumberger pumped 1300 sacks ( 292 bbls ) of class A 1%SOO1 / 3%DO44 / 0.25 lb D130 16.3 lb/gal cement . Droped plug and displaced with 118.5 bbl of salt water. There was 43 bbls of 16.3 cement returned to surface. Plug landed increased pressure to 1700 psi held for 5 minutes with 1 bbl returned to the tub after bleed off. Good circulation through out the job.
1528813069 2018-06-12 Drill / Deepen / Reopen No Violations

-up the watermelon bit.

According to Roy Reppond from Longuist and companyman for Cargill:


1529067528 2018-06-15 Drill / Deepen / Reopen No Violations I found HAD Rig 249 tripping out of the borehole to pick-up a new mud motor to begin building the curve. There are no violations at this time.
1529327687 2018-06-18 Drill / Deepen / Reopen No Violations
1844779553 2018-05-18 Drill / Deepen / Reopen No Violations
1869945964 2018-06-27 Drill / Deepen / Reopen No Violations I found HAD Rig 249 has complete moved off location. The wellhead is currently shut-in.
2138755817 2018-05-22 Solution Mining Project No Violations I was on location to witness the 10.75 casing string pressure test prior to drilling the float shoe out. H A D Drilling Rig # 249 was the drilling contractor for Cargill Inc. The 10.75 was set at approximately 592 K B. H A D drilling pressured the casing up to 577 psi ( 0520 hrs.) to initiate the test. The duration of the test was thirty ( 30 ) minutes. The final recorded pressure was 568 psi. The loss of nine (9) psi represented a 1.5% decline, well within the test parameters. I passed the test and approved drilling ahead.
586649358 2018-4-24 0:00: ND No Violations 0.30
861550703 2018-5-1 0:00:0 ND No Violations 0.50

For data sources see[3]

References