X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-23106

Well Details

Well ID: 34-153-23106
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Richfield Township
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: DiCAPRIO PROPERTIES LLC
License Status: Producing
License Date: 2010-03-24
Spud Date: 2010-06-17
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2010-06-20
Well Total Depth: 3693.00 ft
Configuration: Vertical
Latitude: 41.260000
Longitude: -81.630000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-03-24 Proposed Formations:ORISKANY/NEWBURG/CLINTON, Issued Date:3/24/2010, Expired Date:3/24/2011 6:00:00 AM, Drilling unit acres:24.91, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-06-20
Completion Report Received 2010-09-07
Construction Permit Expires 2011-03-24
Change of Owner 2018-08-21 Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2018-08-21

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-11-08 3514 3551 23
3514 3551 23
3514 3551 23

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 92000 Gal 80000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 GONZOIL INC 28471.00 11629.00 365
2012 GONZOIL INC 34525.00 6761.00 366
2013 GONZOIL INC 22903.00 5066.00 365
2014 GONZOIL INC 17773.00 3778.00 365
2015 GONZOIL INC 15389.00 2802.00 365
2016 GONZOIL INC 12728.00 2082.00 365
2017 GONZOIL INC 10941.00 1425.00 365
2018 GONZOIL INC 7361.00 794.00 180

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 GONZOIL INC Brine 202 365
2012 GONZOIL INC Brine 0 366
2013 GONZOIL INC Brine 0 365
2014 GONZOIL INC Brine 0 365
2015 GONZOIL INC Brine 0 365
2016 GONZOIL INC Brine 0 365
2017 GONZOIL INC Brine 0 365
2018 GONZOIL INC Brine 0 180

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1487737 2010-6-18 0:00: DD No Violations
-1918415400 2010-7-21 0:00: DD No Violations
-1980008990 2010-5-6 0:00:0 DD No Violations
-871352083 2011-7-5 0:00:0 PL No Violations
0001487737 2010-06-18 Drill / Deepen / Reopen No Violations I witnessed the BOP test on Roy Poulsons rig #1. The BOP was tested to 275 psi for 15 minutes. Ten psi was lost in that time period. There were violations at this time.
0637896180 2010-06-24 Drill / Deepen / Reopen No Violations Chemtech and Dailey Excavating are on site to solidify the drilling pits. One load of dust will be applied to each pit. After the dust is mixed, the pits will stand overnight before being covered in the morning.
0829541713 2010-06-17 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 11 3/4 conductor pipe. There were no violations at this time.
0871352083 2011-07-05 Preliminary Restoration No Violations The affected areas have been graded, seeded and are growing. The containment dike, security fence and well identification are in place and the well is in production. Preliminary restoration is approved.
1091770802 2010-09-13 UrbanProduction Wells No Violations The well is in production. The required fencing is installed and the finish grade work was being completed today. The site will be hydoseeded in the near future. Preliminary restoration is on schedule.
1276781712 2010-06-17 Drill / Deepen / Reopen No Violations I performed a rig inspection. The ID sign was posted. The fence was installed around the drilling pits. There were no violations at this time.
1276871344 2010-06-18 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 8 5/8 casing. There were no violations at this time.
1277846857 2010-06-23 Drill / Deepen / Reopen No Violations S&H Water Service was on site removing water from the drilling pits. The pits are scheduled to be solidified tomorrow and closed on the day after.
1413486833 2010-06-18 Drill / Deepen / Reopen No Violations I performed a rig inspection on Roy Poulsons rig #1. The fence was around the drilling pits. The ID sign was posted. There were no violations at this time.
1918415400 2010-07-21 Drill / Deepen / Reopen No Violations Daily Excavating personnel were on site building the tank battery and installing the flowline. No violations at this time.
1980008990 2010-05-06 Drill / Deepen / Reopen No Violations Daily Excavating is on site clearing and grading the location. The rig should arrive within the next month.
2053799234 2010-06-16 Drill / Deepen / Reopen No Violations I witnessed the drilling pits getting dug. No visual signs of ground water. There were no violations at this time.
637896180 2010-6-24 0:00: DD No Violations
829541713 2010-6-17 0:00: DD No Violations

For data sources see[9]

References