X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22970

Well Details

Well ID: 34-153-22970
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR
Well Pad ID:
Farm/Lease Name: WOLFF UNIT
License Status: Producing
License Date: 2006-01-09
Spud Date: 2006-05-18
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2006-05-20
Well Total Depth: 4235.00 ft
Configuration: Vertical
Latitude: 41.030000
Longitude: -81.480000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-01-09 Proposed Formations:BEREA THRU CLINTON, Issued Date:1/9/2006, Expired Date:1/9/2007 6:00:00 AM, Drilling unit acres:41.95, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2006-05-18 RBDMS Rec
Completed 2006-05-20 RBDMS Rec
Reached Total Depth 2006-05-20 RBDMS Rec
Completion Report Received 2006-07-11 RBDMS Rec
Construction Permit Expires 2007-01-09 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-15 3988 4006 56
3988 4006 56
3988 4006 56

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 2352 Bbl 60000 1000 GALLONS IC ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2006 OHIO VALLEY ENERGY SYSTEMS COR 6676.00 583.00 114
2007 OHIO VALLEY ENERGY SYSTEMS COR 44017.00 1733.00 364
2008 OHIO VALLEY ENERGY SYSTEMS COR 43055.00 2017.00 365
2009 OHIO VALLEY ENERGY SYSTEMS COR 57737.00 1350.00 365
2010 OHIO VALLEY ENERGY SYSTEMS COR 43078.00 908.00 365
2011 OHIO VALLEY ENERGY SYSTEMS COR 31052.00 1077.00 365
2012 OHIO VALLEY ENERGY SYSTEMS COR 31852.00 756.00 366
2013 OHIO VALLEY ENERGY SYSTEMS COR 20384.00 553.00 365
2014 OHIO VALLEY ENERGY SYSTEMS COR 17000.00 476.00 365
2015 OHIO VALLEY ENERGY SYSTEMS COR 11587.00 369.00 365
2016 OHIO VALLEY ENERGY SYSTEMS COR 6607.00 34.00 365
2017 OHIO VALLEY ENERGY SYSTEMS COR 6442.00 244.00 365
2018 OHIO VALLEY ENERGY SYSTEMS COR 6318.00 200.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2006 OHIO VALLEY ENERGY SYSTEMS COR Brine 1821 114
2007 OHIO VALLEY ENERGY SYSTEMS COR Brine 173 364
2008 OHIO VALLEY ENERGY SYSTEMS COR Brine 231 365
2009 OHIO VALLEY ENERGY SYSTEMS COR Brine 135 365
2010 OHIO VALLEY ENERGY SYSTEMS COR Brine 67 365
2011 OHIO VALLEY ENERGY SYSTEMS COR Brine 165 365
2012 OHIO VALLEY ENERGY SYSTEMS COR Brine 192 366
2013 OHIO VALLEY ENERGY SYSTEMS COR Brine 105 365
2014 OHIO VALLEY ENERGY SYSTEMS COR Brine 154 365
2015 OHIO VALLEY ENERGY SYSTEMS COR Brine 118 365
2016 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 365
2017 OHIO VALLEY ENERGY SYSTEMS COR Brine 145 365
2018 OHIO VALLEY ENERGY SYSTEMS COR Brine 174 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1135308550 2006-5-17 0:00: DD No Violations
-1648746281 2011-4-11 0:00: PW No Violations
-1650185437 2011-4-21 0:00: UP No Violations
-1760579234 2006-6-9 0:00:0 DD No Violations
-241297421 2006-5-18 0:00: DD No Violations
-474147125 2006-6-7 0:00:0 DD No Violations
0241297421 2006-05-18 Drill / Deepen / Reopen No Violations Wildcat spudded the well after midnight and are drilling surface hole. The pits, south of the rig, are lined and in good condition.
0474147125 2006-06-07 Drill / Deepen / Reopen No Violations The well has been fraced and the pits are scheduled to be solidified on Friday June 9. No violations at this time.
1135308550 2006-05-17 Drill / Deepen / Reopen No Violations Wildcat Drilling is in the process of moving on the location. The well should be spudded later today.
1149037797 2006-05-22 Drill / Deepen / Reopen No Violations Wildcat Drilling has finished drilling and is rigging down and moving off location. The pits have been pumped down, are lined and in good condition.
1279518656 2006-10-24 Production Wells No Violations The tank battery has been built and fenced and the well is in production. Additional grading and seeding is necessary before approving preliminary restoration.
1377356388 2006-12-19 Preliminary Restoration No Violations Preliminary restoration is approved.
1377737711 2006-05-15 Drill / Deepen / Reopen No Violations Work has begun to build the drilling location. The drilling rig is scheduled to arrive on Wednesday May 17.
1379046566 2006-05-19 Drill / Deepen / Reopen No Violations Wildcat is drilling ahead. The pits are in good condition.
1467430920 2006-07-17 Production Wells No Violations The tank battery is being set and the site has been rough graded and seeded to control erosion. No violations at this time.
1648746281 2011-04-11 Production Wells No Violations Status check inspection found minor housekeeping issues around the tank battery. These issues include discarded valve handles, used sorbent pads and oil staining on the side of the stock tank. I contacted Dale Nething with OVE and requested that these issues be corrected.
1650185437 2011-04-21 UrbanProduction Wells No Violations The houskeeping issues around the tank battery have been resolved. No violations at this time.
1760579234 2006-06-09 Drill / Deepen / Reopen No Violations Pits have been solidified and closed.

For data sources see[9]

References