If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22171 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.24,"lon":-81.6,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Richfield Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: TORMA RONALD ETAL | |
License Status: Producing | |
License Date: 1991-12-17 | |
Spud Date: 1992-02-05 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1992-02-12 | |
Well Total Depth: 3685.00 ft | |
Configuration: Vertical | |
Latitude: 41.240000 | |
Longitude: -81.600000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1985-10-15 | 140 KST OIL & GAS CO INC GeoDate 10/15/85 |
Oil and Gas | 1985-10-15 | Issued Date 10/15/85 Expired Date 10/15/86 Acres 0020000 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1990-12-28 | 2026 SUMMIT PETROLEUM INC GeoDate 12/28/90 |
Oil and Gas | 1990-12-28 | Issued Date 12/28/90 Expired Date 12/28/91 Acres 0020000 Tool Type RTF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1991-12-17 | 1388 NORTH COAST ENERGY INC GeoDate 12/17/91 |
Oil and Gas | 1991-12-17 | Issued Date 12/17/91 Expired Date 12/16/92 Acres 0020000 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03685 Proposed Drill Depth 03685 |
Original Spud | 1992-02-04 | RI 12-29-90, RI 12-21-91 PERMIT EXPIRED. |
Completed | 1992-02-12 | RI 12-29-90, RI 12-21-91 PERMIT EXPIRED. |
Reached Total Depth | 1992-02-12 | RI 12-29-90, RI 12-21-91 PERMIT EXPIRED. |
Completion Report Received | 1992-06-18 | RI 12-29-90, RI 12-21-91 PERMIT EXPIRED. |
Construction Permit Expires | 1992-12-16 | RI 12-29-90, RI 12-21-91 PERMIT EXPIRED. |
Change of Owner | 2009-12-14 | Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC |
Change of Owner | 2017-05-01 | Operator changed from 7578, ENERVEST OPERATING LLC, to 8685, M & R INVESTMENTS OHIO LLC |
Record Last Modified | 2017-05-01 | RI 12-29-90, RI 12-21-91 PERMIT EXPIRED. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3464 | 3511 | 0 |
3464 | 3511 | 0 | |
2006-09-11 | 3475 | 3531 | 67 |
3475 | 3531 | 67 | |
3464 | 3511 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 600 Gal | 0 | FRAC W/78M GAL H20 & 750 SX SAND | ||
H2O | 0 | 78000 Gal | 75000 | ISIP 1500, PSI 5 MIN SIP 1180 PSI; |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1629888499 | 2014-3-18 0:00: | PW | No Violations | |
1629888499 | 2014-03-18 | Production Wells | No Violations | I inspected this well and production facilities on 3/18/2014. The well is operated as a Plunger Lift well with the construction being 4.5 casing with 1.5 tubing. All fitting and pipes were leak-free. The required I.D. needs to be posted at the wellhead on the fencing. The tank battery was comprise of a 210 Bbl. Stock tank, a 100 Bbl. Brine tank, a 2408 mechanical separator. The tank battery was fenced , but is in need of repair, as a panel is missing. All equipment was leak-free at the time of my inspection. The tank battery needs the required I.D. post with the proper information.The load line were void of locks and / or plugs. Locks and plugs shall be installed to secure the load lines. The NW corner of the dike has been eroded to the point that a breach of fluids could occur. This part of the dike shall be reconstructed to insure all fluids are contained within the diked area. I spoke with Tim McConaha ( EnerVest ) concerning the corrective measures that need to be performed and would allow 6 weeks to perform the measures before a Compliance Notice would issued. |
For data sources see[9]