X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22135

Well Details

Well ID: 34-153-22135
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Copley Township
Operator Name: ROHRER KARL R JR
Well Pad ID:
Farm/Lease Name: COPLEY-ROHRER
License Status: Producing
License Date: 1985-08-22
Spud Date: 1985-08-23
Spud Drilling Contractor:
Final Drill Date: 1985-08-26
Well Total Depth: 3825.00 ft
Configuration: Vertical
Latitude: 41.110000
Longitude: -81.640000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1985-08-22 169 SMAIL JAMES R GeoDate 8/22/85
Oil and Gas 1985-08-22 Issued Date 8/22/85 Expired Date 8/22/86 Acres 0020000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 03825 Proposed Drill Depth 03825
Original Spud 1985-08-23
Completed 1985-08-26
Reached Total Depth 1985-08-26
Completion Report Received 1986-01-01
Construction Permit Expires 1986-08-22
Change of Owner 2004-08-30 Operator changed from 169, SMAIL JAMES R INC to 7701, ROHRER KARL R JR
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3682 3718 12
3682 3718 12
3682 3718 12

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 55000 Gal 0
CO2 0 20 Tons 50000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ROHRER KARL R JR 2915.00 0.00 365
2015 ROHRER KARL R JR 2744.00 0.00 365
2016 ROHRER KARL R JR 997.00 0.00 365
2017 ROHRER KARL R JR 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ROHRER KARL R JR Brine 0 365
2015 ROHRER KARL R JR Brine 0 365
2016 ROHRER KARL R JR Brine 0 365
2017 ROHRER KARL R JR Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1112147739 2016-3-22 0:00: UP No Violations
-1608643246 2014-12-8 0:00: UP No Violations
-747094967 2010-11-15 0:00 UP No Violations
-860942581 2010-11-15 0:00 UP No Violations
0161761855 2011-01-10 Production Wells No Violations The required identification has been posted but the natural gas sales line connecting the #2 well with the #1 well still has not been replaced. It is my understanding this will occur when weather permits. The annual production violation will be corrected when production is reported for 2010.
0747094967 2010-11-15 UrbanProduction Wells Violations Noted I received a call from Paul with Dominion East Ohio (330-351-1061) and Steve Robinson with the Copley Fairlawn School system (330-664-4810) reporting a natural gas odor in front of the High School. Dominion reported that the leak was not from one of their pipelines. There are two wells on school property that are owned and operated by Karl Rohrer (330-801-0043). The sales line connecting the #2 well (PN2335) with the #1 well (PN 2135) does cross in front of the High School. I spoke with Mr. Rohrer who informed me that Steve Hilliard pumps these wells. I advised Mr. Rohrer and contacted Steve with the order to shut the #2 well in until the pipeline is replaced. I also ordered that the required identification be placed on the respective tank batteries for each well. Annual production has never been filed for this well and must be corrected.
0860942581 2010-11-15 UrbanProduction Wells No Violations FOLLOW UP TO NOV # -747094967 I received a call from Paul with Dominion East Ohio (330-351-1061) and Steve Robinson with the Copley Fairlawn School system (330-664-4810) reporting a natural gas odor in front of the High School. Dominion reported that the leak was not from one of their pipelines. There are two wells on school property that are owned and operated by Karl Rohrer (330-801-0043). The sales line connecting the #2 well (PN2335) with the #1 well (PN 2135) does cross in front of the High School. I spoke with Mr. Rohrer who informed me that Steve Hilliard pumps these wells. I advised Mr. Rohrer and contacted Steve with the order to shut the #2 well in until the pipeline is replaced. I also ordered that the required identification be placed on the respective tank batteries for each well. Annual production has never been filed for this well and must be corrected.
1112147739 2016-03-22 UrbanProduction Wells No Violations The Copley - Rohrer # 1 well was completed in 8/1985. At the time of my inspection the well was operated as a open flow well ( pressure was 60 psi ) utilizing the 4.5 production casing. It had previously been operated as a pumping well. I met , on location , with Karl Rohrer Jr. ( well owner ) to review non- compliance with field issues and the required reporting of the production volumes. I requested that Mr. Rohrer contact the chart integrator he uses to gather the annual production volumes and submit them by 3/31/2016. The well and tank battery are adjacent to the Copley High School soccer and baseball fields. The tank battery consists of one (1) 100 barrel, one (1) in ground concrete brine and one (1) horizontal mechanical separator. The tank battery was fenced and locked. The I.D. signage was illegible and the oil load line lacked a flat plug. I requested that the signage and load line be brought into compliance and a danger No Smoking sign be placed on the tank. The well was secured with with locked fencing. I told Mr. Rohrer that I will re-inspect the well and if the well is compliant with the items I detailed and filed the required production volumes that no further enforcement action would be filed.
1608643246 2014-12-08 UrbanProduction Wells Violations Noted I inspected this well on 12/8/2014 as a follow up to a previously issued Notice of Violation (# 747094967 issued 11/2010 ). The corrective measures prescribed previously have not been completed and some new violations were identified. The production has never been report to RBDMS. The required I D signage is illegible and incomplete. A locked fenced surrounds the tank battery. The tank battery is 80 from the pitchers mound of the ballfield. The tank battery consists of a 100 barrel oil tank, an in ground concrete brine vault and horizontal separator. The heat tube on the 100 barrel oil tank is leaking and causing ground contamination. The tank will have to be replaced or fixed. The wellhead is fenced and locked. The well head is 20 away from the soccer field. The well is comprised of 4.5 casing and is a swab well. In order to bring the Copley - Rohrer #1 into compliance the Operator shall: 1.) Comply with the violations as detailed in Notice of Violation # 747094967 ( statement of annual production not filed ), 2.) install new I D signage ( urban requirement ), 3.) repair or replace the leaking 100 barrel oil tank. The old and new violations shall be completed and approved ( by DOGRM Inspector ) by 1/30/2015
161761855 2011-1-10 0:00: PW No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0747094967 US-OH-128489 2010-11-17 Inadequate pipeline strength
0747094967 US-OH-128490 2010-11-17 General Safety
0747094967 US-OH-128491 2010-11-17 Statement of annual production not filed
1608643246 US-OH-115790 2015-01-14 ID (a-i)
1608643246 US-OH-115791 2015-01-14 TANKS (a-i)
1608643246 US-OH-115792 2015-01-14 Statement of annual production not filed

For data sources see[9]

References