X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-151-25852

Well Details

Well ID: 34-151-25852
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Paris Township
Operator Name: C & T ENERGY OF EAST CANTON IN
Well Pad ID:
Farm/Lease Name: EVANICH
License Status: Producing
License Date: 2014-01-24
Spud Date: 2014-05-30
Spud Drilling Contractor: ADVENT DRLG
Final Drill Date: 2014-06-07
Well Total Depth:
Configuration: Vertical
Latitude: 40.760000
Longitude: -81.130000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-01-24 Proposed Formations:CLINTON, Issued Date:1/24/2014, Expired Date:1/24/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-06-07
Completion Report Received 2014-09-08
Construction Permit Expires 2016-01-24
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-09-09 5203 5277 57
5203 5277 57
5203 5277 57

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 8 131000 Gal 80000 OTHER Nabors Completion Services

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 C & T ENERGY OF EAST CANTON IN 1185.00 936.00 178
2015 C & T ENERGY OF EAST CANTON IN 2427.00 1406.00 365
2016 C & T ENERGY OF EAST CANTON IN 1640.00 957.00 365
2017 C & T ENERGY OF EAST CANTON IN 1257.00 788.00 365
2018 C & T ENERGY OF EAST CANTON IN 1252.00 693.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 C & T ENERGY OF EAST CANTON IN Brine 3277 178
2015 C & T ENERGY OF EAST CANTON IN Brine 595 365
2016 C & T ENERGY OF EAST CANTON IN Brine 385 365
2017 C & T ENERGY OF EAST CANTON IN Brine 210 365
2018 C & T ENERGY OF EAST CANTON IN Brine 280 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-761499524 2014-6-16 0:00: DD No Violations 2.00
0761499524 2014-06-16 Drill / Deepen / Reopen No Violations I was on location to check the status of Advent Drilling moving from this location to the Walker #1. The rig is currently sitting on location waiting for todays rain to move through before rigging down and moving. They expect to have the trucks on location to move the rig tomorrow. There are no violations at this time.
1401673286 2014-06-01 Casing String Witnessed No Violations I was on location to witness the cementing of the 11.75 surface casing. A 14.75 hole was drilled to 633 with a PDC bit and 11.75 32# limited service casing was set to 624. 350sks of Class A 3% CaCl were pumped at 15.6ppg and displaced with 72.5bbls of fresh water. There were full returns during the job and 22bbls of cement were returned to surface. Advent Drilling will wait on cement 8 hours before nippling up and testing their blow out preventer. They will only install 8 5/8 casing through the Berea Sandstone if it makes a lot of water during drilling.
1516300374 2018-01-18 Production Wells No Violations I did a status check inspection for this well. The well is equipped with a pumpjack. The tank battery consists of a steel production tank, a steel brine tank, a vertical separator and a meter. The tank battery is shared with well #151-25844. The well is legibly identified. No compliance issues are noted at this time.

For data sources see[9]

References