X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-151-25289

Well Details

Well ID: 34-151-25289
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Canton Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: ALBORN UNIT
License Status: Producing
License Date: 2002-09-05
Spud Date: 2002-12-04
Spud Drilling Contractor: LANDOGS DRILLING
Final Drill Date: 2002-12-13
Well Total Depth: 5093.00 ft
Configuration: Directional
Latitude: 40.750000
Longitude: -81.390000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2002-09-05 Proposed Formations:CLINTON, Issued Date:9/5/2002, Expired Date:9/5/2003 6:00:00 AM, Drilling unit acres:75.79, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2002-12-04 Lost circulation at 42 feet in a mine shaft. Set 62 feet of 11-3/4 conductor pipe and grouted from the surface. Ran 20 joints (877 feet) of new, 23#, R-3 surface casing set at 892. Mix 500 pounds of gel ahead. Mix and displace 275 sacks (150 light, 125 class A). No circulation. Plug down at 19:50 on 12/6/02. Mix additional 56 sacks to grout from surface. Cement came to surface but fell back. Recommended additional cement on long string to top off.
Completed 2002-12-13 Lost circulation at 42 feet in a mine shaft. Set 62 feet of 11-3/4 conductor pipe and grouted from the surface. Ran 20 joints (877 feet) of new, 23#, R-3 surface casing set at 892. Mix 500 pounds of gel ahead. Mix and displace 275 sacks (150 light, 125 class A). No circulation. Plug down at 19:50 on 12/6/02. Mix additional 56 sacks to grout from surface. Cement came to surface but fell back. Recommended additional cement on long string to top off.
Reached Total Depth 2002-12-13 Lost circulation at 42 feet in a mine shaft. Set 62 feet of 11-3/4 conductor pipe and grouted from the surface. Ran 20 joints (877 feet) of new, 23#, R-3 surface casing set at 892. Mix 500 pounds of gel ahead. Mix and displace 275 sacks (150 light, 125 class A). No circulation. Plug down at 19:50 on 12/6/02. Mix additional 56 sacks to grout from surface. Cement came to surface but fell back. Recommended additional cement on long string to top off.
Completion Report Received 2002-12-27 Lost circulation at 42 feet in a mine shaft. Set 62 feet of 11-3/4 conductor pipe and grouted from the surface. Ran 20 joints (877 feet) of new, 23#, R-3 surface casing set at 892. Mix 500 pounds of gel ahead. Mix and displace 275 sacks (150 light, 125 class A). No circulation. Plug down at 19:50 on 12/6/02. Mix additional 56 sacks to grout from surface. Cement came to surface but fell back. Recommended additional cement on long string to top off.
Correction to Well 2003-01-24 CHANGE IN TARGET INFORMATION: 550'NL & 1276'EL OF SE QTR., SEC. 29; X= 2,306,140 AND Y= 396,385.
Construction Permit Expires 2003-09-05 Lost circulation at 42 feet in a mine shaft. Set 62 feet of 11-3/4 conductor pipe and grouted from the surface. Ran 20 joints (877 feet) of new, 23#, R-3 surface casing set at 892. Mix 500 pounds of gel ahead. Mix and displace 275 sacks (150 light, 125 class A). No circulation. Plug down at 19:50 on 12/6/02. Mix additional 56 sacks to grout from surface. Cement came to surface but fell back. Recommended additional cement on long string to top off.
Record Last Modified 2017-02-15 Lost circulation at 42 feet in a mine shaft. Set 62 feet of 11-3/4 conductor pipe and grouted from the surface. Ran 20 joints (877 feet) of new, 23#, R-3 surface casing set at 892. Mix 500 pounds of gel ahead. Mix and displace 275 sacks (150 light, 125 class A). No circulation. Plug down at 19:50 on 12/6/02. Mix additional 56 sacks to grout from surface. Cement came to surface but fell back. Recommended additional cement on long string to top off.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2003-02-20 4789 4860 0
4789 4860 0
4789 4860 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 7 285 Bbl 80000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2003 EVERFLOW EASTERN PARTNERS LP 4851.00 208.00 213
2004 EVERFLOW EASTERN PARTNERS LP 7616.00 301.00 213
2005 EVERFLOW EASTERN PARTNERS LP 5149.00 222.00 365
2006 EVERFLOW EASTERN PARTNERS LP 4155.00 126.00 365
2007 EVERFLOW EASTERN PARTNERS LP 2585.00 124.00 365
2008 EVERFLOW EASTERN PARTNERS LP 3693.00 120.00 365
2009 EVERFLOW EASTERN PARTNERS LP 2615.00 54.00 365
2010 EVERFLOW EASTERN PARTNERS LP 1357.00 58.00 181
2011 EVERFLOW EASTERN PARTNERS LP 1351.00 0.00 365
2012 EVERFLOW EASTERN PARTNERS LP 693.00 62.00 246
2013 EVERFLOW EASTERN PARTNERS LP 486.00 0.00 185
2014 EVERFLOW EASTERN PARTNERS LP 731.00 39.00 365
2015 EVERFLOW EASTERN PARTNERS LP 889.00 63.00 365
2016 EVERFLOW EASTERN PARTNERS LP 609.00 0.00 365
2017 EVERFLOW EASTERN PARTNERS LP 279.00 30.00 365
2018 EVERFLOW EASTERN PARTNERS LP 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2003 EVERFLOW EASTERN PARTNERS LP Brine 453 213
2004 EVERFLOW EASTERN PARTNERS LP Brine 280 213
2005 EVERFLOW EASTERN PARTNERS LP Brine 194 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 193 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 77 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 182 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 50 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 50 181
2011 EVERFLOW EASTERN PARTNERS LP Brine 66 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 0 246
2013 EVERFLOW EASTERN PARTNERS LP Brine 0 185
2014 EVERFLOW EASTERN PARTNERS LP Brine 75 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 70 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 75 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-122659263 2002-12-5 0:00: DD No Violations 1.00
-1471821596 2003-4-14 0:00: PL No Violations 0.50
0122659263 2002-12-05 Drill / Deepen / Reopen No Violations Set 60 of conductor pipe. Working pit and liner are intact. Building blow pit.
0320395214 2002-12-04 Drill / Deepen / Reopen No Violations Landogs rig moving on the location. Measured the distance from the nearest residence to the well stake; 102 feet. Met with George Strawn (Everflow Eastern) at the site. NO VIOLATIONS.
1039639512 2002-12-11 Drill / Deepen / Reopen No Violations Drilling @ 4360. Discussed water well problem at the residence (yellow house) east of the drilling location with George Strawn (Everflow Eastern). George said that Everflow Eastern was going to connect the house to the municipal water supply and that the water well was going to be plugged.
1041204907 2002-12-17 Completion Testing No Violations Pits are being vaced out. Well will be fraced on 12-19-2002. NO VIOLATIONS.
1043271805 2003-01-22 Production Wells No Violations Well has been completed. Drilling pits have been closed. Location has been rough graded. NO VIOLATIONS.
1178319052 2003-04-22 Production Wells No Violations Inspected well and tank battery as part of a domestic water well complaint at 325 Faircrest Ave. (NE corner of Faircrest and Highview). See WW 03-003. NO VIOLATIONS.
1471821596 2003-04-14 Preliminary Restoration No Violations Rabbit well is in production, Pits are closed and the location is graded.
1827291691 2004-07-27 Preliminary Restoration No Violations Preliminary Restoration PASSED. GPS WH & TB (1-100 bbl oil, 1-50 bbl brine).
320395214 2002-12-4 0:00: DD No Violations 1.50

For data sources see[9]

References