X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-24388

Well Details

Well ID: 34-133-24388
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Franklin Township
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: LAKE ROCKWELL
License Status: Producing
License Date: 2010-04-19
Spud Date: 2010-07-09
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2010-07-15
Well Total Depth: 4750.00 ft
Configuration: Directional
Latitude: 41.180000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-04-19 Proposed Formations:ORISKANY/NEWBURG/CLINTON, Issued Date:4/19/2010, Expired Date:4/19/2011 6:00:00 AM, Drilling unit acres:62.14, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-07-15
Completion Report Received 2010-11-09
Construction Permit Expires 2011-04-19
Change of Owner 2018-08-21 Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2018-08-21

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-12-21 4511 4582 26
4511 4582 26
4511 4582 26

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-08-10 H2O 15 92000 Gal 80000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 GONZOIL INC 16222.00 2406.00 365
2012 GONZOIL INC 11380.00 1044.00 366
2013 GONZOIL INC 6453.00 752.00 365
2014 GONZOIL INC 4299.00 571.00 365
2015 GONZOIL INC 3604.00 513.00 365
2016 GONZOIL INC 3765.00 475.00 365
2017 GONZOIL INC 3777.00 491.00 365
2018 GONZOIL INC 2088.00 228.00 180

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 GONZOIL INC Brine 585 365
2012 GONZOIL INC Brine 168 366
2013 GONZOIL INC Brine 0 365
2014 GONZOIL INC Brine 1 365
2015 GONZOIL INC Brine 5 365
2016 GONZOIL INC Brine 0 365
2017 GONZOIL INC Brine 0 365
2018 PIN OAK ENERGY PARTNERS LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1030398164 2011-4-29 0:00: UL No Violations
-172561773 2010-7-22 0:00: DD No Violations
-318868860 2011-1-27 0:00: UP No Violations
-382936731 2011-6-14 0:00: PL No Violations
-57915191 2018-7-17 0:00: UP No Violations 0.70
0057915191 2018-07-17 UrbanProduction Wells No Violations Status check inspection of this directional, Clinton Sandstone well. My inspection found the wellhead fenced, locked, and screened. The wellhead is equipped with 1.5 tubing and operating with the aid of a plunger lift system. Gauges indicate 310psi on the 4.5 production casing and 250psi on the tubing. This well produces to a diked, fenced, and locked tank battery to the south and is shared with the Lake Rockwell #8 (PN#24345). The battery is screened and contains dedicated equipment for each well. The surface equipment consists of two (2) 140 barrel tanks, two (2) 35 barrel poly tanks, and two (2) horizontal separators. The tanks are equipped with low pressure relief valves and 42 gallon, charcoal filters. The chart at the separator indicates a differential production pressure of 60psi. The required ID is posted at the wellhead and at the tank battery. No violations.
0172561773 2010-07-22 Drill / Deepen / Reopen No Violations Daily Excavating and Chemtech were on site to solidify the drilling pits. One load of dust was placed in each pit. No violations at this time.
0318868860 2011-01-27 UrbanProduction Wells No Violations The well has been completed and placed in production. Preliminary restoration is due this spring. No violations at this time.
0382936731 2011-06-14 Preliminary Restoration No Violations The affected areas have been graded, seeded and are growing. The security fence, containment dike and well identification are in place and the well is in production. Preliminary restoration is approved.
0666790535 2010-07-13 Drill / Deepen / Reopen No Violations Wildcat is drilling ahead with air/soap. The pits are fenced, lined and in good condition.
0883267360 2010-09-01 Urban Drill / Deepen / Reopen No Violations The well has been fraced, the pits have been solidified and the site has been rough graded.
0888108632 2010-07-14 Drill / Deepen / Reopen No Violations Wildcat is drilling ahead. The pits are fenced, lined and in good condition.
1030398164 2011-04-29 UrbanPreliminary Restoration No Violations The affected area around the wellhead has been graded, seeded and is growing. The well shares a tank battery with the Rockwell #8 well (PN 4345). Preliminary restoration is approved.
1122720643 2010-10-05 Urban Drill / Deepen / Reopen No Violations The affected area has been finish graded and will be seeded and mulched. The well should be ready for turn on in the near future.
666790535 2010-7-13 0:00: DD No Violations
883267360 2010-9-1 0:00:0 UD No Violations
888108632 2010-7-14 0:00: DD No Violations

For data sources see[9]

References