X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-24385

Well Details

Well ID: 34-133-24385
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Ravenna Township
Operator Name: BECK ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name: RAVENNA ASSEMBLY
License Status: Producing
License Date: 2009-11-03
Spud Date: 2010-01-18
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2010-01-22
Well Total Depth: 4585.00 ft
Configuration: Vertical
Latitude: 41.160000
Longitude: -81.220000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-11-03 Proposed Formations:CLINTON/MEDINA, Issued Date:11/3/2009, Expired Date:11/3/2010 6:00:00 AM, Drilling unit acres:40.79, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-01-22
Completion Report Received 2010-08-24
Construction Permit Expires 2010-11-03
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-10-27 4316 4390 75
4316 4390 75
4316 4390 75

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 96710 Gal 50000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 BECK ENERGY CORPORATION 5021.00 0.00 274
2011 BECK ENERGY CORPORATION 13886.00 107.00 365
2012 BECK ENERGY CORPORATION 12494.00 0.00 366
2013 BECK ENERGY CORPORATION 10608.00 109.00 365
2014 BECK ENERGY CORPORATION 12037.00 0.00 365
2015 BECK ENERGY CORPORATION 24576.00 191.00 365
2016 BECK ENERGY CORPORATION 16876.00 105.00 365
2017 BECK ENERGY CORPORATION 14572.00 0.00 365
2018 BECK ENERGY CORPORATION 13105.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 BECK ENERGY CORPORATION Brine 575 274
2011 BECK ENERGY CORPORATION Brine 181 365
2012 BECK ENERGY CORPORATION Brine 90 366
2013 BECK ENERGY CORPORATION Brine 0 365
2014 BECK ENERGY CORPORATION Brine 139 365
2015 BECK ENERGY CORPORATION Brine 215 365
2016 BECK ENERGY CORPORATION Brine 75 365
2017 BECK ENERGY CORPORATION Brine 0 365
2018 BECK ENERGY CORPORATION Brine 75 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1174825450 2010-1-29 0:00: DD No Violations
-1239767785 2010-2-18 0:00: DD No Violations
-1372210014 2019-6-25 0:00: UP No Violations 0.50
-1717299843 2010-5-11 0:00: PW No Violations
-1948705733 2010-1-25 0:00: DD No Violations
-936557051 2010-1-20 0:00: DD No Violations
-953207978 2011-6-14 0:00: PL No Violations
0020402478 2013-10-28 UrbanProduction Wells No Violations I inspected this well at the request of Paul Bauer (City of Ravenna) who said he noticed the gate at the tank battery unlocked. My inspection found that the padlock was not secured at the tank battery. The battery was diked and contained 2-100 barrel stock tanks, 2-50 barrel poly tanks, and a horizontal separator. The battery was clean and I found nothing leaking. I secured the padlock on the gate following my inspection. I inspected the wellhead and it was operating with the aid of an electric pumping unit. There was 250psi on the casing and the tubing. The access gate was locked at the wellhead and the fencing was screened with green slats. ID signs were posted at the tank battery and the wellhead but need to be updated to reflect the closest address to the lease road. I contacted Beck Energy about keeping the gates locked and had spoken to them previously about updating their signage which they are working on. No violations.
0340454620 2009-12-14 Drill / Deepen / Reopen No Violations Beck has started delivering the tank battery equipment to the location. There is no indication as to when the rig will arrive.
0936557051 2010-01-20 Drill / Deepen / Reopen No Violations Poulson was drilling ahead. The pits are lined and in good condition. The location is fenced.
0953207978 2011-06-14 Preliminary Restoration No Violations The affected areas have been graded, seeded and are growing. The security fence, containment dike and well identification are in place and the well is in production. Preliminary restoration is approved.
1174825450 2010-01-29 Drill / Deepen / Reopen No Violations The drilling pits are being solidified and closed and the security fence can be removed. The well should be fraced within two weeks.
1239767785 2010-02-18 Drill / Deepen / Reopen No Violations Status check inspection to see if the well had been turned into line. The well has been fraced but has not been turned on.
1264455444 2010-01-21 Drill / Deepen / Reopen No Violations Poulson is drilling ahead and nearing the Newburg porosity zone. I asked the drilling crew to check the location regularly for any signs of natural gas. The drilling pits are lined and in good condition. The location is fenced off. No violations at this time.
1264694219 2010-01-27 Drill / Deepen / Reopen No Violations Poulson Drilling is moving off location. The pits are scheduled to be pumped down today and tomorrow with solidification to follow. I asked Junior to be sure that the location fence was up before leaving the site.
1266343268 2010-02-09 Drill / Deepen / Reopen No Violations Universal Well Service was on site to frac the well. There are no violations at this time.
1269258385 2010-03-16 Drill / Deepen / Reopen No Violations The tank battery has been set and the well has been completed but has not been turned on. No violations at this time.
1373038922 2010-04-29 Production Wells No Violations The well has been turned on. The required fencing is installed but identification is missing. David Beck said that it would be posted today.
1717299843 2010-05-11 Production Wells No Violations The well is in production and the required identification and security fencing is in place. No violations at this time.
1887411920 2010-01-14 Drill / Deepen / Reopen No Violations Hugh Palmer is grading the drilling location. Poulson Drilling is scheduled to move on site on 1/18. The required signage and permit are posted.
1948705733 2010-01-25 Drill / Deepen / Reopen No Violations Poulson Drilling is stacked out on location and is scheduled to move off tomorrow. The pits are full and according to David Beck, Pander Water Service will take several loads out today.
20402478 2013-10-28 0:00 UP No Violations
340454620 2009-12-14 0:00 DD No Violations

For data sources see[9]

References