34-133-24368

Well Details

Well ID: 34-133-24368
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Franklin Township
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: LAKE ROCKWELL
License Status: Producing
License Date: 2008-07-01
Spud Date: 2008-08-18
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2008-08-25
Well Total Depth: 4505.00 ft
Configuration: Directional
Latitude: 41.170000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-07-01 Proposed Formations:CLINTON, Issued Date:7/1/2008, Expired Date:7/1/2009 6:00:00 AM, Drilling unit acres:58.69, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-08-25
Completion Report Received 2009-01-02
Correction to Well 2009-01-09 CORRECTION TO TARGET INFORMATION: NEW X= 2,324,524 AND NEW Y= 554,214.
Construction Permit Expires 2009-07-01
Change of Owner 2018-08-21 Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2018-08-21

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-03-06 4317 4365 30
4317 4365 30
4317 4365 30

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 92010 Gal 80000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 GONZOIL INC 25427.00 2505.00 365
2010 GONZOIL INC 26088.00 1372.00 365
2011 GONZOIL INC 20088.00 1015.00 365
2012 GONZOIL INC 15311.00 781.00 366
2013 GONZOIL INC 10271.00 611.00 365
2014 GONZOIL INC 9495.00 633.00 365
2015 GONZOIL INC 8581.00 570.00 365
2016 GONZOIL INC 7535.00 567.00 365
2017 GONZOIL INC 6429.00 382.00 365
2018 GONZOIL INC 3300.00 312.00 180

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 GONZOIL INC Brine 385 365
2010 GONZOIL INC Brine 146 365
2011 GONZOIL INC Brine 38 365
2012 GONZOIL INC Brine 0 366
2013 GONZOIL INC Brine 119 365
2014 GONZOIL INC Brine 36 365
2015 GONZOIL INC Brine 4 365
2016 GONZOIL INC Brine 35 365
2017 GONZOIL INC Brine 0 365
2018 PIN OAK ENERGY PARTNERS LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-127940981 2008-8-26 0:00: DD No Violations
-1534635553 2008-12-11 0:00 PW No Violations
-1727704091 2008-9-8 0:00:0 DD No Violations
-1875196374 2008-8-18 0:00: DD No Violations
-273086888 2009-7-14 0:00: PL No Violations
-434032425 2008-8-20 0:00: DD No Violations
0127940981 2008-08-26 Drill / Deepen / Reopen No Violations Wildcat is moving off of the location. The drilling pits are lined, fenced and in good condition. The lease road is in good condition and the silt fence is intact.
0273086888 2009-07-14 Preliminary Restoration No Violations Preliminary restoration is approved.
0434032425 2008-08-20 Drill / Deepen / Reopen No Violations Horning Supply was on site earlier today to top off the backside of the 8-5/8 surface casing. Cement did not circulate to surface during the primary cement job. According to Doug Gonzalez, the void required 4 cubic yards of 9 sack grout to fill to the surface. Wildcat is down for maintenance and should be back to drilling later today.
0601714368 2018-07-17 UrbanProduction Wells No Violations Status check inspection of this directional, Clinton Sandstone well. My inspection found the wellhead fenced, locked, and screened. The wellhead is equipped with 1.5 tubing and operating with the aid of a plunger lift system. A gauge indicates 160psi on the tubing. This well produces to a diked, fenced, and locked tank battery to the southeast and is shared with the Lake Rockwell #3 (PN#24323). The battery is screened and contains dedicated equipment for each well. The surface equipment consists of two (2) 140 barrel tanks, two (2) 35 barrel poly tanks, and two (2) horizontal separators. The tanks are equipped with low pressure relief valves and 42 gallon, charcoal filters. The chart at the separator indicates a differential production pressure of 80psi. The required ID is posted at the wellhead and at the tank battery. No violations.
1241153514 2008-10-17 Drill / Deepen / Reopen No Violations The affected area has been graded and seeded. Preliminary restoration will be approved as soon as the vegetation has established.
1534635553 2008-12-11 Production Wells No Violations The well is in production with the required fencing and ID. Preliminary restoration will be due in the spring.
1600353791 2020-9-17 0:00: UP No Violations 0.50
1727704091 2008-09-08 Drill / Deepen / Reopen No Violations The drilling pits have been solidified and covered over. The service rig (Bishop) and perforators (Appalachian) are on site now. The frac job is scheduled for 09/09. No violations at this time.
1875196374 2008-08-18 Drill / Deepen / Reopen No Violations Wildcat Drilling is on site and should spud the well later today. The working pit has been dug and lined. The blow pit will be dug in the morning.
2031397109 2008-08-14 Drill / Deepen / Reopen No Violations The lease road is in and the drilling location is being built. The permit is posted at the entrance. No violations at this time.
601714368 2018-7-17 0:00: UP No Violations 0.50

For data sources see[9]