Well Details

Well ID: 34-133-24345
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Franklin Township
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: LAKE ROCKWELL
License Status: Producing
License Date: 2007-07-17
Spud Date: 2007-09-04
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2007-09-08
Well Total Depth: 4288.00 ft
Configuration: Vertical
Latitude: 41.190000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-07-17 Proposed Formations:CLINTON, Issued Date:7/17/2007, Expired Date:7/16/2008 6:00:00 AM, Drilling unit acres:40.05, Proposed Well Type:OG, Proposed Well Class:POOL
Completed 2007-09-08
Reached Total Depth 2007-09-08
Completion Report Received 2007-12-19
Construction Permit Expires 2008-07-16
Change of Owner 2018-08-21 Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2018-08-21

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-03-07 4091 4147 30
4091 4147 30
4091 4147 30

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 97000 Gal 80000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 GONZOIL INC 13256.00 2003.00 275
2009 GONZOIL INC 12302.00 937.00 365
2010 GONZOIL INC 6274.00 694.00 365
2011 GONZOIL INC 5916.00 363.00 365
2012 GONZOIL INC 8325.00 787.00 366
2013 GONZOIL INC 6464.00 529.00 365
2014 GONZOIL INC 6272.00 599.00 365
2015 GONZOIL INC 6148.00 429.00 365
2016 GONZOIL INC 5990.00 363.00 365
2017 GONZOIL INC 5741.00 363.00 365
2018 GONZOIL INC 2833.00 166.00 180

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 GONZOIL INC Brine 1155 275
2009 GONZOIL INC Brine 630 365
2010 GONZOIL INC Brine 1180 365
2011 GONZOIL INC Brine 439 365
2012 GONZOIL INC Brine 403 366
2013 GONZOIL INC Brine 590 365
2014 GONZOIL INC Brine 456 365
2015 GONZOIL INC Brine 502 365
2016 GONZOIL INC Brine 407 365
2017 GONZOIL INC Brine 450 365
2018 GONZOIL INC Brine 212 180

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1343023100 2007-9-12 0:00: DD No Violations
-1555606253 2009-7-14 0:00: PW No Violations
-1936020087 2008-5-9 0:00:0 DD No Violations
-27163103 2007-9-4 0:00:0 DD No Violations
-704975603 2008-7-29 0:00: PL No Violations
0027163103 2007-09-04 Drill / Deepen / Reopen No Violations Wildcat is moving on the location. The drilling pits are being dug in sand and gravel. No violations at this time.
0704975603 2008-07-29 Preliminary Restoration No Violations Preliminary restoration is approved.
1190209477 2007-09-05 Drill / Deepen / Reopen No Violations Wildcat Drilling encountered 120 of sand and gravel while drilling the surface hole for this well. There were no cement returns on the surface job. After completing the surface job, Gonzoil had Horning Supply deliver 10 cubic yards of 9 sack grout which was used to top off the surface hole. Approximately 9.5 yards successfully filled the void.
1190655173 2007-09-06 Drill / Deepen / Reopen No Violations Wildcat is drilling ahead after setting and grouting the surface casing on 9/05/07. The pits are fenced, lined and in good condition. No violations at this time.
1343023100 2007-09-12 Drill / Deepen / Reopen No Violations Chemtech was on site to solidify the drilling pits. Two loads (44 tons) did not react with the drill pit material as expected and the pits were left open over night to allow additional reaction time. On 9/13, an additional 22 tons of material was placed in the blow pit to complete solidification.
1424723600 2008-01-11 Production Wells No Violations The well is in production and the site has been rough graded. Preliminary restoration is due in the spring. No violations at this time.
1555606253 2009-07-14 Production Wells No Violations Status check inspection found no violations at this time.
1713926376 2018-07-17 UrbanProduction Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead fenced, locked, and screened. The wellhead is equipped with 1.5 tubing and operating with the aid of a plunger lift system. Gauges indicate 410psi on the 4.5 production casing and 400psi on the tubing. This well produces to a diked, fenced, and locked tank battery to the south and is shared with the Lake Rockwell #11D (PN#24388). The battery is screened and contains dedicated equipment for each well. The surface equipment consists of two (2) 140 barrel tanks, two (2) 35 barrel poly tanks, and two (2) horizontal separators. The tanks are equipped with low pressure relief valves and 42 gallon, charcoal filters. The chart at the separator indicates a differential production pressure of 60psi. The required ID is posted at the wellhead and at the tank battery. No violations.
1936020087 2008-05-09 Drill / Deepen / Reopen No Violations The site needs to be finish graded and seeded before preliminary restoration is approved.

For data sources see[9]