X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-24324

Well Details

Well ID: 34-133-24324
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Franklin Township
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: LAKE ROCKWELL
License Status: Producing
License Date: 2006-10-16
Spud Date: 2006-12-01
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2006-12-05
Well Total Depth: 4335.00 ft
Configuration: Vertical
Latitude: 41.180000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-10-16 Proposed Formations:CLINTON, Issued Date:10/16/2006, Expired Date:10/16/2007 6:00:00 AM, Drilling unit acres:42.79, Proposed Well Type:OG, Proposed Well Class:POOL
Completed 2006-12-05
Reached Total Depth 2006-12-05
Completion Report Received 2007-02-16
Construction Permit Expires 2007-10-16
Change of Owner 2018-08-21 Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2018-08-21

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2007-05-30 4127 4221 30
4127 4221 30
4127 4221 30

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 107000 Gal 80000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2007 GONZOIL INC 13489.00 2138.00 365
2008 GONZOIL INC 20928.00 1736.00 365
2009 GONZOIL INC 18739.00 1532.00 365
2010 GONZOIL INC 15561.00 1163.00 365
2011 GONZOIL INC 12722.00 1090.00 365
2012 GONZOIL INC 10705.00 997.00 366
2013 GONZOIL INC 6943.00 793.00 365
2014 GONZOIL INC 6187.00 739.00 365
2015 GONZOIL INC 5250.00 682.00 365
2016 GONZOIL INC 3993.00 612.00 365
2017 GONZOIL INC 4477.00 520.00 365
2018 GONZOIL INC 2463.00 393.00 180

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 GONZOIL INC Brine 364 365
2008 GONZOIL INC Brine 50 365
2009 GONZOIL INC Brine 41 365
2010 GONZOIL INC Brine 157 365
2011 GONZOIL INC Brine 0 365
2012 GONZOIL INC Brine 0 366
2013 GONZOIL INC Brine 6 365
2014 GONZOIL INC Brine 2 365
2015 GONZOIL INC Brine 4 365
2016 GONZOIL INC Brine 0 365
2017 GONZOIL INC Brine 0 365
2018 PIN OAK ENERGY PARTNERS LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1000857310 2007-2-22 0:00: DD No Violations
-1736449780 2007-4-10 0:00: PW No Violations
-231028709 2018-7-17 0:00: UP No Violations 0.50
-534209001 2006-12-14 0:00 DD No Violations
-587554472 2006-12-1 0:00: DD No Violations
0231028709 2018-07-17 UrbanProduction Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead fenced, locked, and screened. The wellhead is equipped with 1.5 tubing and operating with the aid of a plunger lift system. A gauge indicates 100psi on the 4.5 production casing. This well produces to a diked, fenced, and locked tank battery on location and is shared with the Lake Rockwell #5D (PN#24347). The battery is screened and contains dedicated equipment for each well. The surface equipment consists of two (2) 140 barrel tanks, two (2) 35 barrel poly tanks, and two (2) horizontal separators. The tanks are equipped with low pressure relief valves and 42 gallon, charcoal filters. The chart at the separator indicates a differential production pressure of 80psi. The required ID is posted at the wellhead and at the tank battery. No violations.
0534209001 2006-12-14 Drill / Deepen / Reopen No Violations The drilling pits were solidified and closed on 12/13. No violations at this time.
0587554472 2006-12-01 Drill / Deepen / Reopen No Violations Wildcat Drilling is moving on location and should spud later today. The drilling pits are being dug in sand and gravel.
1000857310 2007-02-22 Drill / Deepen / Reopen No Violations Status check inspection found that the fences are up and the ID is posted. The well should be ready to turn on in the near future. No violations at this time.
1011795782 2006-12-06 Drill / Deepen / Reopen No Violations Wildcat is moving off the location. Drilling pits are lined and in good condition. Gonzoil has scheduled a redi-mix truck for 12/7 to pour 8 yards of 9 sack grout around the outside of the surface casing.
1099601400 2007-06-08 Preliminary Restoration No Violations Preliminary reatoration is approved.
1600357261 2020-9-17 0:00: UP No Violations
1736449780 2007-04-10 Production Wells No Violations Site grading is nearly complete. The fence is up and the required identification has been posted. Preliminary restoration will be approved as soon as the site is seeded, growing and stable.

For data sources see[9]

References