If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24290 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.17,"lon":-81.23,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: BECK ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: GME | |
License Status: Producing | |
License Date: 2005-03-28 | |
Spud Date: 2006-01-25 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2006-01-29 | |
Well Total Depth: 4462.00 ft | |
Configuration: Vertical | |
Latitude: 41.170000 | |
Longitude: -81.230000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-03-28 | Proposed Formations:CLINTON, Issued Date:3/28/2005, Expired Date:3/28/2006 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2006-01-25 | RBDMS Rec |
Completed | 2006-01-29 | RBDMS Rec |
Reached Total Depth | 2006-01-29 | RBDMS Rec |
Construction Permit Expires | 2006-03-28 | RBDMS Rec |
Completion Report Received | 2006-09-22 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-12-15 | 4234 | 4267 | 35 |
4234 | 4267 | 35 | |
4234 | 4267 | 35 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 90000 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | BECK ENERGY CORPORATION | 575.00 | 0.00 | 0 |
2007 | BECK ENERGY CORPORATION | 6259.00 | 0.00 | 365 |
2008 | BECK ENERGY CORPORATION | 2309.00 | 0.00 | 365 |
2009 | BECK ENERGY CORPORATION | 2647.00 | 0.00 | 365 |
2010 | BECK ENERGY CORPORATION | 3593.00 | 0.00 | 365 |
2011 | BECK ENERGY CORPORATION | 2862.00 | 0.00 | 365 |
2012 | BECK ENERGY CORPORATION | 2298.00 | 0.00 | 366 |
2013 | BECK ENERGY CORPORATION | 2179.00 | 0.00 | 365 |
2014 | BECK ENERGY CORPORATION | 2841.00 | 0.00 | 365 |
2015 | BECK ENERGY CORPORATION | 19284.00 | 142.00 | 365 |
2016 | BECK ENERGY CORPORATION | 15298.00 | 0.00 | 365 |
2017 | BECK ENERGY CORPORATION | 13097.00 | 0.00 | 365 |
2018 | BECK ENERGY CORPORATION | 12098.00 | 108.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | BECK ENERGY CORPORATION | Brine | 2296 | |
2007 | BECK ENERGY CORPORATION | Brine | 148 | 365 |
2008 | BECK ENERGY CORPORATION | Brine | 140 | 365 |
2009 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2010 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2011 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2012 | BECK ENERGY CORPORATION | Brine | 0 | 366 |
2013 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2014 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2015 | BECK ENERGY CORPORATION | Brine | 210 | 365 |
2016 | BECK ENERGY CORPORATION | Brine | 50 | 365 |
2017 | BECK ENERGY CORPORATION | Brine | 150 | 365 |
2018 | BECK ENERGY CORPORATION | Brine | 70 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1161294232 | 2007-1-4 0:00:0 | PW | No Violations | |
-1239055128 | 2007-5-9 0:00:0 | PL | No Violations | |
-1327044687 | 2018-12-28 0:00 | UP | No Violations | 0.50 |
-169748210 | 2007-4-11 0:00: | PL | No Violations | |
-1828668612 | 2007-2-27 0:00: | PW | No Violations | |
-1915981000 | 2008-11-28 0:00 | PW | No Violations | |
-1954179163 | 2006-12-20 0:00 | PW | No Violations | |
-1981398106 | 2006-1-30 0:00: | DD | No Violations | |
-216843685 | 2006-12-20 0:00 | PL | No Violations | |
-259080560 | 2007-3-21 0:00: | PW | No Violations | |
0105156007 | 2006-02-28 | Drill / Deepen / Reopen | No Violations | Status check inspection. The drilling pits have been solidified and closed. The well has not been fraced and the site has been partially graded. No violations at this time. |
0169748210 | 2007-04-11 | Preliminary Restoration | No Violations | The site still needs finish grade, seeding and mulching in order to correct the oustanding violation. |
0216843685 | 2006-12-20 | Preliminary Restoration | Violations Noted | Preliminary restoration was due by November 1, 2006. The site still needs to be graded, seeded and mulched. |
0247237269 | 2006-02-01 | Drill / Deepen / Reopen | No Violations | The drilling rig has moved off. The pits are fenced off and have sufficient freeboard for rainfall, snowfall or surface runoff. |
0259080560 | 2007-03-21 | Production Wells | No Violations | The required safety equipment has been installed and that violation is corrected. The failure to restore within nine months violation is still open. |
0270969587 | 2006-01-25 | Drill / Deepen / Reopen | No Violations | Wildcat Drilling is moving on site and should spud the well later today. The pits are lined and in good condition. |
0497191211 | 2007-03-19 | Production Wells | No Violations | The safety equipment has not been installed as required. Failure to do so will result in immediate placement on the permit hold list. |
1035480673 | 2006-01-23 | Drill / Deepen / Reopen | No Violations | The lease road has been built. Wildcat Drilling should be moving on site in two days. The drilling permit was issued before the new rules. I still contacted Beck Energy and ordered the required signage and fencing. |
105156007 | 2006-2-28 0:00: | DD | No Violations | |
1161294232 | 2007-01-04 | Production Wells | No Violations | The required fencing has been installed. The company still needs to install the charcoal filter, pressure relief valve and lightning arrestor to the tank battery to be in compliance. |
1223529293 | 2007-04-24 | Production Wells | No Violations | The site has been graded but still needs to be seeded and mulched in order to correct the violation. |
1239055128 | 2007-05-09 | Preliminary Restoration | No Violations | The site has finally been graded, seeded and mulched. Preliminary restoration is approved and the violation is corrected. |
1327044687 | 2018-12-28 | UrbanProduction Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead fenced and locked. The wellhead is equipped with 1.5 tubing and rods and operating with the aid of a natural gas powered pumping unit. This well produces to a diked, fenced, and locked tank battery on location. The battery contains one (1) 210 barrel tank, two (2) 35 barrel poly tanks, and a horizontal separator with an associated meter run. A gauge on the sales line indicates a pressure of 60psi and the chart indicates a differential production pressure of 50psi. The load lines are locked and the tank and vent stack are equipped with the required equipment. The required ID is posted at the tank battery. No violations. |
1363703851 | 2007-01-29 | Production Wells | No Violations | The required safety equipment has been delivered but has not been installed. The violation will be resolved as soon as the equipment is installed. |
1828668612 | 2007-02-27 | Production Wells | No Violations | The safety equipment has been delivered to the site but still needs to be installed. I called and spoke with David Beck and told him that the equipment must be installed immediately. If not installed by March 9, I will request that Beck Energy be placed on permit hold. |
1915981000 | 2008-11-28 | Production Wells | No Violations | The well is shut in at this time. The GME plant is closed which may explain why the well is shut in. I will check again later this winter before calling Beck for an explanation. |
1954179163 | 2006-12-20 | Production Wells | Violations Noted | Status check inspection found that this well is in production but does not have the required fencing, charcoal filter, lightning arrestor and pressure relief valve. The well is to be shut in immediately and remain shut in until all are in compliance. |
1981398106 | 2006-01-30 | Drill / Deepen / Reopen | No Violations | Wildcat Drilling is moving off site. The pits are lined and partially fenced. I told Beck to finish fencing off the pits after the rig moves off. No violations at this time. |
247237269 | 2006-2-1 0:00:0 | DD | No Violations | |
270969587 | 2006-1-25 0:00: | DD | No Violations | |
497191211 | 2007-3-19 0:00: | PW | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0216843685 | US-OH-122145 | 2006-12-21 | Failure to restore land surface within 9 mos. (CHANGE) (REPLACE) | |
1954179163 | US-OH-119711 | 2006-12-21 | General Safety |
For data sources see[9]