X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-23993

Well Details

Well ID: 34-133-23993
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Franklin Township
Operator Name: BECK ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name: SCOTT MOLDER UNIT
License Status: Producing
License Date: 2018-12-27
Spud Date: 1994-09-23
Spud Drilling Contractor: IPSCO
Final Drill Date: 1995-09-27
Well Total Depth: 4270.00 ft
Configuration: Vertical
Latitude: 41.180000
Longitude: -81.340000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1993-11-12 1888 BECK ENERGY CORP GeoDate 11/12/93
Oil and Gas 1993-11-12 Issued Date 11/12/93 Expired Date 11/12/94 Acres 0053000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04270 Proposed Drill Depth 04270
Original Spud 1994-09-23 UPDATED LOCATION PER DOGRM SURVEYOR 1/3/19 ALE.
Completed 1995-09-27 UPDATED LOCATION PER DOGRM SURVEYOR 1/3/19 ALE.
Reached Total Depth 1995-09-27 UPDATED LOCATION PER DOGRM SURVEYOR 1/3/19 ALE.
Completion Report Received 1995-11-20 UPDATED LOCATION PER DOGRM SURVEYOR 1/3/19 ALE.
APP 2018-12-27 Proposed Formations:CLINTON SANDSTONE, Issued Date:12/27/2018, Expired Date:12/26/2020 12:00:00 PM, Drilling unit acres:53, Proposed Well Type:OG, Proposed Well Class:
Record Last Modified 2019-01-03 UPDATED LOCATION PER DOGRM SURVEYOR 1/3/19 ALE.
Construction Permit Expires 2020-12-26 UPDATED LOCATION PER DOGRM SURVEYOR 1/3/19 ALE.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4045 4161 0
4045 4161 0
2006-09-11 4070 4086 42
4070 4086 42
4045 4161 0
2006-09-11 4110 4120 29

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 26000 Gal 60000 2 STAGE FRAC...46,520 GAL WATER &
H2O 0 20520 Gal 40500 2ND STAGE

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1995 BECK ENERGY CORPORATION 866.00 207.00 58
1996 BECK ENERGY CORPORATION 7208.00 404.00 365
1997 BECK ENERGY CORPORATION 6784.00 284.00 365
1998 BECK ENERGY CORPORATION 8051.00 284.00 365
1999 BECK ENERGY CORPORATION 8120.00 193.00 0
2000 BECK ENERGY CORPORATION 8773.00 209.00 0
2001 BECK ENERGY CORPORATION 7022.00 108.00 365
2002 BECK ENERGY CORPORATION 4599.00 88.00 365
2003 BECK ENERGY CORPORATION 3592.00 101.00 365
2004 BECK ENERGY CORPORATION 2164.00 170.00 365
2005 BECK ENERGY CORPORATION 2500.00 87.00 365
2006 BECK ENERGY CORPORATION 2307.00 103.00 365
2007 BECK ENERGY CORPORATION 2304.00 80.00 365
2008 BECK ENERGY CORPORATION 2223.00 0.00 365
2009 BECK ENERGY CORPORATION 2330.00 120.00 365
2010 BECK ENERGY CORPORATION 2313.00 0.00 365
2011 BECK ENERGY CORPORATION 2336.00 0.00 365
2012 BECK ENERGY CORPORATION 2094.00 0.00 366
2013 BECK ENERGY CORPORATION 762.00 0.00 365
2014 BECK ENERGY CORPORATION 634.00 97.00 365
2015 BECK ENERGY CORPORATION 1105.00 0.00 365
2016 BECK ENERGY CORPORATION 1038.00 0.00 365
2017 BECK ENERGY CORPORATION 723.00 0.00 365
2018 BECK ENERGY CORPORATION 698.00 87.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1995 BECK ENERGY CORPORATION Brine 603 58
1996 BECK ENERGY CORPORATION Brine 1162 365
1997 BECK ENERGY CORPORATION Brine 793 365
1998 BECK ENERGY CORPORATION Brine 625 365
1999 BECK ENERGY CORPORATION Brine 498
2000 BECK ENERGY CORPORATION Brine 528
2001 BECK ENERGY CORPORATION Brine 400 365
2002 BECK ENERGY CORPORATION Brine 400 365
2003 BECK ENERGY CORPORATION Brine 310 365
2004 BECK ENERGY CORPORATION Brine 365 365
2005 BECK ENERGY CORPORATION Brine 295 365
2006 BECK ENERGY CORPORATION Brine 422 365
2007 BECK ENERGY CORPORATION Brine 290 365
2008 BECK ENERGY CORPORATION Brine 360 365
2009 BECK ENERGY CORPORATION Brine 253 365
2010 BECK ENERGY CORPORATION Brine 157 365
2011 BECK ENERGY CORPORATION Brine 0 365
2012 BECK ENERGY CORPORATION Brine 0 366
2013 BECK ENERGY CORPORATION Brine 0 365
2014 BECK ENERGY CORPORATION Brine 50 365
2015 BECK ENERGY CORPORATION Brine 150 365
2016 BECK ENERGY CORPORATION Brine 150 365
2017 BECK ENERGY CORPORATION Brine 150 365
2018 BECK ENERGY CORPORATION Brine 75 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1086867313 2019-1-8 0:00:0 UP No Violations 0.50
-650323017 2009-1-7 0:00:0 PW No Violations
0650323017 2009-01-07 Production Wells No Violations Status check inspection found no violations at this time.
1086867313 2019-01-08 UrbanProduction Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead is equipped with 8.625 surface casing, 4.5 production casing, 1.5 tubing, and a plunger lift system. A gauge on the casing indicates a pressure of 430psi at the wellhead. This well produces to a diked tank battery on location and contains one (1) 210 barrel tank, two (2) 35 barrel poly tanks, and a horizontal separator with an associated meter run. The meter run is located at the lease road entrance. The load lines on the tank are equipped with bull plugs, the valves are locked, and the tank hatch lid is sealed. The required ID is posted at the tank battery. This well was drilled prior to the implementation of HB 278 and urban requirements will not be enforced at this time. No violations.
iDIAN00103 1999-02-10 Preliminary Restoration No Violations
iDIAN001035 1999-2-10 0:00: PL No Violations

For data sources see[9]

References