If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-23712 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.23,"lon":-81.09,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Windham Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: VINE E UNIT | |
License Status: Producing | |
License Date: 1988-12-20 | |
Spud Date: 1988-12-24 | |
Spud Drilling Contractor: SHERMAN DRLG | |
Final Drill Date: 1988-12-28 | |
Well Total Depth: 4543.00 ft | |
Configuration: Vertical | |
Latitude: 41.230000 | |
Longitude: -81.090000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1988-12-20 | 182 BELDEN & BLAKE CO GeoDate 12/20/88 |
Oil and Gas | 1988-12-20 | Issued Date 12/20/88 Expired Date 12/20/89 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04543 Proposed Drill Depth 04543 |
Original Spud | 1988-12-24 | |
Completed | 1988-12-28 | |
Reached Total Depth | 1988-12-28 | |
Completion Report Received | 1989-02-21 | |
Construction Permit Expires | 1989-12-20 | |
Change of Owner | 2007-04-27 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 7578, ENERVEST OPERATING LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4353 | 4460 | 40 |
4353 | 4460 | 40 | |
4353 | 4460 | 40 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 76000 Gal | 60000 | FRAC:SAND/WATER |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1990 | BELDEN & BLAKE CORPORATION | 4638.00 | 3150.00 | 200 |
1991 | BELDEN & BLAKE CORPORATION | 7323.00 | 4472.00 | 365 |
1992 | BELDEN & BLAKE CORPORATION | 4921.00 | 3409.00 | 348 |
1993 | BELDEN & BLAKE CORPORATION | 4266.00 | 2712.00 | 349 |
1994 | BELDEN & BLAKE CORPORATION | 2580.00 | 2190.00 | 335 |
1995 | BELDEN & BLAKE CORPORATION | 2725.00 | 2021.00 | 290 |
1996 | BELDEN & BLAKE CORPORATION | 2153.00 | 1936.00 | 352 |
1997 | BELDEN & BLAKE CORPORATION | 2530.00 | 1572.00 | 324 |
1998 | BELDEN & BLAKE CORPORATION | 2417.00 | 1343.00 | 328 |
1999 | BELDEN & BLAKE CORPORATION | 2388.00 | 969.00 | 231 |
2000 | BELDEN & BLAKE CORPORATION | 1900.00 | 991.00 | 324 |
2001 | BELDEN & BLAKE CORPORATION | 1504.00 | 1050.00 | 291 |
2002 | BELDEN & BLAKE CORPORATION | 278.00 | 849.00 | 333 |
2003 | BELDEN & BLAKE CORPORATION | 810.00 | 573.00 | 330 |
2004 | BELDEN & BLAKE CORPORATION | 999.00 | 653.00 | 366 |
2005 | BELDEN & BLAKE CORPORATION | 1196.00 | 751.00 | 363 |
2007 | ENERVEST OPERATING LLC | 1274.00 | 582.00 | 365 |
2008 | ENERVEST OPERATING LLC | 1119.00 | 342.00 | 365 |
2009 | ENERVEST OPERATING LLC | 1324.00 | 865.00 | 365 |
2010 | ENERVEST OPERATING LLC | 946.00 | 462.00 | 365 |
2011 | ENERVEST OPERATING LLC | 908.00 | 664.00 | 0 |
2012 | ENERVEST OPERATING LLC | 1016.00 | 746.00 | 366 |
2013 | ENERVEST OPERATING LLC | 691.00 | 772.00 | 365 |
2014 | ENERVEST OPERATING LLC | 498.00 | 440.00 | 365 |
2015 | ENERVEST OPERATING LLC | 807.00 | 205.00 | 365 |
2016 | ENERVEST OPERATING LLC | 365.00 | 323.00 | 366 |
2017 | ENERVEST OPERATING LLC | 287.00 | 341.00 | 365 |
2018 | ENERVEST OPERATING LLC | 240.00 | 265.00 | 360 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL5796 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
1855372353 | 2017-09-28 | Production Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead equipped and operating with an electric powered pumping unit. A gauge on the tubing flow line indicates a tubing pressure of 100psi and a gauge on the 4.5 production casing flow line shows a pressure of 110psi. The well produces to a diked tank battery to the east and is shared with the E. Vine #3 (PN#2850) and contains one (1) 180 barrel tank, a 100 barrel tank, and two (2) horizontal separators and meter runs. The production chart indicates a differential production pressure of 65psi. ID is posted at the wellhead and tank battery. I found no violations at this time. |
PL5796 | PL | No Violations |
For data sources see[9]