If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-21894 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.24,"lon":-81.13,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Freedom Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: LEE | |
License Status: Final Restoration | |
License Date: 2014-12-19 | |
Spud Date: 1980-01-22 | |
Spud Drilling Contractor: | |
Final Drill Date: 1980-01-11 | |
Well Total Depth: 4565.00 ft | |
Configuration: Vertical | |
Latitude: 41.240000 | |
Longitude: -81.130000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1979-04-27 | 2037 CEDAR VALLEY ENERGY INC GeoDate 4/27/79 |
Completed | 1980-01-11 | |
Reached Total Depth | 1980-01-11 | |
Original Spud | 1980-01-22 | |
APP | 2014-12-19 | Proposed Formations:CLINTON, Issued Date:12/19/2014, Expired Date:12/18/2016 12:00:00 PM, Drilling unit acres:40.37, Proposed Well Type:OG, Proposed Well Class: |
Correction to Well | 2014-12-19 | UNIT SIZE INCREASED, CHANGE IN X,Y COORDINATES AND ADDED FOOTAGE INFORMATION TO WELL RECORD. |
Plugged/Abandoned | 2014-12-30 | |
Construction Permit Expires | 2016-12-18 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4397 | 4443 | 15 |
4397 | 4443 | 15 | |
4397 | 4443 | 15 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 900 Bbl | 70000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | INLAND DRILLING CO INC | 2038.00 | 1262.00 | 365 |
1986 | INLAND DRILLING CO INC | 2147.00 | 1673.00 | 365 |
1987 | INLAND DRILLING CO INC | 1611.00 | 1393.00 | 364 |
1988 | INLAND DRILLING CO INC | 2116.00 | 1202.00 | 365 |
1989 | CEDAR VALLEY ENERGY INC | 736.00 | 1053.00 | 365 |
1990 | CEDAR VALLEY ENERGY INC | 677.00 | 1052.00 | 365 |
1991 | CEDAR VALLEY ENERGY INC | 586.00 | 1097.00 | 365 |
1992 | CEDAR VALLEY ENERGY INC | 531.00 | 959.00 | 365 |
1993 | CEDAR VALLEY ENERGY INC | 922.00 | 872.00 | 365 |
1994 | CEDAR VALLEY ENERGY INC | 925.00 | 775.00 | 365 |
1995 | CEDAR VALLEY ENERGY INC | 751.00 | 702.00 | 365 |
1996 | CEDAR VALLEY ENERGY INC | 540.00 | 468.00 | 365 |
1997 | CEDAR VALLEY ENERGY INC | 669.00 | 440.00 | 365 |
1998 | CEDAR VALLEY ENERGY INC | 498.00 | 550.00 | 365 |
1999 | CEDAR VALLEY ENERGY INC | 431.00 | 469.00 | 365 |
2000 | CEDAR VALLEY ENERGY INC | 396.00 | 519.00 | 365 |
2001 | CEDAR VALLEY ENERGY INC | 628.00 | 513.00 | 365 |
2002 | CEDAR VALLEY ENERGY INC | 651.00 | 500.00 | 365 |
2003 | CEDAR VALLEY ENERGY INC | 627.00 | 437.00 | 365 |
2004 | CEDAR VALLEY ENERGY INC | 295.00 | 360.00 | 365 |
2005 | CEDAR VALLEY ENERGY INC | 359.00 | 367.00 | 365 |
2006 | CEDAR VALLEY ENERGY INC | 252.00 | 287.00 | 365 |
2007 | CEDAR VALLEY ENERGY INC | 374.00 | 419.00 | 365 |
2008 | CEDAR VALLEY ENERGY INC | 456.00 | 452.00 | 365 |
2009 | CEDAR VALLEY ENERGY INC | 526.00 | 339.00 | 365 |
2010 | CEDAR VALLEY ENERGY INC | 698.00 | 409.00 | 365 |
2011 | CEDAR VALLEY ENERGY INC | 614.00 | 389.00 | 365 |
2012 | CEDAR VALLEY ENERGY INC | 580.00 | 419.00 | 366 |
2013 | CEDAR VALLEY ENERGY INC | 498.00 | 284.00 | 365 |
2014 | CEDAR VALLEY ENERGY INC | 354.00 | 238.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1087161744 | 2014-12-29 0:00 | PB | No Violations | 2.00 |
-1993133736 | 2015-4-1 0:00:0 | FR | No Violations | 0.50 |
-447027385 | 2014-12-29 0:00 | PB | No Violations | 6.00 |
0327077508 | 2015-06-26 | Final Restoration | No Violations | This well was plugged and abandoned on 12/30/2014 and I was on location to check the status of Final Restoration which is due by the end of June. My inspection found the area of the well graded and seeded. The flow line from the wellhead to the tank battery was removed during plugging operations and the domestic meter that was located at the wellhead has been moved to the tank battery for the Lee #s 2, 3, & 4. The tank battery is still in use by the producing Lee wells and the lease road serves as a residential driveway and access to the Lee #4. A landowner waiver (Form 5) is not required. Final Restoration is approved. No violations. |
0389896909 | 2014-12-30 | Plug / Plug Back | No Violations | I was on location to witness the setting of the top 2 plugs in this well. Petroset rigged up and spotted a 200 plug at the bottom of the surface casing and Hagen Well Services pulled 8 joints of 4.5 casing. Petroset rigged up and pumped cement until good returns were achieved at the surface. The remaining 7 joints were pulled and the cement was holding at the top of the hole. A total of 90 joints of 10.5lb/ft., 4.5 casing was recovered during the job. See plugging report for more details on this job. No violations. |
0447027385 | 2014-12-29 | Plug / Plug Back | No Violations | I returned to location to witness plugging operations. Hagen Well Services finished pulling the tubing out of the hole and the trailer was loaded and hauled. The pipe trailer was spotted and Hagen ran in the hole with the knife tool and ripped the pipe at 2970. They pulled 6 joints to set the Big Lime plug. Petroset rigged up, established circulation, then mixed and pumped 18 barrels of cement slurry through the 4.5 casing. The plug was displaced to 2508 with 40 barrels of water. Hagen was going to pull pipe until dark and shut down until tomorrow. No violations. See plug report for more details on this job. |
1087161744 | 2014-12-29 | Plug / Plug Back | No Violations | I was on location to witness the spotting of the bottom plug in this well. Hagen Well Services had spotted 2.375 tubing at a depth of 4477. Petroset rigged up to the tubing and spotted a 760 plug (12.1 barrels) inside the 4.5 casing. Extra cement was used as a precaution due to the Lee #4 (24469) being drilled 1000 east of this location. Hagen began pulling the tubing from the hole and I left location. See plug report for more details on this job. No violations. |
1993133736 | 2015-04-01 | Final Restoration | No Violations | I was on location to check the final restoration status of this well that was plugged and abandoned on 12/30/14. Cedar Valleys contractor, Logan, was on location working on the drilling location to the east. The area where plugging operations occurred still needs to be reclaimed. I spoke with Logan and he told me that as soon as things start drying up they will get the area reclaimed and move the domestic hook-up that was beside the old wellhead to the tank battery for the Lee #s 2, 3, & 4. Final Restoration needs to be completed by the beginning of June. No violations. |
327077508 | 2015-6-26 0:00: | FR | No Violations | 0.50 |
389896909 | 2014-12-30 0:00 | PB | No Violations | 4.00 |
For data sources see[9]