X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24442

Well Details

Well ID: 34-121-24442
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Marion Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-000774
Farm/Lease Name: DEBASER CN NBL 34
License Status: Producing
License Date: 2015-03-06
Spud Date: 2013-11-08
Spud Drilling Contractor: SAVANNAH DRILLING
Final Drill Date: 2014-02-18
Well Total Depth: 7247.00 ft
Configuration: Horizontal
Latitude: 39.790000
Longitude: -81.410000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-08-01 Proposed Formations:POINT PLEASANT, Issued Date:8/1/2013, Expired Date:8/1/2015 12:00:00 PM, Drilling unit acres:684.25, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-08-16 ADDED X,Y COORDINATES TO SURFACE INFORMATION.
Reached Total Depth 2014-02-18
APP 2014-05-16 Proposed Formations:POINT PLEASANT, Issued Date:5/16/2014, Expired Date:5/15/2016 12:00:00 PM, Drilling unit acres:684.25, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2015-03-06 Proposed Formations:POINT PLEASANT, Issued Date:3/6/2015, Expired Date:3/5/2017 12:00:00 PM, Drilling unit acres:684.25, Proposed Well Type:OG, Proposed Well Class:EDPW
Completion Report Received 2016-08-02
Construction Permit Expires 2017-03-05
Change of Owner 2018-09-20 Operator changed from 8441, CNX GAS COMPANY LLC to 9520, ASCENT RESOURCES UTICA LLC
Record Last Modified 2018-10-25
Correction to Well 2018-10-26 CHANGE IN WELL NAME AND NUMBER. PREVIOUS--RESERVE COAL PROPERTIES CO #NBL34CHSU.

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/05/2014 11/17/2014 7902 11,393,200.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
Sand (Proppant), DAP-103, DAP-903,

DWP-111, DWP-612, DWP-901, BioClear 2000, DWP-NE1, Spearhead Acid

CWS Propping Agent, Iron Control, Scale Inhibitor, Gel Slurry, Friction Reducer, Breaker, Biocide, Non-Emulsifier, Clean Perforations Biotite 1302-27-8 0.1 0.00102 1084.7
Polyacrylamide polymer Proprietary 40 0.02941 31311.7
Crystalline silica (Quartz) 14808-60-7 100 10.1645 10,822,500.0
Citric acid 77-92-9 60 0.00367 3911.77
Fatty acids, tall-oil 61790-12-3 0.1 0.00153 1624.66
Guar gum 9000-30-0 60 0.01776 18908.1
Hydrochloric acid 7647-01-0 35 0.35604 379087
Dimethylcocoamine, bis(chloroethyl)

ether, diquaternary ammonium salt

68607-28-3 40 0.00001000 9.01
Polyoxyalkylenes surfactant Proprietary 5 0.00368 3913.96
Nonionic surfactant Proprietary 5 0.00368 3913.96
Formaldehyde 50-00-0 0.1 0.0001 108.31
Polyethylene glycol mixture 25322-68-3 70 0.01342 14286.9
Methanol 67-56-1 15 0.00305 3252.7
Diallyldimethylammonium chloride 7398-69-8 5 0 1.13
Sodium chloride 7647-14-5 0.1 0.00005000 54.16
Alcohols, C14-15, ethoxylated 68951-67-7 0.1 0.00153 1624.66
Isopropanol 67-63-0 40 0.00001000 9.01
Apatite 64476-38-6 0.1 0.00102 1084.7
Propargyl Alcohol 107-19-7 0.1 0.00051 541.55
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.01342 14286.9
Distillates (petroleum), hydrotreated middle 64742-46-7 60 0.01776 18908.1
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether 37251-67-5 1.5 0.00044 472.7
Modified thiourea polymer 68527-49-1 0.1 0.00153 1624.66
Paraffinic hydrocarbon solvent 64742-47-8 30 0.02206 23483.8
Alkenes, C>10 a- 64743-02-8 0.1 0.00153 1624.66
Calcite 471-34-1 1 0.02139 22778.7
2-Propenoic acid, polymer with sodium phosphonate 71050-62-9 60 0.00711 7566.64
Quaternary ammonium compounds,

bis(hydrogenated tallow alkyl)dimethyl, salts with bentonite

68953-58-2 5 0.00148 1575.67
Ammonium Persulfate 7727-54-0 100 0.00053 565
Goethite 1310-14-1 0.1 0.00306 3254.1
Water Customer & CWS Base Fluid & Mix Water Water 7732-18-5 100 89.3088 95,090,600.0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-11-05 H2O 0 0 349650 CalFrac STAGE1/31

40 SHOTS STAGES 2-30 SEE IMAGES

2014-11-17 H2O 0 0 315750 CalFrac STAGE 31/31

40 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 CNX GAS COMPANY LLC 811385 29719 282
2016 CNX GAS COMPANY LLC 504951 9122 357
2017 CNX GAS COMPANY LLC 344465 4211 364
2018 ASCENT RESOURCES UTICA LLC 238217 2319 335
2019 ASCENT RESOURCES UTICA LLC 56729 407 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 CNX GAS COMPANY LLC Brine 25831 282
2016 CNX GAS COMPANY LLC Brine 10774 357
2017 CNX GAS COMPANY LLC Brine 6289 364
2018 ASCENT RESOURCES UTICA LLC Brine 4170 335
2019 ASCENT RESOURCES UTICA LLC Brine 1003 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1008636271 2015-10-19 0:00 PW No Violations 1.00
-1051052246 2019-3-21 0:00: PW No Violations 0.60
-1264854644 2019-11-1 0:00: PW No Violations 0.50
-155092035 2014-2-18 0:00: CS No Violations 3.00
-2021344841 2018-9-20 0:00: PW No Violations 0.10
-605724569 2014-2-10 0:00: DD No Violations 1.00
-910858302 2015-1-13 0:00: PL No Violations
0079668777 2013-11-06 Drill / Deepen / Reopen No Violations My inspection finds the cellar has been set.
0155092035 2014-02-18 Casing String Witnessed No Violations I am onsite to witness the cementing of the 9.625. The casing was set at 7147. Calfrac cemented the casing in place with a combination a Dynapro lite lead and a class A tail.
0179341715 2013-12-05 Casing String Witnessed No Violations My inspection today finds the drilling rig, Yost 2, drilled 390 of 26 hole. The rig then ran 336 of 20 j-55 casing. Calfrac cemented the casing in place with 137 bbl of class A cement. I witnessed 20 bbl of cement returns to surface.
0605724569 2014-02-10 Drill / Deepen / Reopen No Violations Savanna Rig 640 is tripping in the hole to drill the 12.25 section of the well. I picked up the cement ticket for the first intermediate string.
0742127578 2017-08-24 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a Cameron production tree style wellhead. Production valves were in the open position. A gauge reads 250 pounds per square inch on the annulus between the 5.5 inch diameter production casing and the 9.625 inch diameter intermediate casing. A gauge reads 0 pounds per square inch on the annulus between the 9.625 inch diameter intermediate casing and the 13.375 inch diameter intermediate casing. The production equipment consisted of six 500 barrel tanks within steel line containment. A vapor recovery system to capture tank vapors consisted of one vent scrubber and one combustor. Three gas production units, one vertical heater treater, and one indirect line heater were located on the west side of the pad. The identification was located at the wellhead.
0910858302 2015-01-13 Preliminary Restoration No Violations My inspection today finds the well site meets preliminary restoration requirements. The tank battery consists of six 500 barrel tanks set in a liquid tight containment. Contractors are onsite building the production infrastructure.
1008636271 2015-10-19 Production Wells No Violations My inspection today finds the well appears capable of production and the production records are current. Force Trucking, truck number 2454, is loading production water. The tank battery consists of six 500 barrel tanks set in a steel dike with a liquid tight liner.
1051052246 2019-03-21 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing 2.875-inch diameter tubing utilizing a plunger lift system as means of production. Annular pressure monitoring was in place on all producing wells on the pad. Production equipment included a Sand Trap, a gas processing unit and six 500-barrel production fluid storage tanks that were shared with the other producing wells on the pad, there was secondary containment around the production fluid storage tanks. There were multiple Emergency Shut Down devices on location, Identification tags were present and had been updated to Ascent Resources and production was reported for 2018. There was a midstream valve site on the south side of the pad. At the time of my inspection I noticed a slip on the North side of the well pad and informed the operator of the problem as well as contacted ODNR Engineering Tech Andrew Thomas to inform him of the problem.
1489069860 2017-03-09 Production Wells No Violations The purpose of my inspection was a status check. TK Oilfield Service was on location removing a Frac tank and containment liner from the pad. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 870 pounds per square inch on the casing and 360 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment consists of four gas production units, six 500 barrel tanks, and one combustor. Identification was present and production records were current.
1701074141 2019-7-30 0:00: PW No Violations 0.50
179341715 2013-12-5 0:00: CS No Violations 4.00
2021344841 2018-09-20 Production Wells No Violations The purpose of my inspection was a status check. The well was equipped with a Cameron production tree style wellhead. Production valves were in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of four gas production units, six 500-barrel tanks, one horizontal vent scrubber, and one combustor. The identification stated CNX Gas Company. Ascent will have 60 days after the transfer date to post identification.
2055831660 2018-01-03 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a Cameron production tree style wellhead. Production valves were in the open position. The production equipment consisted of six 500 barrel tanks within steel line containment. A vapor recovery system to capture tank vapors consisted of one vent scrubber and one combustor. Four gas production units, one vertical heater treater, and one indirect line heater were located on the west side of the pad. The identification was located at the wellhead.
725313509 2019-12-26 0:00 PW No Violations 0.50
742127578 2017-8-24 0:00: PW No Violations 0.50
79668777 2013-11-6 0:00: DD No Violations 0.50

For data sources see[9]

References