If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24336 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.71,"lon":-81.55,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Olive Township | |
Operator Name: NGM NOBLE LTD | |
Well Pad ID: | |
Farm/Lease Name: B & E DAVIS COAL | |
License Status: Producing | |
License Date: 2010-04-19 | |
Spud Date: 2010-08-07 | |
Spud Drilling Contractor: FMS DRILLING | |
Final Drill Date: 2010-08-12 | |
Well Total Depth: 2360.00 ft | |
Configuration: Vertical | |
Latitude: 39.710000 | |
Longitude: -81.550000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-04-19 | Proposed Formations:BEREA/30 FOOT/GORDON/SHALE, Issued Date:4/19/2010, Expired Date:4/19/2011 6:00:00 AM, Drilling unit acres:140, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-08-12 | |
Completion Report Received | 2010-11-26 | |
Construction Permit Expires | 2011-04-19 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-01-25 | 1751 | 1769 | 18 |
2011-01-25 | 1842 | 2224 | 36 |
1751 | 1769 | 18 | |
1842 | 2224 | 36 | |
1751 | 1769 | 18 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2010-09-29 | H2O | 15 | 928 Bbl | 15000 | Universal Well Services Inc. | STAGE 2 OF 2…FRAC BAFFLE SET @ 1860' |
2010-09-29 | H2O | 15 | 798 Bbl | 7200 | Universal Well Services Inc. | STAGE 1 OF 2 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | GREEN GAS CO | 1594.00 | 44.00 | 0 |
2012 | GREEN GAS CO | 1131.00 | 20.00 | 366 |
2013 | GREEN GAS CO | 660.00 | 15.00 | 365 |
2014 | GREEN GAS CO | 472.00 | 42.00 | 365 |
2015 | GREEN GAS CO | 393.00 | 0.00 | 365 |
2016 | GREEN GAS CO | 356.00 | 0.00 | 365 |
2017 | GREEN GAS CO | 314.00 | 0.00 | 365 |
2018 | GREEN GAS CO | 358.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | GREEN GAS CO | Brine | 112 | |
2012 | GREEN GAS CO | Brine | 0 | 366 |
2013 | GREEN GAS CO | Brine | 0 | 365 |
2014 | GREEN GAS CO | Brine | 23 | 365 |
2015 | GREEN GAS CO | Brine | 0 | 365 |
2016 | GREEN GAS CO | Brine | 0 | 365 |
2017 | GREEN GAS CO | Brine | 0 | 365 |
2018 | GREEN GAS CO | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0209596778 | 2012-02-06 | Preliminary Restoration | No Violations | Upon inspection of well site area found pits filled and vegetation established -at well head 8.625 surface casing -4.5production casing-1.5tubing-with production valves open -well is being produced by means of a pumping unit .At well production fluid storage area found 3three 100 barrel fluid tanks -2twoseparators -and 2twogas meters. |
209596778 | 2012-2-6 0:00:0 | PL | No Violations |
For data sources see[9]