If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24210 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.73,"lon":-81.42,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Enoch Township | |
Operator Name: LIPPIZAN PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: CONSOLIDATED COAL CO | |
License Status: Producing | |
License Date: 2006-12-20 | |
Spud Date: 2007-06-25 | |
Spud Drilling Contractor: G & L DRILLING | |
Final Drill Date: 2007-06-30 | |
Well Total Depth: 3511.00 ft | |
Configuration: Vertical | |
Latitude: 39.730000 | |
Longitude: -81.420000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-12-20 | Proposed Formations:OHIO SHALE, Issued Date:12/20/2006, Expired Date:12/20/2007 6:00:00 AM, Drilling unit acres:112, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-06-30 | |
Reached Total Depth | 2007-06-30 | |
Completion Report Received | 2007-08-27 | |
Construction Permit Expires | 2007-12-20 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-11-30 | 1932 | 2486 | 82 |
1932 | 2486 | 82 | |
1932 | 2486 | 82 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 3800 Bbl | 45000 | SLOTTED CASING: 2561 TO 3433. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | BUCKEYE OIL PRODUCING CO | 1481.00 | 80.00 | 365 |
2008 | BUCKEYE OIL PRODUCING CO | 2787.00 | 180.00 | 365 |
2009 | BUCKEYE OIL PRODUCING CO | 2045.00 | 248.00 | 365 |
2010 | BUCKEYE OIL PRODUCING CO | 1635.00 | 148.00 | 365 |
2011 | BUCKEYE OIL PRODUCING CO | 1812.00 | 225.00 | 365 |
2012 | BUCKEYE OIL PRODUCING CO | 1098.00 | 153.00 | 366 |
2013 | BUCKEYE OIL PRODUCING CO | 1003.00 | 145.00 | 365 |
2014 | BUCKEYE OIL PRODUCING CO | 2429.00 | 222.00 | 365 |
2015 | BUCKEYE OIL PRODUCING CO | 667.00 | 85.00 | 365 |
2016 | BUCKEYE OIL PRODUCING CO | 881.00 | 172.00 | 365 |
2017 | BUCKEYE OIL PRODUCING CO | 298.00 | 72.00 | 365 |
2018 | BUCKEYE OIL PRODUCING CO | 340.00 | 77.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | BUCKEYE OIL PRODUCING CO | Brine | 146 | 365 |
2008 | BUCKEYE OIL PRODUCING CO | Brine | 46 | 365 |
2009 | BUCKEYE OIL PRODUCING CO | Brine | 17 | 365 |
2010 | BUCKEYE OIL PRODUCING CO | Brine | 12 | 365 |
2011 | BUCKEYE OIL PRODUCING CO | Brine | 8 | 365 |
2012 | BUCKEYE OIL PRODUCING CO | Brine | 2 | 366 |
2013 | BUCKEYE OIL PRODUCING CO | Brine | 2 | 365 |
2014 | BUCKEYE OIL PRODUCING CO | Brine | 1 | 365 |
2015 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2016 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2017 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2018 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1354507936 | 2007-8-21 0:00: | PL | No Violations | |
-446957381 | 2012-4-23 0:00: | PW | No Violations | |
0446957381 | 2012-04-23 | Production Wells | No Violations | Inspection of well head found the following -4.5 production casing -1.5 tubing with the proper production valves open and the well being produced by the means of a pumping unit -210 barrel tank and separator present in an established dike with proper well identification. |
1354507936 | 2007-08-21 | Preliminary Restoration | No Violations | Restoration work at site satisfactory, well is equipped with pump jack and tubing and rods and 1-100 bbl tank with dike in place. |
1966044714 | 2012-11-19 | Production Wells | No Violations | My inspection today finds the well is equipped with 4.5 casing 1.5 tubing, rods, and a pump jack. The tank battery consists of two 100 bbl tanks, a separator, and two meters. All equipment is located inside of a dike, and the tanks are properly identified. |
For data sources see[9]