X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24146

Well Details

Well ID: 34-121-24146
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Stock Township
Operator Name: NORTHWOOD ENERGY CORP
Well Pad ID:
Farm/Lease Name: STATE OF OHIO/MM
License Status: Producing
License Date: 2005-09-02
Spud Date: 2005-11-16
Spud Drilling Contractor: WARREN DRLG
Final Drill Date: 2005-11-29
Well Total Depth: 6695.00 ft
Configuration: Vertical
Latitude: 39.710000
Longitude: -81.390000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2005-06-10 Proposed Formations:CLINTON-MEDINA, Issued Date:6/10/2005, Expired Date:6/10/2006 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2005-07-15 CORRECTION TO FOOTAGE: SHOULD BE "1400'SL & 630'EL OF NE QTR., SEC. 15".
APP 2005-09-02 Proposed Formations:CLINTON/MEDINA, Issued Date:9/2/2005, Expired Date:9/2/2006 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2005-11-16 RBDMS Rec
Completed 2005-11-29 RBDMS Rec
Reached Total Depth 2005-11-29 RBDMS Rec
Completion Report Received 2006-02-14 RBDMS Rec
Construction Permit Expires 2006-09-02 RBDMS Rec
Change of Owner 2013-08-05 Operator changed from 6288, ALLIANCE PETROLEUM CORPORATION to 1634, NORTHWOOD ENERGY CORP
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-05-04 6462 6536 24
6462 6536 24
6462 6536 24

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 74000 Gal 30000 500 GALLONS IF ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2006 ALLIANCE PETROLEUM CORPORATION 4710.00 0.00 346
2007 ALLIANCE PETROLEUM CORPORATION 3160.00 0.00 365
2008 ALLIANCE PETROLEUM CORPORATION 2121.00 0.00 365
2009 ALLIANCE PETROLEUM CORPORATION 1777.00 0.00 365
2010 ALLIANCE PETROLEUM CORPORATION 1285.00 0.00 365
2011 ALLIANCE PETROLEUM CORPORATION 816.00 1.00 365
2012 ALLIANCE PETROLEUM CORPORATION 741.00 0.00 366
2013 NORTHWOOD ENERGY CORP 161.00 0.00 365
2014 NORTHWOOD ENERGY CORP 81.00 0.00 365
2015 NORTHWOOD ENERGY CORP 201.00 0.00 365
2016 NORTHWOOD ENERGY CORP 183.00 0.00 365
2017 NORTHWOOD ENERGY CORP 117.00 0.00 365
2018 NORTHWOOD ENERGY CORP 95.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2006 ALLIANCE PETROLEUM CORPORATION Brine 0 346
2007 ALLIANCE PETROLEUM CORPORATION Brine 0 365
2008 ALLIANCE PETROLEUM CORPORATION Brine 0 365
2009 ALLIANCE PETROLEUM CORPORATION Brine 0 365
2010 ALLIANCE PETROLEUM CORPORATION Brine 0 365
2011 ALLIANCE PETROLEUM CORPORATION Brine 0 365
2012 ALLIANCE PETROLEUM CORPORATION Brine 0 366
2013 NORTHWOOD ENERGY CORP Brine 0 365
2014 NORTHWOOD ENERGY CORP Brine 0 365
2015 NORTHWOOD ENERGY CORP Brine 75 365
2016 NORTHWOOD ENERGY CORP Brine 0 365
2017 NORTHWOOD ENERGY CORP Brine 0 365
2018 NORTHWOOD ENERGY CORP Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1351669172 2012-8-31 0:00: PW No Violations 0.50
-159065761 2020-4-15 0:00: PW No Violations 0.50
0550793661 2014-09-25 Production Wells No Violations My inspection today finds the well is equipped with 4.5 casing and 1.5 tubing with a plunger lift system. The production valves are open. The tank battery consists of one 100 bbl tank, a separator, and a meter with current chart. The production equipment is located in a dike and the identification is proper.
0768433046 2012-06-12 Production Wells No Violations Inspection of the well head found the following equipment -4.5 production casing -1.5 tubing with the production valves open and the well being produced by the means of a plunger lift system. A 100 barrel tank separator and gas meter with a current chart are present in an established dike with proper well identification present.
0939202735 2013-12-13 Production Wells No Violations My inspection today finds the well is equipped with 4.5 casing and 1.5 tubing with a plunger lift system. The production valves are open. The tank battery consists of one 100 bbl tank, a separator, and a meter with current chart. The production equipment is located in a dike and the identification is proper.
1045967892 2006-11-03 Preliminary Restoration No Violations Restoration work at site satisfactory well is equipped with pump jack tubing&rods and 2-100 bbl tanks with proper dike in place.
1132428521 2005-11-16 Drill / Deepen / Reopen No Violations Drove by drillsite rig moving in on site stopped and talked to tool pusher inquired about upcoming surface job.
1133604270 2005-12-29 Drill / Deepen / Reopen No Violations Stopped by drill rig for update they were T.D.ed@6695 looked at geolograph and picked formation tops they are as followsLime@4608-6133 Clinton sand@6442-6534 Medina@6575-6585 hole became damp@4835 possibly Oriskany formation.Noted :Gas flow at end of blowline.
1351669172 2012-08-31 Production Wells No Violations My inspection today finds the well is equipped with 4.5 casing and 1.5 tubing with a plunger lift system. The production valves are open. The tank battery consists of one 100 bbl tank, a separator, and a meter with current chart. The dike is adequate and the identification is proper.
550793661 2014-9-25 0:00: PW No Violations 1.00
768433046 2012-6-12 0:00: PW No Violations
939202735 2013-12-13 0:00 PW No Violations 0.50

For data sources see[9]

References