X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-20628

Well Details

Well ID: 34-119-20628
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Newton Township
Operator Name: OXFORD OIL
Well Pad ID:
Farm/Lease Name: SHAW ELMER
License Status: Final Restoration
License Date: 2005-04-15
Spud Date: 1966-04-14
Spud Drilling Contractor:
Final Drill Date: 1966-04-28
Well Total Depth: 3346.00 ft
Configuration: Vertical
Latitude: 39.850000
Longitude: -82.150000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1966-04-14 ELEVATION 871.7-G, OWDD 4/21/1966 200MCFG, 25 BOPD/AF: OWWO 4/21/66
CO 1966-04-18 79 OXFORD OIL CO GeoDate 4/18/66
Unknown 1966-04-18 Issued Date Expired Date Acres 0000000 Tool Type Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
Completed 1966-04-28 ELEVATION 871.7-G, OWDD 4/21/1966 200MCFG, 25 BOPD/AF: OWWO 4/21/66
Reached Total Depth 1966-04-28 ELEVATION 871.7-G, OWDD 4/21/1966 200MCFG, 25 BOPD/AF: OWWO 4/21/66
APP 2005-04-15 Proposed Formations:CLINTON, Issued Date:4/15/2005, Expired Date:4/15/2006 6:00:00 AM, Drilling unit acres:109.48, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2006-01-24 ELEVATION 871.7-G, OWDD 4/21/1966 200MCFG, 25 BOPD/AF: OWWO 4/21/66
Construction Permit Expires 2006-04-15 ELEVATION 871.7-G, OWDD 4/21/1966 200MCFG, 25 BOPD/AF: OWWO 4/21/66
Record Last Modified 2013-03-14 ELEVATION 871.7-G, OWDD 4/21/1966 200MCFG, 25 BOPD/AF: OWWO 4/21/66

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3284 3286 3
2006-09-11 3290 3296 6
3284 3286 3
3284 3286 3
2006-09-11 3316 3322 5

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1474 Bbl 225000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 OXFORD OIL 0.00 232.00 0
1985 OXFORD OIL 0.00 191.00 365
1986 OXFORD OIL 0.00 75.00 365
1987 OXFORD OIL 0.00 137.00 365
1988 OXFORD OIL 0.00 62.00 365
1989 OXFORD OIL 0.00 0.00 365
1990 OXFORD OIL 0.00 119.00 365
1991 OXFORD OIL 0.00 60.00 365
1992 OXFORD OIL 200.00 69.00 365
1993 OXFORD OIL 0.00 238.00 365
1994 OXFORD OIL 0.00 145.00 365
1995 OXFORD OIL 0.00 81.00 365
1996 OXFORD OIL 0.00 142.00 366
1997 OXFORD OIL 0.00 82.00 365
1998 OXFORD OIL 0.00 82.00 365
1999 OXFORD OIL 0.00 72.00 365
2000 OXFORD OIL 0.00 80.00 0
2001 OXFORD OIL 0.00 75.00 365
2002 OXFORD OIL 0.00 80.00 365
2003 OXFORD OIL 0.00 138.00 365
2004 OXFORD OIL 0.00 74.00 365
2005 OXFORD OIL 0.00 76.00 365
2006 OXFORD OIL 0.00 34.00 365
2007 OXFORD OIL 0.00 0.00 365
2008 OXFORD OIL 0.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 OXFORD OIL Brine 0 0
1985 OXFORD OIL Brine 0 365
1986 OXFORD OIL Brine 20 365
1987 OXFORD OIL Brine 20 365
1988 OXFORD OIL Brine 20 365
1989 OXFORD OIL Brine 0 365
1990 OXFORD OIL Brine 0 365
1991 OXFORD OIL Brine 20 365
1992 OXFORD OIL Brine 215 365
1993 OXFORD OIL Brine 0 365
1994 OXFORD OIL Brine 0 365
1995 OXFORD OIL Brine 50 365
1996 OXFORD OIL Brine 70 366
1997 OXFORD OIL Brine 25 365
1998 OXFORD OIL Brine 10 365
1999 OXFORD OIL Brine 0 365
2000 OXFORD OIL Brine 24
2001 OXFORD OIL Brine 69 365
2002 OXFORD OIL Brine 118 365
2003 OXFORD OIL Brine 22 365
2004 OXFORD OIL Brine 47 365
2005 OXFORD OIL Brine 85 365
2006 OXFORD OIL Brine 20 365
2007 OXFORD OIL Brine 0 365
2008 OXFORD OIL Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1138214776 2006-01-25 Final Restoration No Violations Well has been plugged properly, all production equipment and debris has been removed, the location and tank dike has been smoothed and returned to original contour. May need touched up and seeded in the spring.

For data sources see[9]

References