X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-115-24674

Well Details

Well ID: 34-115-24674
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Deerfield Township
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: SIGMAN VINCENT
License Status: Producing
License Date: 2013-03-14
Spud Date: 2013-06-18
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2013-07-02
Well Total Depth: 6315.00 ft
Configuration: Vertical
Latitude: 39.650000
Longitude: -82.020000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-03-14 Proposed Formations:KNOX, Issued Date:3/14/2013, Expired Date:3/14/2015 12:00:00 PM, Drilling unit acres:45, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-07-02 GMM UPDTED FIST PRODCUTION DATE TO 6/27/2014 PER FORM 6A.
Completion Report Received 2014-09-26 GMM UPDTED FIST PRODCUTION DATE TO 6/27/2014 PER FORM 6A.
Construction Permit Expires 2015-03-14 GMM UPDTED FIST PRODCUTION DATE TO 6/27/2014 PER FORM 6A.
Record Last Modified 2017-10-23 GMM UPDTED FIST PRODCUTION DATE TO 6/27/2014 PER FORM 6A.

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ARTEX OIL COMPANY 12025.00 0.00 365
2015 ARTEX OIL COMPANY 24816.00 43.00 365
2016 ARTEX OIL COMPANY 19518.00 52.00 365
2017 ARTEX OIL COMPANY 13746.00 27.00 365
2018 ARTEX OIL COMPANY 11972.00 0.00 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ARTEX OIL COMPANY Brine 2769 365
2015 ARTEX OIL COMPANY Brine 4705 365
2016 ARTEX OIL COMPANY Brine 4514 365
2017 ARTEX OIL COMPANY Brine 4391 365
2018 ARTEX OIL COMPANY Brine 4705 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-114623059 2013-7-12 0:00: DD No Violations 0.50
-124301225 2013-6-19 0:00: CS No Violations 3.50
-739029579 2013-10-30 0:00 DD No Violations 0.50
0114623059 2013-07-12 Drill / Deepen / Reopen No Violations I came to location to witness the perf job but they had completed job earlier than expected and were running tubing when I arrived on location.
0124301225 2013-06-19 Casing String Witnessed No Violations I was on location to witness the cementing of the surface casing by Formation Cement CO. Artex is using the Kilbarger Patterson #17 rig. The Kilbarger drilled a 12 1/4 hole to a TD of 739. The casing shoe depth was 687. Centralizers were not run on the surface casing and the baffle insert was at a depth of 645. The plug was down at 2:33pm with good cement returns. The baffle still had a flapper so they shut the well in and bled the pressure to zero therefore indicating there were no leaks or loss of cement. I will return tomorrow to witness the surface casing pressure test (500psi for 5 minutes) when they test the BOP.
0188797369 2014-08-15 Preliminary Restoration No Violations Site now correctly meets 1509.072 preliminary requirements.
0739029579 2013-10-30 Drill / Deepen / Reopen No Violations The location almost meets preliminary restoration requirements, however there is still some equipment on site and the well isnt completely hooked up to tanks and separator. The pits have been filled and the location has good vegetative growth. I will come back next month to see if they have completed restoration.
1371522921 2013-06-17 Casing String Witnessed No Violations I was on location to witness the cementing of the conductor casing by Formation Cement CO. Artex is using the Killbarger Patterson #17 rig. There was good returns on the cement job.
1371733258 2013-06-20 Drill / Deepen / Reopen No Violations I was on location to witness the integrity of the surface casing. Artex had hooked up a high pressure pump with a pressure gauge box to the casing head in order to test the annular at 300psi for 30 minutes. Test began at 10:10 AM with a psi of 320 and passed at 10:45 with 310psi. They will finish installing the choke line, trip in hole with 3.5 heavy weight drill pipe down to baffle, close off the annular, and then test the BOP.
1373896507 2013-07-15 Completion Testing No Violations I came to location to witness Producers perform an acid job on the Beekmantown formation for Artex. They were still treating the formation with acid when I left the location.
1399995142 2014-05-13 Drill / Deepen / Reopen No Violations The site does not yet meet preliminary restoration requirements of ORC 1509.072A. The wellhead area has been restored with grass however the area of the dike still needs work. The access road near the dike and separator is still being used to keep pipeline. The well is still shut in however operator has recently completed pipeline installation.
1475702434 2013-06-17 Administrative Inspection No Violations Heath, from Artex, called and stated they were moving the Killbarger Patterson 17 rig onto location sometime today to begin drilling the conductor hole.
1710840498 2013-06-20 Drill / Deepen / Reopen No Violations Witnessed Blow Out Preventer test. 590 psi was held on the annulus for the required time period with no loss in pressure. Also witnessed the grouting of the surface casing with 50 sacks of Class A cement. Cement top had fallen back roughly 20 after the surface job. Good returns were seen at the surface.
188797369 2014-8-15 0:00: PL No Violations

For data sources see[7]

References