If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-24341 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.72,"lon":-81.71,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Bristol Township | |
Operator Name: OHIO ENERGY ASSETS, INC. | |
Well Pad ID: | |
Farm/Lease Name: LEONA REX-OHIO POWER CO | |
License Status: Final Restoration | |
License Date: 2013-07-29 | |
Spud Date: 1993-11-10 | |
Spud Drilling Contractor: OHIO ENERGY ASSETS | |
Final Drill Date: 1993-11-14 | |
Well Total Depth: 5190.00 ft | |
Configuration: Vertical | |
Latitude: 39.720000 | |
Longitude: -81.710000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1992-12-28 | Issued Date 12/28/92 Expired Date 12/28/93 Acres 0040000 Tool Type RTA Proposed Formation CLINTON/CPRG Proposed Depth 05190 Proposed Drill Depth 05190 |
Original Spud | 1993-11-10 | CHG ELEV 11-13-93 PERMIT EXPIRED. CHANGED STATUS FROM PA TO FR PER FACILITY REPORT FROM JAKE GLASCOCK DATED 10/30/2014 CM |
Completed | 1993-11-14 | CHG ELEV 11-13-93 PERMIT EXPIRED. CHANGED STATUS FROM PA TO FR PER FACILITY REPORT FROM JAKE GLASCOCK DATED 10/30/2014 CM |
Reached Total Depth | 1993-11-14 | CHG ELEV 11-13-93 PERMIT EXPIRED. CHANGED STATUS FROM PA TO FR PER FACILITY REPORT FROM JAKE GLASCOCK DATED 10/30/2014 CM |
CO | 1993-12-28 | 3243 OHIO PRODUCTION CORP GeoDate 12/28/92 |
Completion Report Received | 1994-04-14 | CHG ELEV 11-13-93 PERMIT EXPIRED. CHANGED STATUS FROM PA TO FR PER FACILITY REPORT FROM JAKE GLASCOCK DATED 10/30/2014 CM |
Change of Owner | 1998-03-10 | Operator changed from 3243, OHIO PRODUCTION CORP to 6091, OHIO ENERGY ASSETS, INC. |
APP | 2013-07-29 | Proposed Formations:CLINTON-MEDINA, Issued Date:7/29/2013, Expired Date:7/29/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2013-09-26 | CHG ELEV 11-13-93 PERMIT EXPIRED. CHANGED STATUS FROM PA TO FR PER FACILITY REPORT FROM JAKE GLASCOCK DATED 10/30/2014 CM |
Construction Permit Expires | 2015-07-29 | CHG ELEV 11-13-93 PERMIT EXPIRED. CHANGED STATUS FROM PA TO FR PER FACILITY REPORT FROM JAKE GLASCOCK DATED 10/30/2014 CM |
Record Last Modified | 2017-02-10 | CHG ELEV 11-13-93 PERMIT EXPIRED. CHANGED STATUS FROM PA TO FR PER FACILITY REPORT FROM JAKE GLASCOCK DATED 10/30/2014 CM |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4908 | 5008 | 0 |
4908 | 5008 | 0 | |
2006-09-11 | 4914 | 5066 | 30 |
4914 | 5066 | 30 | |
4908 | 5008 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 0 | 90000 | FRAC...WATER/SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | OHIO PRODUCTION CORP | 30.00 | 0.00 | 1 |
1994 | OHIO PRODUCTION CORP | 5347.00 | 0.00 | 362 |
1995 | OHIO PRODUCTION CORP | 6231.00 | 0.00 | 360 |
1996 | OHIO PRODUCTION CORP | 8065.00 | 77.00 | 363 |
1997 | OHIO PRODUCTION CORP | 6647.00 | 0.00 | 316 |
1998 | OHIO ENERGY ASSETS, INC. | 7463.00 | 0.00 | 316 |
1999 | OHIO ENERGY ASSETS, INC. | 7360.00 | 0.00 | 365 |
2000 | OHIO ENERGY ASSETS, INC. | 7121.00 | 46.00 | 365 |
2001 | OHIO ENERGY ASSETS, INC. | 5262.00 | 0.00 | 365 |
2002 | OHIO ENERGY ASSETS, INC. | 4594.00 | 0.00 | 344 |
2003 | OHIO ENERGY ASSETS, INC. | 2762.00 | 0.00 | 353 |
2004 | OHIO ENERGY ASSETS, INC. | 2038.00 | 0.00 | 320 |
2005 | OHIO ENERGY ASSETS, INC. | 0.00 | 0.00 | 0 |
2006 | OHIO ENERGY ASSETS, INC. | 0.00 | 0.00 | 0 |
2007 | OHIO ENERGY ASSETS, INC. | 0.00 | 0.00 | 0 |
2008 | OHIO ENERGY ASSETS, INC. | 0.00 | 0.00 | 0 |
2009 | OHIO ENERGY ASSETS, INC. | 0.00 | 0.00 | 0 |
2010 | OHIO ENERGY ASSETS, INC. | 130.00 | 0.00 | 21 |
2011 | OHIO ENERGY ASSETS, INC. | 0.00 | 0.00 | 0 |
2012 | OHIO ENERGY ASSETS, INC. | 0.00 | 0.00 | 0 |
2013 | OHIO ENERGY ASSETS, INC. | 0.00 | 0.00 | 114 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | OHIO PRODUCTION CORP | Brine | 0 | 1 |
1994 | OHIO PRODUCTION CORP | Brine | 0 | 362 |
1995 | OHIO PRODUCTION CORP | Brine | 30 | 360 |
1996 | OHIO PRODUCTION CORP | Brine | 0 | 363 |
1997 | OHIO PRODUCTION CORP | Brine | 0 | 316 |
1998 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 316 |
1999 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 365 |
2000 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 365 |
2001 | OHIO ENERGY ASSETS, INC. | Brine | 37 | 365 |
2002 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 344 |
2003 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 353 |
2004 | OHIO ENERGY ASSETS, INC. | Brine | 138 | 320 |
2005 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 0 |
2006 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 0 |
2007 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 0 |
2008 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 0 |
2009 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 0 |
2010 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 21 |
2011 | OHIO ENERGY ASSETS, INC. | Brine | 0 | |
2012 | OHIO ENERGY ASSETS, INC. | Brine | 0 | 0 |
2013 | OHIO ENERGY ASSETS, INC. | Brine | 65 | 114 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1106449237 | 2011-4-5 0:00:0 | PW | No Violations | 1.00 |
-1725121121 | 2014-5-1 0:00:0 | PB | No Violations | 1.00 |
0294266285 | 2011-05-19 | Production Wells | No Violations | Columbus reports production of 130 mcf over 21 days for 2010. Meets requirements. Production not showing up in my computer. |
0779413273 | 2013-09-26 | Plug / Plug Back | No Violations | Knox Energy and Cemenco were on location to plug the well. They ripped the 4.5 at 3643 and pulled one joint at 3602. A 200 rip/Big Lime plug was set from. The bottom of the surface casing plug was set from 1533-1733. There was no circulation. They then set a brush and stone plug at ~350 with 150 bbls of water on top, followed by a 200 surface plug. The cement stayed at the surface. |
1076666809 | 2004-02-12 | Preliminary Restoration | No Violations | Preliminary restoration passed. |
1080265583 | 2014-09-16 | Plug / Plug Back | No Violations | Joe Melville of OEA asked me to check on resoration of well location. The site does not yet meet final restoration status due to several barren areas on the road and well location. All of the production equipment has been removed from the area. |
1106449237 | 2011-04-05 | Production Wells | No Violations
- produced last year and they will be turning production in for 2010. Meter out at road has no chart, good IDs, tank back in woods with well. | |
1201434500 | 2014-06-10 | Plug / Plug Back | No Violations | This site did not meet final restoration requirements because the roadways were not restored. There are flow lines left behind leading to the top of the hill and a steel flow line on top of the hill. Also at the beginning of the road way there is a separator, flow lines, fence and an 800 gallon poly tank left behind. |
1380126934 | 2013-09-25 | Plug / Plug Back | No Violations | I arrived on location with Cemenco to witness the bottom hole plug job. The bottom of the tubing was at 4825 and a 400 cement plug was set from 4425-4825. Knox Energy will pull the rest of the tubing from the hole and plugging will commence tomorrow. |
1385998021 | 2013-12-02 | Plug / Plug Back | No Violations | The site does not yet meet final restoration status so I will come back in spring for a follow up inspection. |
1414679302 | 2014-10-30 | Final Restoration | No Violations | Location meets 1509.072 final restoration requirements. |
1449548859 | 2015-12-07 | Final Restoration | No Violations | An inspection of this well location using RBDMS coordinates revealed no well found. RBDMS records indicate this well being plugged on 9/26/2013. The final restoration was passed on 10/30/2014. Well status in RBDMS is (FR) Final Restoration. Time of inspection: 3:00 PM. |
1725121121 | 2014-05-01 | Plug / Plug Back | No Violations | The site does not yet meet final restoration status. There is still production equipment at location (well head, flow lines, etc.). Grass is growing on some areas. |
1873818165 | 2014-06-11 | Plug / Plug Back | No Violations | This site did not meet final restoration requirements because there is a regulator, meter and flow lines left lying in a pile. |
294266285 | 2011-5-19 0:00: | PW | No Violations | 0.50 |
779413273 | 2013-9-26 0:00: | PB | No Violations | 6.00 |
For data sources see[9]