X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-115-24061

Well Details

Well ID: 34-115-24061
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Center Township
Operator Name: SABRE ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name: TOWNSEND G ETAL
License Status: Final Restoration
License Date: 1998-04-30
Spud Date: 1988-12-02
Spud Drilling Contractor: ENTERPRISE DRLG
Final Drill Date: 1988-12-09
Well Total Depth: 5461.00 ft
Configuration: Vertical
Latitude: 39.630000
Longitude: -81.640000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1987-12-07 182 BELDEN & BLAKE CO GeoDate 12/7/87
Oil and Gas 1987-12-07 Issued Date 12/7/87 Expired Date 12/6/88 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05461 Proposed Drill Depth 05461
Original Spud 1988-12-02
Completed 1988-12-09
Reached Total Depth 1988-12-09
Completion Report Received 1989-02-13
CO 1996-11-22 5244 SABRE ENERGY CORPORATION GeoDate 12/7/87
APP 1998-04-30 Proposed Formations:CLINTON, Issued Date:4/30/98, Expired Date:4/30/99 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 1998-05-14
Construction Permit Expires 1999-04-30
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 5264 5318 0
5264 5318 0
2006-09-11 5265 5316 25
5265 5316 25
5264 5318 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 99930 Gal 60000 FRAC:WATER/SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1990 BELDEN & BLAKE CORPORATION 2156.00 0.00 199
1991 BELDEN & BLAKE CORPORATION 5287.00 0.00 365
1992 BELDEN & BLAKE CORPORATION 2755.00 0.00 321
1993 BELDEN & BLAKE CORPORATION 2693.00 0.00 340
1994 BELDEN & BLAKE CORPORATION 2149.00 0.00 358
1995 BELDEN & BLAKE CORPORATION 1012.00 0.00 179
1996 SABRE ENERGY CORPORATION 670.00 0.00 63
1997 SABRE ENERGY CORPORATION 2397.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1990 BELDEN & BLAKE CORPORATION Brine 47 199
1991 BELDEN & BLAKE CORPORATION Brine 126 365
1992 BELDEN & BLAKE CORPORATION Brine 0 321
1993 BELDEN & BLAKE CORPORATION Brine 0 340
1994 BELDEN & BLAKE CORPORATION Brine 0 358
1995 BELDEN & BLAKE CORPORATION Brine 2 179
1996 SABRE ENERGY CORPORATION Brine 0 63
1997 SABRE ENERGY CORPORATION Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL9294 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
iDIAN00021 1998-10-05 Final Restoration No Violations
iDIAN000219 1998-10-5 0:00: FR No Violations
PL9294 PL No Violations

For data sources see[9]

References