X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-115-21272

Well Details

Well ID: 34-115-21272
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Bristol Township
Operator Name: LIPPIZAN PETROLEUM INC
Well Pad ID:
Farm/Lease Name: OHIO POWER CO
License Status: Producing
License Date: 1972-03-20
Spud Date: 1972-05-14
Spud Drilling Contractor:
Final Drill Date: 1972-07-26
Well Total Depth: 4860.00 ft
Configuration: Vertical
Latitude: 39.690000
Longitude: -81.790000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1972-03-20 275 MIDWEST EXPLORATION INC GeoDate 3/20/72
Original Spud 1972-05-14
Completed 1972-07-26
Reached Total Depth 1972-07-26
CO 1992-07-30 296 DERRICK PETROLEUM INC GeoDate 3/20/72
CO 1995-08-14 56 BUCKEYE OIL PRODUCING CO GeoDate 3/20/72
Record Last Modified 2013-10-03

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2000 Bbl 3000

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 MIDWEST EXPLORATION INC 2797.00 242.00 0
1985 MIDWEST EXPLORATION INC 0.00 264.00 0
1986 MIDWEST EXPLORATION INC 751.00 0.00 365
1987 MIDWEST EXPLORATION INC 582.00 149.00 365
1988 MIDWEST EXPLORATION INC 24.00 361.00 0
1989 MIDWEST EXPLORATION INC 25.00 291.00 365
1990 MIDWEST EXPLORATION INC 2386.00 286.00 365
1992 DERRICK PETROLEUM INC 0.00 0.00 365
1993 DERRICK PETROLEUM INC 3509.00 141.00 365
1994 DERRICK PETROLEUM INC 2753.00 304.00 365
1995 BUCKEYE OIL PRODUCING CO 2462.00 226.00 320
1996 BUCKEYE OIL PRODUCING CO 2902.00 287.00 320
1997 BUCKEYE OIL PRODUCING CO 3035.00 197.00 365
1998 BUCKEYE OIL PRODUCING CO 2628.00 0.00 365
1999 BUCKEYE OIL PRODUCING CO 2272.00 144.00 0
2000 BUCKEYE OIL PRODUCING CO 3296.00 207.00 0
2001 BUCKEYE OIL PRODUCING CO 4257.00 275.00 365
2002 BUCKEYE OIL PRODUCING CO 2503.00 311.00 365
2003 BUCKEYE OIL PRODUCING CO 1916.00 197.00 365
2004 BUCKEYE OIL PRODUCING CO 1914.00 262.00 365
2005 BUCKEYE OIL PRODUCING CO 1141.00 165.00 365
2006 BUCKEYE OIL PRODUCING CO 2599.00 179.00 365
2007 BUCKEYE OIL PRODUCING CO 1316.00 190.00 365
2008 BUCKEYE OIL PRODUCING CO 2565.00 186.00 365
2009 BUCKEYE OIL PRODUCING CO 2576.00 121.00 365
2010 BUCKEYE OIL PRODUCING CO 2724.00 256.00 365
2011 BUCKEYE OIL PRODUCING CO 2283.00 157.00 365
2012 BUCKEYE OIL PRODUCING CO 1179.00 183.00 366
2013 BUCKEYE OIL PRODUCING CO 1398.00 193.00 365
2014 BUCKEYE OIL PRODUCING CO 1439.00 132.00 365
2015 BUCKEYE OIL PRODUCING CO 1230.00 115.00 365
2016 BUCKEYE OIL PRODUCING CO 2127.00 177.00 365
2017 BUCKEYE OIL PRODUCING CO 1708.00 157.00 365
2018 BUCKEYE OIL PRODUCING CO 1265.00 136.00 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 MIDWEST EXPLORATION INC Brine 0 0
1985 MIDWEST EXPLORATION INC Brine 3460 0
1986 MIDWEST EXPLORATION INC Brine 80 365
1987 MIDWEST EXPLORATION INC Brine 0 365
1988 MIDWEST EXPLORATION INC Brine 0 0
1989 MIDWEST EXPLORATION INC Brine 0 365
1990 MIDWEST EXPLORATION INC Brine 0 365
1992 DERRICK PETROLEUM INC Brine 0 365
1993 DERRICK PETROLEUM INC Brine 200 365
1994 DERRICK PETROLEUM INC Brine 140 365
1995 BUCKEYE OIL PRODUCING CO Brine 160 320
1996 BUCKEYE OIL PRODUCING CO Brine 119 320
1997 BUCKEYE OIL PRODUCING CO Brine 95 365
1998 BUCKEYE OIL PRODUCING CO Brine 365
1999 BUCKEYE OIL PRODUCING CO Brine 140
2000 BUCKEYE OIL PRODUCING CO Brine 75
2001 BUCKEYE OIL PRODUCING CO Brine 246 365
2002 BUCKEYE OIL PRODUCING CO Brine 147 365
2003 BUCKEYE OIL PRODUCING CO Brine 37 365
2004 BUCKEYE OIL PRODUCING CO Brine 199 365
2005 BUCKEYE OIL PRODUCING CO Brine 135 365
2006 BUCKEYE OIL PRODUCING CO Brine 131 365
2007 BUCKEYE OIL PRODUCING CO Brine 183 365
2008 BUCKEYE OIL PRODUCING CO Brine 138 365
2009 BUCKEYE OIL PRODUCING CO Brine 76 365
2010 BUCKEYE OIL PRODUCING CO Brine 75 365
2011 BUCKEYE OIL PRODUCING CO Brine 72 365
2012 BUCKEYE OIL PRODUCING CO Brine 83 366
2013 BUCKEYE OIL PRODUCING CO Brine 75 365
2014 BUCKEYE OIL PRODUCING CO Brine 141 365
2015 BUCKEYE OIL PRODUCING CO Brine 145 365
2016 BUCKEYE OIL PRODUCING CO Brine 75 365
2017 BUCKEYE OIL PRODUCING CO Brine 158 365
2018 BUCKEYE OIL PRODUCING CO Brine 114 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1549518688 2006-10-4 0:00: PW No Violations
1367974274 2013-05-07 Production Wells No Violations I received a call from an adjacent landowner, Dave Dingey, about a line break around 650pm. A neighbor, Kevin Morrow, was brush hogging field and hit steel line. I arrived on location around 820pm. The line was cut in half and sprayed thick brine out about 15 feet. The well was not actively pumping so brine was not actively flowing out of line. I got a hold of Gail Wolvoltd, with Buckeye Oil prior to arriving on location, and he got in contact with a well pumper. He turned off the breaker for the pump and shut the valves. They will begin clean up tomorrow morning. They will also repair the stuffing box and clean up around wellhead.
1368201573 2013-05-10 Production Wells No Violations Operator has cleaned up the contamination, repaired and buried the line 30 deep, and covered the area with seed and mulch. Lime was mixed in with the dirt in order to help with the bioremediation. I will revisit the location in a month to make sure there is vegetative growth.
1545856492 2013-01-22 Production Wells No Violations I inspected the well location and found well head and tank battery with no issues. Tank Battery in good condition. There are three 100 barrel tanks in dike.
1549518688 2006-10-04 Production Wells No Violations No violations noted, well is equipped with 3-100 bbl tanks and pump jack and tubing&rods,dike work needed around tanks talked to well tender and he stated that he was planning on removing 1-100 bbl from site and when he did he would perform work on dike.

For data sources see[8]

References