If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-20034 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.76,"lon":-81.99,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: York Township | |
Operator Name: TEMPLE OIL & GAS CO | |
Well Pad ID: | |
Farm/Lease Name: TIDBAUGH ETAL | |
License Status: Producing | |
License Date: 2004-11-26 | |
Spud Date: 2004-12-14 | |
Spud Drilling Contractor: TEMPLE OIL & GAS | |
Final Drill Date: 2005-02-05 | |
Well Total Depth: 4074.00 ft | |
Configuration: Vertical | |
Latitude: 39.760000 | |
Longitude: -81.990000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1937-02-03 | |
Plugged/Abandoned | 1975-06-04 | |
APP | 2004-11-26 | Proposed Formations:BEREA, Issued Date:11/26/2004, Expired Date:11/26/2005 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2005-02-05 | |
Reached Total Depth | 2005-02-05 | |
Completion Report Received | 2005-09-30 | |
Construction Permit Expires | 2005-11-26 | |
Record Last Modified | 2017-05-25 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2005-11-23 | 1213 | 1230 | 10 |
2005-11-23 | 1267 | 1287 | 7 |
1213 | 1230 | 10 | |
1267 | 1287 | 7 | |
1213 | 1230 | 10 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | TEMPLE OIL & GAS CO | 459.00 | 188.00 | 195 |
2006 | TEMPLE OIL & GAS CO | 394.00 | 99.00 | 244 |
2007 | TEMPLE OIL & GAS CO | 54.00 | 32.00 | 313 |
2008 | TEMPLE OIL & GAS CO | 56.00 | 50.00 | 365 |
2009 | TEMPLE OIL & GAS CO | 34.00 | 68.00 | 261 |
2010 | TEMPLE OIL & GAS CO | 10.00 | 0.00 | 313 |
2011 | TEMPLE OIL & GAS CO | 89.00 | 0.00 | 365 |
2012 | TEMPLE OIL & GAS CO | 67.00 | 33.00 | 366 |
2013 | TEMPLE OIL & GAS CO | 41.00 | 36.00 | 365 |
2014 | TEMPLE OIL & GAS CO | 43.00 | 35.00 | 365 |
2015 | TEMPLE OIL & GAS CO | 45.00 | 0.00 | 365 |
2016 | TEMPLE OIL & GAS CO | 42.00 | 26.00 | 365 |
2017 | TEMPLE OIL & GAS CO | 33.00 | 29.00 | 365 |
2018 | TEMPLE OIL & GAS CO | 20.00 | 11.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | TEMPLE OIL & GAS CO | Brine | 310 | 195 |
2006 | TEMPLE OIL & GAS CO | Brine | 162 | 244 |
2007 | TEMPLE OIL & GAS CO | Brine | 98 | 313 |
2008 | TEMPLE OIL & GAS CO | Brine | 0 | 365 |
2009 | TEMPLE OIL & GAS CO | Brine | 87 | 261 |
2010 | TEMPLE OIL & GAS CO | Brine | 61 | 313 |
2011 | TEMPLE OIL & GAS CO | Brine | 1905 | 365 |
2012 | TEMPLE OIL & GAS CO | Brine | 52 | 366 |
2013 | TEMPLE OIL & GAS CO | Brine | 49 | 365 |
2014 | TEMPLE OIL & GAS CO | Brine | 42 | 365 |
2015 | TEMPLE OIL & GAS CO | Brine | 45 | 365 |
2016 | TEMPLE OIL & GAS CO | Brine | 70 | 365 |
2017 | TEMPLE OIL & GAS CO | Brine | 15 | 365 |
2018 | TEMPLE OIL & GAS CO | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2124994722 | 2007-3-1 0:00:0 | PW | No Violations | |
-844501463 | 2005-2-2 0:00:0 | DD | No Violations | |
0844501463 | 2005-02-02 | Drill / Deepen / Reopen | No Violations | Stopped by cable tool rig for update they were attempting to get tools out of hole they were stuck in hole at approximately 1150. |
1133019153 | 2005-11-25 | Preliminary Restoration | No Violations | Well was recently reopened be Temple Oil Gas to Berea sands,well is equipped with pump jack and 1-100 bbl tank with dike in place,location has been reclaimed and vegetation on site has been established. |
1865007069 | 2004-12-14 | Drill / Deepen / Reopen | No Violations | Cable tool rig on site to reopen up old hole(Temples rig should be running conductor pipe later on in week informed rig operator to call when there ready to mud in casing. |
2124994722 | 2007-03-01 | Production Wells | No Violations | Well was reopened back in 2004 and cleaned out to Berea sand well is equipped with pump jack and tubing and rods and 1-100 bbl tank unable to get GPS reading due to tree cover. |
For data sources see[9]