If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24264 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.58,"lon":-81.08,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Benton Township | |
Operator Name: BECK ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: CISLER HARRY | |
License Status: Producing | |
License Date: 2009-12-21 | |
Spud Date: 2010-03-25 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2010-03-04 | |
Well Total Depth: 5820.00 ft | |
Configuration: Vertical | |
Latitude: 39.580000 | |
Longitude: -81.080000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-12-21 | Proposed Formations:GORDON TO MARCELLUS SHALE, Issued Date:12/21/2009, Expired Date:12/21/2010 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-03-04 | |
Completion Report Received | 2010-10-27 | |
Construction Permit Expires | 2010-12-21 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-12-29 | 5640 | 5716 | 160 |
5640 | 5716 | 160 | |
5640 | 5716 | 160 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1441116 Gal | 340000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | BECK ENERGY CORPORATION | 8491.00 | 0.00 | 365 |
2011 | BECK ENERGY CORPORATION | 17077.00 | 13.00 | 365 |
2012 | BECK ENERGY CORPORATION | 8680.00 | 49.00 | 366 |
2013 | BECK ENERGY CORPORATION | 10308.00 | 25.00 | 365 |
2014 | BECK ENERGY CORPORATION | 6891.00 | 39.00 | 365 |
2015 | BECK ENERGY CORPORATION | 6145.00 | 39.00 | 365 |
2016 | BECK ENERGY CORPORATION | 4559.00 | 0.00 | 365 |
2017 | BECK ENERGY CORPORATION | 4400.00 | 33.00 | 365 |
2018 | BECK ENERGY CORPORATION | 2491.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | BECK ENERGY CORPORATION | Brine | 1632 | 365 |
2011 | BECK ENERGY CORPORATION | Brine | 2360 | 365 |
2012 | BECK ENERGY CORPORATION | Brine | 831 | 366 |
2013 | BECK ENERGY CORPORATION | Brine | 759 | 365 |
2014 | BECK ENERGY CORPORATION | Brine | 445 | 365 |
2015 | BECK ENERGY CORPORATION | Brine | 332 | 365 |
2016 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2017 | BECK ENERGY CORPORATION | Brine | 68 | 365 |
2018 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1892476693 | 2010-9-30 0:00: | PW | No Violations | 1.00 |
-255921289 | 2010-12-9 0:00: | PW | No Violations | 1.00 |
-258207896 | 2010-6-20 0:00: | DD | No Violations | |
-510348214 | 2010-5-28 0:00: | CT | No Violations | 1.50 |
-64325211 | 2010-3-4 0:00:0 | DD | No Violations | |
-729002191 | 2010-9-27 0:00: | PW | No Violations | 0.20 |
-833424030 | 2010-10-25 0:00 | PL | No Violations | 2.00 |
0064325211 | 2010-03-04 | Drill / Deepen / Reopen | No Violations | On day of inspection the cement crew were just leaving the location and I talked to the landowner. |
0230054398 | 2010-09-22 | Preliminary Restoration | No Violations | On day of inspection Stonerock and I met with Ray Beck, Becky Simms, Harry Cisler at the site on the restoration work. They were suggested to call Monroe County Soil and Water on plans for vegetating site. |
0255921289 | 2010-12-09 | Production Wells | No Violations | On day of inspection well is producing and location is snow covered. Can not see vegetation under snow cover. Will check back at later date.NOV resolved |
0258207896 | 2010-06-20 | Drill / Deepen / Reopen | No Violations | A Michelle Debolt called a complaint on 6-19-2010 in on a large amount of slur going down a creek near where her livestock is kept. Address is at 41600 Trail Run rd.(cty rd 12 in Benton twp.)She states that she has to pack water to animals. Call was sent at 9:30pm. She states that as dry as it has been that a large amount has came down creek with a red tint. There is a heavy sediment. She had called the Monroe Sheriff Department and a deputy Rinard was sent and then OEPA hotline was called.Stonerock could not reach me and sent Dave Ball to inspect the situation. I called after getting message. |
0510348214 | 2010-05-28 | Completion Testing | No Violations | On day of inspection well was not fraced yet and pit was full and ready to go. |
0729002191 | 2010-09-27 | Production Wells | No Violations | On this day Monroe county Soil and Water called on well. Dave Shot called and wanted to know what would be required of the State Of Ohio for vegetation. Harry Cisler called him and stated that they only had till Oct.15 to get location established w/vegetation. They would do a no till approach. |
0773170124 | 2018-04-04 | Production Wells | No Violations | On this day, I found the well equipped with 4.5 inch diameter casing with the valve open and 2.375 inch diameter tubing with the valve open. It is being produced by means of a pumping unit with an electric motor, tubing, and rods. There are (2) 210 barrel steel tanks, a drip tank, horizontal separator, and an orifice meter all contained within an earthen dike. The tank is properly identified and the production records are current. |
0833424030 | 2010-10-25 | Preliminary Restoration | No Violations | On day of inspection site is starting to vegetate in. Took pictures. There was winter wheat and barley drilled in with no till drill. Did not pass on day of inspection. Will check back at later date. |
1268842591 | 2010-02-25 | Drill / Deepen / Reopen | No Violations | Universal was mudding up hole thru the drill pipe and getting ready to trip pipe out of hole and run casing in. |
1278508985 | 2010-06-21 | Completion Testing | Violations Noted | On day of inspection the Marcellus frac pit was cut with a track hoe. Rob Armstrong was on the track hoe and son Mike Armstrong was on the dozer. They were told to close the gash over and stop releasing the water. The large pit that was containing over 2.5million gallons of water was 2/3 of the way empty. Samples and pictures were taken. There were four 500bbl tanks and two were being used for flowback.Two trucks that had Alpha drilling on the door removed two of the four tanks. |
1279061278 | 2010-07-08 | Completion Testing | No Violations | On day of inspection OEPA and I went out to look at the site.There were still two 500bbl tanks on site.We will check at later date to see if all fluid has been hauled off of the well. |
1287488830 | 2010-10-13 | Preliminary Restoration | No Violations | On day of inspection Stonerock and I looked at the site. There had been a no till drill brought in and some vegetation has just come up through the soil. Will check back at later date.Preliminary restoration did not pass on this date. |
1397105993 | 2010-06-21 | Drill / Deepen / Reopen | No Violations | On this day of inspection of the said complaint I had stopped by the sheriff department and talked to them about the call that was called in by Michelle Debolt.Dennis Deavers called and also let me know. I went to complaintants house to meet with her and get her story. Then I went to Harry Cisler no.3 to check the pit where there was going be a large Marcellus frac and found that Rob Armstrong cut a large cut with a track-hoe about 10x15tall and let the pit go. The red sediment was from the pit wall that was cut and flushed down the creek. Pictures and samples were taken. |
1430168135 | 2010-06-24 | Completion Testing | No Violations | On day of inspection OEPA and I went in to the site to take soil samples and pictures. We stopped to talk to the Michel Debolt.She was the complainant. I got a witness statement from her. |
1892476693 | 2010-09-30 | Production Wells | No Violations | On day of inspection met with OEPA and USEPA on this site. They wanted to check status of well and what the status of our consent agreement was. |
230054398 | 2010-9-22 0:00: | PL | No Violations | 2.50 |
499854326 | 2020-3-6 0:00:0 | PW | No Violations | 0.40 |
773170124 | 2018-4-4 0:00:0 | PW | No Violations | 0.50 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1278508985 | US-OH-107738 | 2010-07-07 | Pollution and contamination | |
1278508985 | US-OH-107739 | 2010-07-07 | Pit incapable of preventing escape of brine or other wastes |
For data sources see[9]