If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24184 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74,"lon":-81.22,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Wayne Township | |
Operator Name: BECK ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: DENBOW | |
License Status: Producing | |
License Date: 2008-03-06 | |
Spud Date: 2008-04-03 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2008-04-08 | |
Well Total Depth: 2640.00 ft | |
Configuration: Vertical | |
Latitude: 39.740000 | |
Longitude: -81.220000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-03-06 | Proposed Formations:BEREA/30 FOOT/GORDON, Issued Date:3/6/2008, Expired Date:3/6/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-04-08 | |
Completion Report Received | 2008-09-29 | |
Construction Permit Expires | 2009-03-06 | |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-12-19 | 2276 | 2300 | 34 |
2008-12-19 | 2000 | 2010 | 25 |
2000 | 2010 | 25 | |
2276 | 2300 | 34 | |
2410 | 2446 | 42 | |
2514 | 2570 | 6 | |
2000 | 2010 | 25 | |
2008-12-19 | 2514 | 2570 | 6 |
2008-12-19 | 2410 | 2446 | 42 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 0 | 2ND STAGE OF 3-STAGE FRAC… ONLY A SINGLE FRAC VOLUME AND NO TREATMENT OR RESERVOIR PRESSURES WERE REPORTED | ||
H2O | 0 | 213700 Gal | 0 | FRACED INTERVAL INCLUDES THE FIFTH SAND… 1ST STAGE OF 3-STAGE FRAC… ONLY A SINGLE FRAC VOLUME AND NO TREATMENT OR RESERVOIR PRESSURES WERE REPORTED | ||
H2O | 0 | 0 | 0 | 3RD STAGE OF 3-STAGE FRAC… ONLY A SINGLE FRAC VOLUME AND NO TREATMENT OR RESERVOIR PRESSURES WERE REPORTED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | BECK ENERGY CORPORATION | 936.00 | 24.00 | 0 |
2009 | BECK ENERGY CORPORATION | 2471.00 | 31.00 | 365 |
2010 | BECK ENERGY CORPORATION | 3397.00 | 27.00 | 365 |
2011 | BECK ENERGY CORPORATION | 2409.00 | 0.00 | 365 |
2012 | BECK ENERGY CORPORATION | 2113.00 | 0.00 | 366 |
2013 | BECK ENERGY CORPORATION | 1753.00 | 0.00 | 365 |
2014 | BECK ENERGY CORPORATION | 1411.00 | 0.00 | 365 |
2015 | BECK ENERGY CORPORATION | 1041.00 | 0.00 | 365 |
2016 | BECK ENERGY CORPORATION | 867.00 | 0.00 | 365 |
2017 | BECK ENERGY CORPORATION | 1031.00 | 0.00 | 365 |
2018 | BECK ENERGY CORPORATION | 894.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | BECK ENERGY CORPORATION | Brine | 0 | |
2009 | BECK ENERGY CORPORATION | Brine | 207 | 365 |
2010 | BECK ENERGY CORPORATION | Brine | 61 | 365 |
2011 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2012 | BECK ENERGY CORPORATION | Brine | 0 | 366 |
2013 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2014 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2015 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2016 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2017 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2018 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1737970574 | 2018-08-14 | Preliminary Restoration | No Violations | On this day, I am conducting a preliminary restoration inspection and found the site meets ORC 1509.072 (A) with vegetation established and no substantial erosion. The well is equipped with 4.5 inch diameter casing and 1.9 inch diameter tubing with the production valves open. It is produced by means of a pumping unit with rods and a gas engine. The production facility consists of (1) 100 barrel steel tank, drip tank, vertical separator, and an orifice sales meter all contained within an earthen dike. The production records are current and the tank is properly identified. |
For data sources see[9]