If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-22791 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.15,"lon":-81.71,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Granger Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: SHADE | |
License Status: Producing | |
License Date: 1981-11-13 | |
Spud Date: 1981-11-21 | |
Spud Drilling Contractor: | |
Final Drill Date: 1981-11-29 | |
Well Total Depth: 3675.00 ft | |
Configuration: Vertical | |
Latitude: 41.150000 | |
Longitude: -81.710000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1981-11-13 | 212 WATERCO INC GeoDate 11/13/81 |
Original Spud | 1981-11-21 | |
Completed | 1981-11-29 | |
Reached Total Depth | 1981-11-29 | |
Change of Owner | 2001-01-29 | Operator changed from 212, WATERCO INC to 70, WALDRON DAVID A & ASS INC |
Change of Owner | 2016-10-11 | Operator changed from 70, DAVID A WALDRON & ASSOC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2016-10-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3523 | 3567 | 37 |
3523 | 3567 | 37 | |
3523 | 3567 | 37 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 70750 Gal | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | HADCO INC | 22208.00 | 5993.00 | 365 |
1985 | HADCO INC | 24730.00 | 3782.00 | 202 |
1986 | HADCO INC | 24971.00 | 2393.00 | 273 |
1987 | HADCO INC | 13256.00 | 1201.00 | 186 |
1988 | HADCO INC | 15686.00 | 1087.00 | 365 |
1989 | HADCO INC | 10977.00 | 734.00 | 365 |
1990 | SHADCO INC | 9278.00 | 541.00 | 365 |
1991 | SHADCO INC | 3009.00 | 427.00 | 365 |
2001 | DAVID A WALDRON & ASSOC | 1453.00 | 155.00 | 365 |
2002 | DAVID A WALDRON & ASSOC | 1415.00 | 80.00 | 365 |
2003 | DAVID A WALDRON & ASSOC | 1282.00 | 146.00 | 365 |
2004 | DAVID A WALDRON & ASSOC | 0.00 | 125.00 | 365 |
2005 | DAVID A WALDRON & ASSOC | 800.00 | 73.00 | 365 |
2006 | DAVID A WALDRON & ASSOC | 920.00 | 80.00 | 365 |
2007 | DAVID A WALDRON & ASSOC | 915.00 | 106.00 | 365 |
2008 | DAVID A WALDRON & ASSOC | 930.00 | 114.00 | 365 |
2009 | DAVID A WALDRON & ASSOC | 878.00 | 118.00 | 365 |
2010 | DAVID A WALDRON & ASSOC | 701.00 | 103.00 | 365 |
2011 | DAVID A WALDRON & ASSOC | 741.00 | 51.00 | 365 |
2012 | DAVID A WALDRON & ASSOC | 532.00 | 93.00 | 366 |
2013 | DAVID A WALDRON & ASSOC | 687.00 | 72.00 | 365 |
2014 | DAVID A WALDRON & ASSOC | 736.00 | 88.00 | 365 |
2015 | DAVID A WALDRON & ASSOC | 645.00 | 76.00 | 365 |
2016 | DAVID A WALDRON & ASSOC | 693.00 | 106.00 | 365 |
2017 | PIN OAK ENERGY PARTNERS LLC | 444.00 | 71.00 | 365 |
2018 | PIN OAK ENERGY PARTNERS LLC | 180.00 | 70.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | HADCO INC | Brine | 131 | 365 |
1985 | HADCO INC | Brine | 77 | 202 |
1986 | HADCO INC | Brine | 62 | 273 |
1987 | HADCO INC | Brine | 38 | 186 |
1988 | HADCO INC | Brine | 40 | 365 |
1989 | HADCO INC | Brine | 35 | 365 |
1990 | SHADCO INC | Brine | 35 | 365 |
1991 | SHADCO INC | Brine | 0 | 365 |
2001 | DAVID A WALDRON & ASSOC | Brine | 40 | 365 |
2002 | DAVID A WALDRON & ASSOC | Brine | 41 | 365 |
2003 | DAVID A WALDRON & ASSOC | Brine | 40 | 365 |
2004 | DAVID A WALDRON & ASSOC | Brine | 0 | 365 |
2005 | DAVID A WALDRON & ASSOC | Brine | 62 | 365 |
2006 | DAVID A WALDRON & ASSOC | Brine | 80 | 365 |
2007 | DAVID A WALDRON & ASSOC | Brine | 113 | 365 |
2008 | DAVID A WALDRON & ASSOC | Brine | 0 | 365 |
2009 | DAVID A WALDRON & ASSOC | Brine | 97 | 365 |
2010 | DAVID A WALDRON & ASSOC | Brine | 102 | 365 |
2011 | DAVID A WALDRON & ASSOC | Brine | 100 | 365 |
2012 | DAVID A WALDRON & ASSOC | Brine | 70 | 366 |
2013 | DAVID A WALDRON & ASSOC | Brine | 100 | 365 |
2014 | DAVID A WALDRON & ASSOC | Brine | 90 | 365 |
2015 | DAVID A WALDRON & ASSOC | Brine | 105 | 365 |
2016 | DAVID A WALDRON & ASSOC | Brine | 35 | 365 |
2017 | PIN OAK ENERGY PARTNERS LLC | Brine | 75 | 365 |
2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-114882407 | 2015-7-27 0:00: | PW | No Violations | |
-2137486344 | 2013-10-24 0:00 | PW | No Violations | |
0114882407 | 2015-07-27 | Production Wells | No Violations | Inspected production well on 07/27/2015. The tank battery consists of 1-210 bbl steel tank, 1-50 bbl steel tank, 2-vertical separators, and 1-compressor station located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. S&H was hauling off water from the tanks at the time of the inspection. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
1452322398 | 2013-10-24 | Production Wells | No Violations | Inspected production well on 10/24/2013. Tank battery consists of 1-210 bbl tank, 1-50 bbl tank, 2 separators, and a small compressor station located on a gravel pad within an earthen dike. Tank battery is utilized by multiple wells; well identification for all wells utilizing the tank battery is posted. Wellhead is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead. No problems were noted at the time of the inspection. |
1776157380 | 2004-04-19 | Production Wells | No Violations | Wellin production. Pumper cleaning well head. Windy 70 degrees. |
2137486344 | 2013-10-24 | Production Wells | No Violations | Inspected production well on 10/24/2013. Tank battery consists of 1-210 bbl tank, 1-50 bbl tank, 2 separators, and a small compressor station on a gravel pad within an earthen dike. Tank battery is used by multiple wells; identification for all wells using tank battery is posted. Wellhead is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead. No problems were noted at the time of the inspection. |
For data sources see[9]