If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-22026 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.09,"lon":-82.01,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Chatham Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: DUMECK NICK | |
License Status: Producing | |
License Date: 1979-10-29 | |
Spud Date: 1979-12-15 | |
Spud Drilling Contractor: CO TOOLS | |
Final Drill Date: 1980-01-31 | |
Well Total Depth: 559.00 ft | |
Configuration: Vertical | |
Latitude: 41.090000 | |
Longitude: -82.010000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1979-10-29 | 475 R & E ENTERPRISES GeoDate 10/29/79 |
Original Spud | 1979-12-15 | R.I. 10-31-79 FDT=RED |
Completed | 1980-01-31 | R.I. 10-31-79 FDT=RED |
Reached Total Depth | 1980-01-31 | R.I. 10-31-79 FDT=RED |
Completion Report Received | 1982-01-20 | R.I. 10-31-79 FDT=RED |
Change of Owner | 2004-06-02 | Operator changed from 475, R & E ENTERPRISES to 337, HARLEY DRILLING & PRODUCI |
Record Last Modified | 2017-02-15 | R.I. 10-31-79 FDT=RED |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 465 | 540 | 0 |
465 | 540 | 0 | |
465 | 540 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
NITR | 0 | 112 Qts | 0 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1372081861 | 2014-5-29 0:00: | PW | No Violations | |
000PL12377 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
1372081861 | 2014-05-29 | Production Wells | No Violations | Inspected production well on 05/29/2014. The tank battery consists of 3-100 bbl steel tanks located within an earthen dike. The well is equipped with a pump jack with an electric motor. No well identification is posted at either the tank battery or the wellhead (both are required as the tank battery is utilized by multiple wells). Oil and paraffin were noted on the ground around the wellhead and will need to be cleaned up. Steve Harley with Harley Drilling was notified of these issues and will address them as soon as possible. No other problems were noted at the time of the inspection. |
PL12377 | PL | No Violations |
For data sources see[9]