X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-20342

Well Details

Well ID: 34-099-20342
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Milton Township
Operator Name: COLUMBIA GAS TRANSMISSION LLC
Well Pad ID:
Farm/Lease Name: PICO-FENTON UNIT
License Status: Dry and Abandoned
License Date: 1973-08-31
Spud Date: 1973-11-01
Spud Drilling Contractor:
Final Drill Date: 1974-08-01
Well Total Depth: 4961.00 ft
Configuration: Vertical
Latitude: 41.070000
Longitude: -80.960000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1973-08-31 22 COLUMBIA GAS TRANSMISSION GeoDate 8/31/73
Original Spud 1973-11-01
Plugged/Abandoned 1974-06-28
Completed 1974-08-01
Reached Total Depth 1974-08-01
Record Last Modified 2009-12-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4765 4824 15
4765 4824 15
4765 4824 15

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 200 Gal 22000 15N

For data sources see[4]

References