X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-093-20399

Well Details

Well ID: 34-093-20399
Loading map...
Country: United States
State: Ohio
County: Lorain
Municipality: Pittsfield Township
Operator Name: COLUMBIA GAS TRANSMISSION LLC
Well Pad ID:
Farm/Lease Name: WALLACE (MILLER)
License Status: Final Restoration
License Date: 2003-06-03
Spud Date: 1945-08-08
Spud Drilling Contractor:
Final Drill Date: 1956-04-03
Well Total Depth: 4230.00 ft
Configuration: Vertical
Latitude: 41.220000
Longitude: -82.230000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1945-08-08 ORIGINALLY COMPLETED 1/16/1946. CONVERTED TO STORAGE: 05/01/1990. STORAGE I.P. = TOTAL RETURN 40 BBL, 254 MCF.
Reached Total Depth 1956-04-03 ORIGINALLY COMPLETED 1/16/1946. CONVERTED TO STORAGE: 05/01/1990. STORAGE I.P. = TOTAL RETURN 40 BBL, 254 MCF.
CO 1990-03-12 22 COLUMBIA GAS TRANSMISSION GeoDate 3/12/90
Gas Storage 1990-03-12 Issued Date 3/12/90 Expired Date 3/12/91 Acres 0046840 Tool Type NT Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
Completed 1990-05-01 ORIGINALLY COMPLETED 1/16/1946. CONVERTED TO STORAGE: 05/01/1990. STORAGE I.P. = TOTAL RETURN 40 BBL, 254 MCF.
APP 2003-06-03 Proposed Formations:CLINTON, Issued Date:6/3/2003, Expired Date:6/2/2004 6:00:00 AM, Drilling unit acres:46.9, Proposed Well Type:SO, Proposed Well Class:
Plugged/Abandoned 2003-08-29 ORIGINALLY COMPLETED 1/16/1946. CONVERTED TO STORAGE: 05/01/1990. STORAGE I.P. = TOTAL RETURN 40 BBL, 254 MCF.
Construction Permit Expires 2004-06-02 ORIGINALLY COMPLETED 1/16/1946. CONVERTED TO STORAGE: 05/01/1990. STORAGE I.P. = TOTAL RETURN 40 BBL, 254 MCF.
Record Last Modified 2013-03-14 ORIGINALLY COMPLETED 1/16/1946. CONVERTED TO STORAGE: 05/01/1990. STORAGE I.P. = TOTAL RETURN 40 BBL, 254 MCF.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4216 4221 0
2006-09-11 4153 4158 0
2215 2225 0
2215 2225 0
2006-09-11 2215 2225 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
Not Treated 0 26 Bbl 0 KER.
Not Treated 0 800 Gal 0 KER. 1ST R.P. 1000, 2ND ST.PETER 1460
OIL 0 22 Bbl 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 COLUMBIA GAS TRANSMISSION LLC 16472.00 0.00 0
1985 COLUMBIA GAS TRANSMISSION LLC 0.00 0.00 0
1986 COLUMBIA GAS TRANSMISSION LLC 0.00 0.00 0
1987 COLUMBIA GAS TRANSMISSION LLC 0.00 0.00 0
1988 COLUMBIA GAS TRANSMISSION LLC 0.00 0.00 365
1989 CHESAPEAKE APPALACHIA LLC 0.00 0.00 0
1990 CHESAPEAKE APPALACHIA LLC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 COLUMBIA GAS TRANSMISSION LLC Brine 0 0
1985 COLUMBIA GAS TRANSMISSION LLC Brine 0 0
1986 COLUMBIA GAS TRANSMISSION LLC Brine 0 0
1987 COLUMBIA GAS TRANSMISSION LLC Brine 0 0
1988 COLUMBIA GAS TRANSMISSION LLC Brine 0 365
1989 CHESAPEAKE APPALACHIA LLC Brine 0 0
1990 CHESAPEAKE APPALACHIA LLC Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-343217020 2004-2-26 0:00: FR No Violations 0.50
0343217020 2004-02-26 Final Restoration No Violations Final restoration approved. Cloudy, 28 degrees.

For data sources see[9]

References