If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-26175 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.97,"lon":-82.45,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Licking Township | |
Operator Name: ARTEX OIL COMPANY | |
Well Pad ID: | |
Farm/Lease Name: BARTON E | |
License Status: Producing | |
License Date: 2015-11-20 | |
Spud Date: 2015-12-04 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2015-12-15 | |
Well Total Depth: 4438.00 ft | |
Configuration: Vertical | |
Latitude: 39.970000 | |
Longitude: -82.450000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-11-20 | Proposed Formations:KNOX, Issued Date:11/20/2015, Expired Date:11/19/2017 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2015-12-15 | Updated to"PR" status Per Brandon Mitchell Email sent 12/11/2017. MKB |
Completion Report Received | 2016-03-14 | Updated to"PR" status Per Brandon Mitchell Email sent 12/11/2017. MKB |
Construction Permit Expires | 2017-11-19 | Updated to"PR" status Per Brandon Mitchell Email sent 12/11/2017. MKB |
Record Last Modified | 2017-12-15 | Updated to"PR" status Per Brandon Mitchell Email sent 12/11/2017. MKB |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ARTEX OIL COMPANY | 32238.00 | 0.00 | 365 |
2017 | ARTEX OIL COMPANY | 4519.00 | 222.00 | 365 |
2018 | ARTEX OIL COMPANY | 1548.00 | 111.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ARTEX OIL COMPANY | Brine | 884 | 365 |
2017 | ARTEX OIL COMPANY | Brine | 75 | 365 |
2018 | ARTEX OIL COMPANY | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1117785907 | 2016-5-23 0:00: | PL | No Violations | |
-548621637 | 2015-12-4 0:00: | DD | No Violations | |
-734706853 | 2020-6-5 0:00:0 | PW | No Violations | 0.50 |
0138896225 | 2015-12-07 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 8.63 casing on Kilbarger rig #5 for Artex Oil Company. Heath Halstead was on location for Artex. Formation Cementing was contracted to cement casing. Formation broke circulation and good cement returns were observed. A basket was not used. The cement ticket was received. Time of inspection: 11:20 PM. |
0548621637 | 2015-12-04 | Drill / Deepen / Reopen | No Violations | An inspection of this drilling location revealed Kilbarger rig #5 moving in and rigging up during inspection. No violations. Time of inspection: 9:00 AM. Weather: 31*F, Sunny |
0824887656 | 2019-02-04 | Preliminary Restoration | No Violations | My inspection revealed that the preliminary restoration has been completed. The well location contained sufficient vegetation and meets ORC 1509.072 requirements. The tank battery consists of (2) 210 barrel tanks and (1) 100 barrel tank inside an earthen dike. I observed a production unit outside of the dike. Identification was posted at the tank battery. Time of inspection: 2:15 PM. Weather: 63 degrees F, Cloudy |
1075830438 | 2015-12-18 | Completion Testing | No Violations | Inspect well location as part of a status check. The well has been drilled and drilling equipment removed. Bishop Well Service has been contracted for completion operations. No activity during inspection. Time of inspection: 1:50 PM. Weather: 33*F, Overcast |
1117785907 | 2016-05-23 | Preliminary Restoration | No Violations | Inspect location as part of a preliminary restoration status check. The well was equipped with a rabbit wellhead. The location was final graded. Artex has informed me that the landowner would like to waive putting back topsoil as he is preparing construct a building near well location. The tank battery consists of (1) 210 barrel tank inside an earthen dike and a horizontal separator outside the dike. Identification was posted on the tank. No violations. Time of inspection: 3:20 PM. Weather: 75*F, Sunny |
1259707918 | 2015-12-14 | Drill / Deepen / Reopen | No Violations | An inspection of drilling operations revealed that the well has been drilled. The 4.5 casing was cemented on 12/13/2015. The ticket was received. Kilbarger rigging down during inspection. Time of inspection: 8:45 AM. |
138896225 | 2015-12-7 0:00: | DD | No Violations | |
1449502995 | 2015-12-06 | Casing String Witnessed | No Violations | My inspection today was to witness the 11.75 inch conductor casing being cemented into place. 320 foot of the hole was bored with a 17.5 inch bit and the remaining 125 feet of the hole was bored with a 15 inch bit. Formations Cementing cemented with 298 sacks of cement with 1% gel with a 1.26 yield at the weight of 15.2. The rest of the cement that was pumped was 101 sacks of neat cement weighing 15.6 and a 1.12% yield. 24 bbl. of cement was returned to surface. 399 sacks of cement, 300 lbs. of gel, 850 lbs. of accelerator, and 230 lbs. of LCM was used on this job. |
1892642016 | 2015-12-07 | Drill / Deepen / Reopen | No Violations | An inspection of drilling operations revealed Kilbarger rig #5 drilling on air @ 650 feet. No violations. Time of inspection: 9:30 AM. Weather: 34*F, Overcast |
824887656 | 2019-2-4 0:00:0 | PL | No Violations | 0.20 |
For data sources see[7]