If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-087-20645 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":38.42,"lon":-82.58,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Lawrence | |
Municipality: Fayette Township | |
Operator Name: NYTIS EXPLORATION CO LLC | |
Well Pad ID: | |
Farm/Lease Name: LEDCO (LAWRENCE ECONOMIC DEVELOPMENT) | |
License Status: Final Restoration | |
License Date: 2006-04-03 | |
Spud Date: 2006-12-07 | |
Spud Drilling Contractor: TARGET DRLG | |
Final Drill Date: 2007-01-16 | |
Well Total Depth: 2186.00 ft | |
Configuration: Vertical | |
Latitude: 38.420000 | |
Longitude: -82.580000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-09-13 | Proposed Formations:DEVONIAN SHALE, Issued Date:9/13/2005, Expired Date:9/13/2006 6:00:00 AM, Drilling unit acres:34.04, Proposed Well Type:OG, Proposed Well Class:EW |
Correction to Well | 2005-09-16 | TARGET INFORMATION: 1687'NL & 3798'WL OF SEC. 32(S); X= 1,976,490; Y= 156,864; ELEV.= 600' (HORIZONTAL DRILL) |
APP | 2005-10-19 | Proposed Formations:DEVONIAN SHALE, Issued Date:10/19/2005, Expired Date:10/19/2006 6:00:00 AM, Drilling unit acres:34.04, Proposed Well Type:OG, Proposed Well Class:EW |
APP | 2006-04-03 | Proposed Formations:CLINTON, Issued Date:4/3/2006, Expired Date:4/3/2007 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EW |
Correction to Well | 2006-12-15 | CHANGE IN PROPOSED GEOLOGICAL FORMATION, SHOULD BE "OHIO SHALE THRU CLINTON". |
Completed | 2007-01-16 | |
Reached Total Depth | 2007-01-16 | |
Construction Permit Expires | 2007-04-03 | |
Completion Report Received | 2007-06-04 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 0 | 0 |
For data sources see[3]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
2009 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
2010 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
2011 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
2012 | NYTIS EXPLORATION CO LLC | Brine | 0 | 366 |
2013 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
2014 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
2016 | NYTIS EXPLORATION CO LLC | Brine | 0 | 0 |
2017 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1176827083 | 2007-7-23 0:00: | PL | No Violations | |
-1762929540 | 2009-7-23 0:00: | AM | No Violations | |
-1898045268 | 2007-5-8 0:00:0 | DD | No Violations | |
-195894047 | 2006-12-13 0:00 | DD | No Violations | |
-2004928006 | 2007-3-14 0:00: | PL | No Violations | |
-2142897256 | 2008-2-28 0:00: | PW | No Violations | |
-374007436 | 2008-11-20 0:00 | PW | No Violations | |
-671915720 | 2009-12-17 0:00 | PW | No Violations | |
0126206551 | 2007-04-05 | Drill / Deepen / Reopen | Violations Noted | Well casing is leaking gas, the gas can be seen bubbling up in a pool of water that is around the well. Dale Ross is still pumping the pit down. The safety fence is up around the pits. No other work has been done to the site. I called Dave ( NYTIS) on 4-5-07 and informed him of the gas leak and told him that the pit must be filled in their 30 days was up on 3-12-07. Dave told me that he is going to get Dale Ross to finish the work quickly. If not Dave said that he will hire another contractor to do the work. |
0195894047 | 2006-12-13 | Drill / Deepen / Reopen | No Violations | Meeting with Target drilling and TYTIS Will start drilling soon |
0323293537 | 2010-06-14 | Production Wells | No Violations | No fencing around the separators and plastic tanks for the #1 and # 5. I called Jeff Price and he told me that they are holding off the fence until after they plug back the #1. I asked for a letter stating a time line for the plug back and the fencing. |
0360982196 | 2007-08-07 | Production Wells | No Violations | Vegetative cover is good. Well does not have an identification on it or on the well site. Well is not connected to any pipeline and well is not in production yet. |
0374007436 | 2008-11-20 | Production Wells | No Violations | I had received a call from Dave Finley (NYTIS) and he asked if a separator could be installed at the wellhead. I told him of the spacing rules and then we discussed the problem of fencing. This is an urban well and has a good fence around it. The current fence doesnt allow enough space to install the separator inside the fence and meet the spacing requirements. They wanted to install the separator temporarily to see how much water it makes. If it is to be permanent a fence will be installed. I agreed to this because the well is located with in an industrial park. NYTIS has done a good job at following the urban rules for their two wells. I feel that they will comply if the separator is going to stay connected. I inspected the site today and found the separator out side the fence and more than 50 from the wellhead. I did not observe any problems. A plastic brine tank was located with in the fence. All connections were tight and the well was in production. |
0433338946 | 2006-12-26 | Drill / Deepen / Reopen | No Violations | Target Drilling is moving on site. The Drill rig is not on site yet. The rig is being worked on . |
0522539841 | 2007-06-05 | Drill / Deepen / Reopen | No Violations | No restoration has been done to the site after the pits were filled in. Site is rough and no vegetative cover on site. I called Dave Finley and told him that they are past their restoration deadline and that work needs to start soon. Dave told me that Dale Ross is going to move on site 6-26-07. |
0541090295 | 2010-07-20 | UrbanProduction Wells | No Violations | Fence has been extended around tanks and separators. No identification on gate. |
0671915720 | 2009-12-17 | Production Wells | No Violations | Access road has a gate at the entrance. The gate is locked. The gate has a no trespassing sign and a danger no smoking or open flame sign. The gate does not have a urban id. The well has an urban id. A mechanical separator and plastic tank is outside of the fence. There are two separators and two tanks, one for LEDCO #1 and one for LEDCO # 5. Plans have been made to fence in the production equipment and place an id on the gate. |
0851242085 | 2007-03-21 | Preliminary Restoration | Violations Noted | Pits are being pumped down. The safety fence around the pits is down in a few places. I called Dave Finley ( NYTIS ) He said that Ross would take care of this. |
1063822261 | 2007-09-18 | Production Wells | No Violations | No id. No fencing around the well site. Well is not connected to any production lines. I called Dave Finley (NYTIS) and left him a message about the Id and Fence. I requested that they submit in writing their intent to produce the well and include a time line for doing so. |
1134157903 | 2005-12-03 | Drill / Deepen / Reopen | No Violations | Observed drilling and placement of conductor pipe using Zugenfist rig. |
1151139399 | 2007-07-23 | Preliminary Restoration | No Violations | Grass is growing good. Site is in compliance with restoration rules. Well is not in production yet and has no id. There are no leaks and no violations at this time. |
1168272079 | 2007-01-06 | Drill / Deepen / Reopen | No Violations | Target Drilling BOP test 1st test had leaks blew down and fixed leaks. 2nd test 550psi 25min. Good test. 1500psi nitrogen. Good fire extinguishers, rig has fire suppresion system. Fire hydrant on site for water use. Flow line was only 43 has to be min. 60. They are drilling with air. Target is going to extend Flow line to 60. |
1171645958 | 2007-02-15 | Drill / Deepen / Reopen | No Violations | Target Drilling has moved off of the site. Pit has a fence around it. Site looks ok. I have called Nytis and left a message that I need the date that Target moved off site. So I can set the Pit closure date. |
1176827083 | 2007-07-23 | Preliminary Restoration | No Violations | Grass is growing good. Site is in compliance with restoration rules. Well is not in production yet and has no id. There are no leaks and no violations at this time. |
1190234754 | 2007-09-19 | Administrative Inspection | No Violations | I received a call from Richard Finucane (NYTIS) 606-739-9243 ext. 306. They are going to put an id on the well. They are currently working on right of ways for their pipe line. They are going with Gather Co. He said that they are working hard to get the well in production. I told Richard that they need a fence around the well. |
1213640052 | 2008-06-09 | Production Wells | No Violations | Excellent example of an urban site. Id is right. Fencing is correct. Good vegetative growth. All equipment is professionally installed and painted. Pipe line has been installed. |
126206551 | 2007-4-5 0:00:0 | DD | No Violations | |
1364995102 | 2013-04-02 | UrbanProduction Wells | No Violations | Accompanied Morgan Button MRI 2 on inspection of the well. Good identification on the fence. Well is producing. |
1364995700 | 2013-04-02 | UrbanProduction Wells | No Violations | Jon Scott took me to this well site and other LEDCO lease wells to inspect good examples of urban township production wells, urban well identification signs, fence construction, etc. I took pictures of signs and fence to use as good examples future urban well inspections. Besides the wellhead there were two 2000-gallon poly tanks to store brine and two low profile liquid/gas separators used for this well and the LEDCO #5 (API3408720670) and a small knockout tank used on the LEDCO #5 (API # 3408720670) gas production line. |
1419660442 | 2007-07-09 | Preliminary Restoration | No Violations | Site is seeded and mulched no vegetative cover is established yet. No production equipment has been installed yet. |
1490829248 | 2007-05-23 | Drill / Deepen / Reopen | No Violations | Dirt still rough no seed or mulch on site. |
1762929540 | 2009-07-23 | Administrative Inspection | No Violations | Called Jeff Price (NYTIS) I told Jeff that the seperator must have a fence around it to comply with urban rules. They need a gate on the lease road. |
1856446970 | 2007-03-22 | Drill / Deepen / Reopen | No Violations | Met Dale Ross ( Sub-contractor for NYTIS ) He is pumping the pits and he has fixed the safety fence around the pits. |
1898045268 | 2007-05-08 | Drill / Deepen / Reopen | No Violations | Site needs to be graded and seeded and mulched. Ground is dry. No id or fencing on site. No production equipment on site. |
1981020747 | 2007-04-17 | Drill / Deepen / Reopen | No Violations | Pit is filled in. Gravel has been placed around the wellhead. Cannot detect gas leak at this time. Center of pit is GPS +/- 10 N38.42778 W082.58817. |
2004928006 | 2007-03-14 | Preliminary Restoration | No Violations | The pit is being pumped down. They are not done yet. Ross is pumping it down. Safety fence is down in several places. I am going to call the company and request that they inform me when the pit is going to be closed. |
2127938614 | 2007-01-18 | Drill / Deepen / Reopen | No Violations | Frac tank being pumped out. Every looks ok at this time. |
2142897256 | 2008-02-28 | Production Wells | No Violations | Well is not connected to the main line. The line is being installed at this time. The location looks good. The id and fencing will be installed after the well is connected to the main line. Production equipment is on site. |
323293537 | 2010-6-14 0:00: | PW | No Violations | 0.70 |
360982196 | 2007-8-7 0:00:0 | PW | No Violations | |
433338946 | 2006-12-26 0:00 | DD | No Violations | |
522539841 | 2007-6-5 0:00:0 | DD | No Violations | |
541090295 | 2010-7-20 0:00: | UP | No Violations | |
851242085 | 2007-3-21 0:00: | PL | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0126206551 | US-OH-107065 | 2007-04-09 | Failure to comply with permit conditions | |
0851242085 | US-OH-129683 | 2007-03-21 | General Safety |
For data sources see[6]